Weishun Liu
- Listed as
- authorized agent-others, contractor
- Firm
- Best Level Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Sep 2026
26 permits since 2000 (contractor on 22 permits, authorized agent-others on 7 permits): 22 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Oct 2026 | 826 38th Av | Best Level Construction Inc | 1st floor: add 1 bedroom , 2 full bath, den and family room. 2nd floor: remodel kitchen and bathroom ad 1.5 bath, infill lightwell, infill at rear, replace all front windows with in-kind vinyl. all electric ab-112 required.Details
1st floor: add 1 bedroom , 2 full bath, den and family room. 2nd floor: remodel kitchen and bathroom ad 1.5 bath, infill lightwell, infill at rear, replace all front windows with in-kind vinyl. all electric ab-112 required. | $180,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 219 Lisbon St | Best Level Construction Inc | remodel master bathroom and closet at 2nd flr per plan.Details
remodel master bathroom and closet at 2nd flr per plan. | $23,600 |
| Aug 15, 2025 | In progress issued Mar 2026 | 827 Goettingen St | Best Level Construction Inc | interior remodel: install smoke detector, reroute electrical conduit in the 1st floor, enlarge corridor in the 1st floor, seal skylight in the roof. comply to complaint # 202421718 and 202421722Details
interior remodel: install smoke detector, reroute electrical conduit in the 1st floor, enlarge corridor in the 1st floor, seal skylight in the roof. comply to complaint # 202421718 and 202421722 | $10,000 |
| Apr 21, 2025 | Completed final sign-off Jul 2025 | 155 Ralston St | Best Level Construction Inc | 2-story stucco relacement in-kind, minor dry rot repair around windows - less than 50%.Details
2-story stucco relacement in-kind, minor dry rot repair around windows - less than 50%. | $10,000 |
| Mar 21, 2025 | Completed final sign-off Jul 2025 | 155 Ralston St | Best Level Construction Inc | replacing hardie plank siding in kind on the back side of the house size 18'h & 25'w not visible from the street. approx. 450 sq ft.Details
replacing hardie plank siding in kind on the back side of the house size 18'h & 25'w not visible from the street. approx. 450 sq ft. | $11,000 |
| Apr 17, 2024 | Completed final sign-off May 2025 | 78 Niagara Av | Best Level Construction Inc | 2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitcheneteDetails
2nd fl: remodel (e) kitchen & bathroom & add (1) new bedroom & bathroom. remove (e) stair to the ground floor. replace (e) street facing windows inkind. ground fl: add (n) family room, one full bath & bedroom. relocate (e) water heater & furnace. add kitchenete | $120,000 |
| Feb 9, 2024 | Completed final sign-off Mar 2024 | 1637 Clay St | Best Level Construction Inc | comply with complaint 202419061 and 202419093. replace water damaged sheetrock in-kind for unit #b, 3, 7 and 11.Details
comply with complaint 202419061 and 202419093. replace water damaged sheetrock in-kind for unit #b, 3, 7 and 11. | $16,500 |
| Feb 23, 2023 | Completed final sign-off Aug 2023 | 1714 Cabrillo St | Best Level Construction Inc | unit #b: remodel kitchen and bathroom in kind. kitchen on ground floor and 2nd floor bathroon on ground floor and 2 bathroom on 2nd floor. no removal of walls.Details
unit #b: remodel kitchen and bathroom in kind. kitchen on ground floor and 2nd floor bathroon on ground floor and 2 bathroom on 2nd floor. no removal of walls. | $65,000 |
| Oct 27, 2022 | Completed final sign-off Feb 2023 | 157 Julian Av | Best Level Construction Inc | unit 157-b: remodel, 3/f, removal of kitchen wall, new laundry at rearDetails
unit 157-b: remodel, 3/f, removal of kitchen wall, new laundry at rear | $33,338 |
| Sep 14, 2022 | Completed final sign-off Feb 2023 | 157 Julian Av | Best Level Construction Inc | unit #157-b: remodel 1 kitchen and 1 bathroom in kind. non structural.Details
unit #157-b: remodel 1 kitchen and 1 bathroom in kind. non structural. | $30,000 |
| Jul 22, 2022 | Completed final sign-off Feb 2023 | 155 Julian Av | Best Level Construction Inc | unit 155b: remodel 3/f, remove kitchen walls, remodel kitchen, new laundry @ rearDetails
unit 155b: remodel 3/f, remove kitchen walls, remodel kitchen, new laundry @ rear | $33,338 |
| Mar 23, 2022 | Completed final sign-off Jun 2022 | 1316 Stockton St | Sincere Construction Company Inc | revision to residential soft story pa 2018-0705-3816 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4Details
revision to residential soft story pa 2018-0705-3816 seismic retrofit to comply with sfebc chapter 4d 2016 cebc appendix a4 | |
| Mar 2, 2022 | Never finaled issued Mar 2022, no final | 132 Clinton Pk | Best Level Construction Inc | unit 3: remodel one kitchen and one existing bathroom. re-paint entire unit. no structural workDetails
unit 3: remodel one kitchen and one existing bathroom. re-paint entire unit. no structural work | $38,000 |
| Nov 12, 2021 | Completed final sign-off Jan 2022 | 690 Hayes St | Best Level Construction Inc | remodel (e) kitchen, in kind.Details
remodel (e) kitchen, in kind. | $20,000 |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 1274 18th Av | Best Level Construction Inc | remodel one existing bathroom in kind. no alteration of wall, window and door.Details
remodel one existing bathroom in kind. no alteration of wall, window and door. | $5,800 |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 1272 18th Av | Best Level Construction Inc | remodel one existing kitchen and one existing bathroom in kind. no alteration of wall, window and door.Details
remodel one existing kitchen and one existing bathroom in kind. no alteration of wall, window and door. | $14,800 |
| Jul 7, 2021 | Completed final sign-off Oct 2021 | 3590 21st St | Best Level Construction Inc | unit 201: remodel (e) kitchen in kind- remodel two (e) bathrooms in kind. re-piant entire unit.Details
unit 201: remodel (e) kitchen in kind- remodel two (e) bathrooms in kind. re-piant entire unit. | $50,000 |
| Apr 8, 2021 | Completed final sign-off Nov 2021 | 712 Thornton Av | Best Level Construction Inc | remodel existing kitchen in-kindDetails
remodel existing kitchen in-kind | $25,000 |
| Sep 23, 2020 | Completed final sign-off Nov 2021 | 653 Arguello Bl | Sincere Construction Company Inc | relocate plywood shear walls & converte footing and replace moment frames with plywood shear walls. revision to pa# 201708144712.Details
relocate plywood shear walls & converte footing and replace moment frames with plywood shear walls. revision to pa# 201708144712. | |
| Feb 1, 2019 | Completed final sign-off Dec 2019 | 153 Julian Av | Best Level Construction Inc | remodel unit # 153 & 159 on second floor. convert living room to bedroom, convert closet to office. remodel kitchen and bathroom.Details
remodel unit # 153 & 159 on second floor. convert living room to bedroom, convert closet to office. remodel kitchen and bathroom. | $25,000 |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 588 28th Av | street spaceDetails
street space | ||
| Dec 6, 2018 | Completed final sign-off May 2019 | 505 26th Av | Best Level Construction Inc | remodel 1 kitchen, 2 bathrooms & 2 bedrooms in-kind. new cabinets, countertops & plumbing as needed. no structural work for unit#1 only. no work in common area, no change in floor plan layout.Details
remodel 1 kitchen, 2 bathrooms & 2 bedrooms in-kind. new cabinets, countertops & plumbing as needed. no structural work for unit#1 only. no work in common area, no change in floor plan layout. | $40,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 226 05th Av | Best Level Construction Inc | dry rot repair on rear staircase, less than 50%.Details
dry rot repair on rear staircase, less than 50%. | $6,800 |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 1806 Noriega St | Best Level Construction Inc | remodel kitchen (new kitchen cabinets, appliances, tile flooring). new paint in living room and bedroomsDetails
remodel kitchen (new kitchen cabinets, appliances, tile flooring). new paint in living room and bedrooms | $38,000 |
| Mar 21, 2017 | Completed final sign-off Apr 2021 | 1300 Masonic Av | Best Level Construction Inc, Wing Chow Construction | addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom.Details
addition of 1 new unit on ground floor per ordinance# 162-16. new unit with 1 living room, 1 bedrooms, 1 office, 1 kitchen, 1 bathroom. | $25,000 |
| Jul 9, 2013 | Completed final sign-off Sep 2013 | 2921 Scott St | Sincere Construction Company Inc | remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toiletDetails
remodel kitchen - replace existing kitchen cabinets with new cabinets, new countertop, new kitchen appliances, upgrade kitchen electrical. replace bathroom sink faucet and kitchen sink. change bathroom toilet | $6,500 |