Yoo Jung Kim
- Listed as
- authorized agent-others, contractor
- Firm
- Sh Painting And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Aug 2026
14 permits since 2000 (contractor on 14 permits, authorized agent-others on 1 permit): 13 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 667 London St | Sh Painting And Construction Inc | to comply with nov 202659160: legalize ground floor laundry center and update electrical and plumbing as needed. correct elecrtical and plumbing hook ups as needed. install dryer exhaust and exhaust ducting for dryer.Details
to comply with nov 202659160: legalize ground floor laundry center and update electrical and plumbing as needed. correct elecrtical and plumbing hook ups as needed. install dryer exhaust and exhaust ducting for dryer. | $3,000 |
| Oct 8, 2025 | Completed final sign-off Jun 2026 | 413 Tehama St | Sh Painting And Construction Inc | 3/f: convert - (e) kitchen to new office, (e) laundry to bath, (e) powder room to laundry room. expand (e) dinning room and combine with new kitchen. expand (e) closet in (e) bedroom #3. expand entrance in (e) bedroom #2. expand (e) bath #2. remove (e) entry, (e) bath #1, (e) wetbar, (e) pantry,Details
3/f: convert - (e) kitchen to new office, (e) laundry to bath, (e) powder room to laundry room. expand (e) dinning room and combine with new kitchen. expand (e) closet in (e) bedroom #3. expand entrance in (e) bedroom #2. expand (e) bath #2. remove (e) entry, (e) bath #1, (e) wetbar, (e) pantry, | $150,000 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 1585 10th Av | Sh Painting And Construction Inc | unit 4: replace bathroom shower pan, wall tiles, fan, like for like repair.Details
unit 4: replace bathroom shower pan, wall tiles, fan, like for like repair. | $9,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 56 Garcia Av | Sh Painting And Construction Inc | renovate lower level of single family home. convert non-habitable storage space to livable space.Details
renovate lower level of single family home. convert non-habitable storage space to livable space. | $15,000 |
| Apr 14, 2025 | Completed final sign-off Apr 2025 | 64 San Benito Wy | Sh Painting And Construction Inc | replace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure.Details
replace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure. | $1,000 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 939 Leavenworth St | Sh Painting And Construction Inc | replace the 6 wooden window trims on the front side of the building at common areaDetails
replace the 6 wooden window trims on the front side of the building at common area | $1,800 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 935 Leavenworth St | Sh Painting And Construction Inc | replace 3 wooden window trims on the front side of the building at common areaDetails
replace 3 wooden window trims on the front side of the building at common area | $900 |
| Sep 3, 2024 | Completed final sign-off Sep 2024 | 937 Leavenworth St | Sh Painting And Construction Inc | replace (6) wooden windows trim on the front side of building at common areaDetails
replace (6) wooden windows trim on the front side of building at common area | $1,800 |
| Jul 17, 2024 | Completed final sign-off Jul 2024 | 516 Ofarrell St | Sh Painting And Construction Inc | 3rd fl unit# 302: replace water damage drywall total 159 sqft. use /8" type xDetails
3rd fl unit# 302: replace water damage drywall total 159 sqft. use /8" type x | $5,000 |
| Jul 17, 2024 | Completed final sign-off Dec 2024 | 380 Eddy St | Sh Painting And Construction Inc | 4th fl: renovation of the existing 4th fl common area bathroom #2, measuring 7x7 adjacent to unit 435. no change to existing area, use, height or structural.Details
4th fl: renovation of the existing 4th fl common area bathroom #2, measuring 7x7 adjacent to unit 435. no change to existing area, use, height or structural. | $11,000 |
| Jun 27, 2024 | Completed final sign-off Jul 2024 | 281 Addison St | Sh Painting And Construction Inc | repair the damage exterior wood flooring at the entrance to the house & wood fascia board at the rear side over the deck. according to nov complaint 202418391.Details
repair the damage exterior wood flooring at the entrance to the house & wood fascia board at the rear side over the deck. according to nov complaint 202418391. | $3,000 |
| Jan 17, 2024 | Completed final sign-off Apr 2025 | 332 Teresita Bl | Sh Painting And Construction Inc | interior renovation to convert unconditioned space at ground floor to become 3 bedrooms & 2 bathrooms. new kitchen, hydronic heat system, interconnecting staircase. new street tree. no change to (e) use, number of dwelling & height.Details
interior renovation to convert unconditioned space at ground floor to become 3 bedrooms & 2 bathrooms. new kitchen, hydronic heat system, interconnecting staircase. new street tree. no change to (e) use, number of dwelling & height. | $317,200 |
| Dec 5, 2023 | In progress issued Mar 2024 | 675 Minna St | Sh Painting And Construction Inc | tenant improvement of existing office at gr fl. total area=750 sf. scope includes reconfiguration of e closed offices,removal of non bearing walls, accessibility upgrade, existing light fixtures to be replaced to high efficacy fixtures per code compliant wattageDetails
tenant improvement of existing office at gr fl. total area=750 sf. scope includes reconfiguration of e closed offices,removal of non bearing walls, accessibility upgrade, existing light fixtures to be replaced to high efficacy fixtures per code compliant wattage | $134,250 |
| Oct 13, 2023 | Completed final sign-off Aug 2026 | 465 Parker Av | Sh Painting And Construction Inc | interior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height.Details
interior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height. | $140,500 |