Paul Joseph Pieri
- Listed as
- architect, engineer
- Firm
- Bhw Engineers Llc.
- Based in
- Larkspur
- On San Francisco permits
- Nov 2005 to Sep 2018
13 permits since 2000 (engineer on 11 permits, architect on 3 permits): 9 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2018 | Completed final sign-off Feb 2021 | 75 Casa Wy | Ordway Construction Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. install new grade beams hold downs, footing and shears. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. install new grade beams hold downs, footing and shears. n/a for maher | $85,000 |
| Aug 22, 2017 | Expired or cancelled withdrawn Nov 2017 | 3526 Anza St | drain repair, partial slab repairDetails
drain repair, partial slab repair | $20,000 | |
| Jan 8, 2016 | Completed final sign-off May 2017 | 1831 Pacific Av | comply with soft story ordinance by adding to foundation/clips and sheer walls etc per cbc 2013 other rational design.Details
comply with soft story ordinance by adding to foundation/clips and sheer walls etc per cbc 2013 other rational design. | $60,000 | |
| May 9, 2014 | Completed final sign-off Oct 2017 | 1718 Baker St | Northcoast Remodeling & Construction | remove and replace extg deck, rail and stair system at backyard. install new structural post footing per engineers drawings. replace in kind, required 2nd means of egress. same size & same location.Details
remove and replace extg deck, rail and stair system at backyard. install new structural post footing per engineers drawings. replace in kind, required 2nd means of egress. same size & same location. | $50,000 |
| May 8, 2014 | Completed final sign-off Mar 2015 | 3415 Divisadero St | Ajamian Enterprises | install shear wall at existing structure at backyard. replacing existing brace frame.Details
install shear wall at existing structure at backyard. replacing existing brace frame. | $4,200 |
| Mar 18, 2014 | Completed final sign-off Sep 2014 | 536 Foerster St | revision to pa #2013.0204.9426: comply w/nov #201252243 & 201252244 - minor structural changes to the previously approved deck. no change in size or height.Details
revision to pa #2013.0204.9426: comply w/nov #201252243 & 201252244 - minor structural changes to the previously approved deck. no change in size or height. | ||
| Feb 5, 2014 | Expired or cancelled cancelled Jan 2026 | 1124 Harrison St | voluntary seismic upgradeDetails
voluntary seismic upgrade | $55,000 | |
| Dec 9, 2013 | Completed final sign-off Apr 2014 | 56 Winfield St | Stellar Construction | modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repairDetails
modification existing 201306260577. original permit stated 40% modification to rear decks. actual replacement is 90-100% in kind dry rot repair | $5,000 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 428 Wawona St | shore, replace partial foundation due to water main break. replace rear windows/sliderDetails
shore, replace partial foundation due to water main break. replace rear windows/slider | $80,000 | |
| Dec 30, 2011 | Completed final sign-off Feb 2014 | 711 Broderick St | Wick Brothers Construction | 1. seismic retroift 2. remodel (e) two floors. 3. add an attic, turret & roof deck at roof. 4. kitchen remodel. 5. new master bath & remodel (e) bath. 6. fire sprinkerls.Details
1. seismic retroift 2. remodel (e) two floors. 3. add an attic, turret & roof deck at roof. 4. kitchen remodel. 5. new master bath & remodel (e) bath. 6. fire sprinkerls. | $275,000 |
| Nov 20, 2009 | Completed final sign-off Oct 2010 | 5440 Mission St | Chris Wadleigh | revision to appl #200911060720 -reduction in scope - trench for new conduit only. not total demolition of (e) pad.Details
revision to appl #200911060720 -reduction in scope - trench for new conduit only. not total demolition of (e) pad. | |
| Oct 27, 2008 | Completed final sign-off Nov 2009 | 28 Flint St | Donald Lewis Gen. Contr.Inc. | interior finish w/o structural changes with steel post upgrade of utility area presently unfinished. utility to include 1/2 bathroom area for use of both condo units. installation of rear garden landscape plan. utility room to include electric heat & tankless water heater.Details
interior finish w/o structural changes with steel post upgrade of utility area presently unfinished. utility to include 1/2 bathroom area for use of both condo units. installation of rear garden landscape plan. utility room to include electric heat & tankless water heater. | $69,000 |
| Nov 3, 2005 | Expired or cancelled expired Jun 2008 | 350 Union St | membrane repair of interioir court and use existing drainage system, flashing shingle repoair, fire repairDetails
membrane repair of interioir court and use existing drainage system, flashing shingle repoair, fire repair | $60,000 |