17 permits since 2000 (engineer on 17 permits): 7 completed, 7 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 12, 2022 | Completed final sign-off Nov 2024 | 132 Cortland Av | Edri Construction Inc *See Notes* | 2 story interior remodel. kitchen and bath remodel (kitchen & 1 bathroom under pa202207188732). relocate (e) 1/f bathroom. add powder room on 1st fl. relocate 1st fl bedroom.add 1 bathroom to 2/f. amend to pa 202207188732Details
2 story interior remodel. kitchen and bath remodel (kitchen & 1 bathroom under pa202207188732). relocate (e) 1/f bathroom. add powder room on 1st fl. relocate 1st fl bedroom.add 1 bathroom to 2/f. amend to pa 202207188732 | $100,000 |
| Feb 28, 2018 | Completed final sign-off Jul 2019 | 1575 Bay Shore Bl | Apex Site Solutions Inc | add remote radio units inside rooftop tower feature. no visible change to exterior total 6 prus. also replace (e) ac compressors w/ 5 ton units. **maher n/a**Details
add remote radio units inside rooftop tower feature. no visible change to exterior total 6 prus. also replace (e) ac compressors w/ 5 ton units. **maher n/a** | $32,300 |
| Jan 17, 2018 | Completed final sign-off Jun 2023 | 2519 Harrison St | Gabriel Mena | replace foundation and install concrete slab on the basement floor.Details
replace foundation and install concrete slab on the basement floor. | $120,000 |
| Sep 14, 2017 | Never finaled filed Sep 2017, never issued | 1180 Jackson St | adu per ordinance# 162-16. excavation of (e) ground floor in order to build 2 new studio apartments. new concrete slab interior walls, plumbing fixtures & electrical. ** maher:Details
adu per ordinance# 162-16. excavation of (e) ground floor in order to build 2 new studio apartments. new concrete slab interior walls, plumbing fixtures & electrical. ** maher: | $135,000 | |
| Sep 14, 2017 | Expired or cancelled withdrawn Aug 2021 | 1180 Jackson St | installation of special moment frame to accomodate seismic retrofit. comply with mandatory requirement according to 2016 cebc appendix a-4. ** maher: n/a **Details
installation of special moment frame to accomodate seismic retrofit. comply with mandatory requirement according to 2016 cebc appendix a-4. ** maher: n/a ** | $35,000 | |
| Jan 5, 2016 | Completed final sign-off May 2016 | 1967 Hayes St | Lindquist Custom Construction Inc | replace existing brick foundation at front corner both sides of walkwayDetails
replace existing brick foundation at front corner both sides of walkway | $25,000 |
| Feb 19, 2015 | Expired or cancelled withdrawn Apr 2015 | 1255 45th Av | to comply with complaint 20142971. add 2 story wood framed deck at rear of existing house.Details
to comply with complaint 20142971. add 2 story wood framed deck at rear of existing house. | $10,000 | |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 1250 Clay St | Sequoia Construction Services Inc | revision to pa #2012.0803.6568 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not requiredDetails
revision to pa #2012.0803.6568 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not required | |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 1230 Clay St | Sequoia Construction Services Inc | revision to pa #2012.0803.6565 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not requiredDetails
revision to pa #2012.0803.6565 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not required | |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 1260 Clay St | Sequoia Construction Services Inc | revision to pa #2012.0803.6565 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not requiredDetails
revision to pa #2012.0803.6565 - ladder was not drawn out correct for build of new fire escape. compliance with ordinance #155-13 not required | |
| May 8, 2013 | Completed final sign-off Aug 2013 | 887 Bush St | M H M Construction | interior remodel in apt#604: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel extg bath. electerical and plumbing work as necessary. replace lighting with high efficacy lighting.Details
interior remodel in apt#604: remove non-load bearing walls to relocate kitchen. provide new bedroom. remodel extg bath. electerical and plumbing work as necessary. replace lighting with high efficacy lighting. | $20,000 |
| Dec 21, 2012 | Completed final sign-off Aug 2014 | 240 Caselli Av | Lindquist Custom Construction Inc | revision to appl ##2012.10.17.2205. - enclose staiwell, add bathroom to lower level.Details
revision to appl ##2012.10.17.2205. - enclose staiwell, add bathroom to lower level. | $15,000 |
| Dec 10, 2009 | Never finaled issued Jul 2022, no final | 2424 Folsom St | Alex R Construction | make/build a garage in (e) building (basement level), legalize (e) & full bathroom and storage sprinklers under seperate permitDetails
make/build a garage in (e) building (basement level), legalize (e) & full bathroom and storage sprinklers under seperate permit | $25,000 |
| Dec 10, 2009 | Completed final sign-off Aug 2010 | 4563 Mission St | replace (e) brick foundation (partial) @ property line length =19'-0"; two - 4'-6" x 4'-6" spread footingDetails
replace (e) brick foundation (partial) @ property line length =19'-0"; two - 4'-6" x 4'-6" spread footing | $10,000 | |
| Feb 20, 2009 | Expired or cancelled expired Aug 2013 | 845 Head St | revision to pa #200801142445, replace window at 2nd fl, change location of door & window at 1st fl, reconfigue wall between garage & exercise rm at 1st fl.Details
revision to pa #200801142445, replace window at 2nd fl, change location of door & window at 1st fl, reconfigue wall between garage & exercise rm at 1st fl. | $1,000 | |
| Jun 29, 2007 | Never finaled issued Jul 2008, no final | 25 Baker St | L Columna General Contractor | renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms.Details
renovation of ground floor and basement floor. floor & partition walls to finishing. convert unoccupied basement to habitable rooms. | $58,000 |
| Jan 24, 2005 | Never finaled issued Jan 2005, no final | 228 Clayton St | Stroud Construction | strengthen (e) roofing members, built as is no change in envelope. some repairs mostly augmentationsDetails
strengthen (e) roofing members, built as is no change in envelope. some repairs mostly augmentations | $5,000 |