Jason Phoen
- Listed as
- authorized agent-others, engineer
- Firm
- Jrp Disign
- Based in
- Union City
- On San Francisco permits
- Sep 2006 to Jan 2026
19 permits since 2000 (engineer on 19 permits, authorized agent-others on 1 permit): 11 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2026 | In progress filed Jan 2026, not yet issued | 137 Curtis St | Hungto Co Incorporation | basement addition: 2 bedrooms, 2 bathroos, laundry & utility. 1st floor remodel: 2 bedrooms, 2 bathrooms & 1 bar. 2nd floor remodel: 2 bedrooms, 2 bathrooms, addition living & kitchen.Details
basement addition: 2 bedrooms, 2 bathroos, laundry & utility. 1st floor remodel: 2 bedrooms, 2 bathrooms & 1 bar. 2nd floor remodel: 2 bedrooms, 2 bathrooms, addition living & kitchen. | $250,000 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1563 43rd Av | Kl Construction Group | revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures.Details
revision to permit 202410152946. relocation of refrigerator and oven. closed 2 windows on 2/f bathroom in rear. remove partition wall in laundry room wall. no change in plumbing fixtures. | $1,000 |
| Oct 15, 2024 | Completed final sign-off Oct 2025 | 1563 43rd Av | Kl Construction Group | remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs.Details
remodel kitchen, bathroom. add one bathroom and 1/2 bathroom on 2nd flr. 1st add 2 full bathroom, 2 bedroom, 2 family room. replacing all windows. 2nd flr reconfigure stairs. | $200,000 |
| Aug 25, 2023 | Never finaled filed Aug 2023, never issued | 240 Cotter St | 1st fl: add 1 bedroom, 1 bath, 1 bar & living room. 2nd fl: reconfigure kitchen & bath. add half bath. exterior: replace staircase.Details
1st fl: add 1 bedroom, 1 bath, 1 bar & living room. 2nd fl: reconfigure kitchen & bath. add half bath. exterior: replace staircase. | $50,000 | |
| Jul 14, 2023 | Never finaled issued Jul 2023, no final | 90 Pinehurst Wy | replace water damaged subpanel, cmu slope to drain, footing & sill plate, extend gutter drain to rear, enlarge interior footing. foundation replacement along south exterior wall.Details
replace water damaged subpanel, cmu slope to drain, footing & sill plate, extend gutter drain to rear, enlarge interior footing. foundation replacement along south exterior wall. | $10,000 | |
| Feb 24, 2023 | Expired or cancelled cancelled Jul 2023 | 240 Cotter St | construct interior stairwell, 1-hour firewall & doorDetails
construct interior stairwell, 1-hour firewall & door | $10,000 | |
| Nov 4, 2022 | Never finaled filed Nov 2022, never issued | 1028 Le Conte Av | legailize structure at 2nd fl. add & remove windows & doors. convert a deck to a (n) study and bath @ 2nd fl. add window & wall below deck. construct new staircase in rearDetails
legailize structure at 2nd fl. add & remove windows & doors. convert a deck to a (n) study and bath @ 2nd fl. add window & wall below deck. construct new staircase in rear | $50,000 | |
| Sep 14, 2022 | Completed final sign-off Aug 2023 | 3025 21st Av | Kl Construction Group | revision to 202110221022. add elevator and minor floor plan layout changeDetails
revision to 202110221022. add elevator and minor floor plan layout change | $30,000 |
| Jun 6, 2022 | Completed final sign-off Feb 2023 | 1324 10th Av | 2nd fl. relocation of (e) bath room and (e) laundry & dryer, remodeling kitchen, 1 bedroom, add 1 shower in (e) half bath (total 2 bathrooms). replace flooring and wall furnance, (v.i.f.) smoke detectors amd carbon monoxideDetails
2nd fl. relocation of (e) bath room and (e) laundry & dryer, remodeling kitchen, 1 bedroom, add 1 shower in (e) half bath (total 2 bathrooms). replace flooring and wall furnance, (v.i.f.) smoke detectors amd carbon monoxide | $5,000 | |
| Jan 19, 2022 | Completed final sign-off Jul 2025 | 57 Chattanooga St | Topline Builders Corp | provide shoring drawing related to bpa#201910073669Details
provide shoring drawing related to bpa#201910073669 | $20,000 |
| Oct 22, 2021 | Completed final sign-off Aug 2023 | 3025 21st Av | Kl Construction Group | ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/woodDetails
ground fl - add 1 bedrm, 1 family rm and 1 full bath & wet bar; 2nd fl - relocate kitchen, add 1 half bathrm, 1 laundry; 3rd fl - relocate 2 bathrooms; relocate stairs, replace front windows w/wood | $200,000 |
| Aug 29, 2019 | Completed final sign-off Aug 2020 | 1295 32nd Av | 1st floor: remodeling extg bedroom, bathroom, entrance lobby, add 1 media room, 1 bathroom and 1 bedroom. 2ndfloor:remodeling dining room, kitchen, 2 bedrooms and 2 baths. add 1 den, exterior update 17 windows w/woodclad alumin. facing the street. 3 skylights.Details
1st floor: remodeling extg bedroom, bathroom, entrance lobby, add 1 media room, 1 bathroom and 1 bedroom. 2ndfloor:remodeling dining room, kitchen, 2 bedrooms and 2 baths. add 1 den, exterior update 17 windows w/woodclad alumin. facing the street. 3 skylights. | $100,000 | |
| Feb 13, 2018 | Completed final sign-off Apr 2019 | 3910 Geary Bl | Yu Kwan Construction Co. | comply with 201722084, construct 2 storage rooms at gr fl sprinklers & fire alarm on seperate permit.Details
comply with 201722084, construct 2 storage rooms at gr fl sprinklers & fire alarm on seperate permit. | $5,000 |
| Jun 3, 2016 | Completed final sign-off Nov 2016 | 1219 05th Av | Mutual Seiko Construction | revision pa #201605056601: detail revise (detail #2).Details
revision pa #201605056601: detail revise (detail #2). | |
| Feb 12, 2015 | Never finaled issued Mar 2015, no final | 1246 Bush St | Wen Bin Li Construction Co | relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required.Details
relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required. | $30,000 |
| Apr 24, 2012 | Completed final sign-off Nov 2012 | 260 08th Av | Greatwall Building Construction Inc | remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street.Details
remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street. | $68,000 |
| Jul 20, 2011 | Never finaled issued Aug 2011, no final | 34 Joice St | Greatwall Building Construction Inc | change existing ground floor utility room into garage. no other work. new garage needs to be fully sprinkler in accordance with nfpa 13 under separate application.Details
change existing ground floor utility room into garage. no other work. new garage needs to be fully sprinkler in accordance with nfpa 13 under separate application. | $5,000 |
| Aug 28, 2008 | Completed final sign-off Sep 2008 | 240 06th St | Seanly Construction | replace single lay roofing with base layer, replace main hold, repair roof deck (50 sq ft) with 5/8" thick plywoodDetails
replace single lay roofing with base layer, replace main hold, repair roof deck (50 sq ft) with 5/8" thick plywood | $38,000 |
| Sep 6, 2006 | Never finaled issued Mar 2010, no final | 1325 Portola Dr | A.G. Lim & Sons Construct, M T Langit Const.& Elect. | to erect a new 3 story single family dwelling unit.Details
to erect a new 3 story single family dwelling unit. | $415,000 |