James Lemoine
- License
- R2971
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, authorized agent-others
- Firm
- Kohan
- On San Francisco permits
- Feb 2008 to Sep 2017
3 permits since 2000 (architect on 2 permits, authorized agent-others on 1 permit): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Barber Construction, Dooher Construction
- Architects
- Kenneth Woo
- Engineers
- Anil Pandya
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 1, 2017 | Completed final sign-off Nov 2017 | 490 Post St | Dooher Construction | revision to electrical. ref app#201705106153. t-24. n/a for maherDetails
revision to electrical. ref app#201705106153. t-24. n/a for maher | $35,000 |
| Jul 15, 2015 | Completed final sign-off Jun 2017 | 490 Post St | Barber Construction | unit #1135: removing extg non-load bearing walls and ceiling construction and prepairing to recieve new paint and lighting ab-017 n/a for the maher. this scope is for demo onlyDetails
unit #1135: removing extg non-load bearing walls and ceiling construction and prepairing to recieve new paint and lighting ab-017 n/a for the maher. this scope is for demo only | $11,000 |
| Feb 27, 2008 | Expired or cancelled expired Aug 2009 | 359 Fillmore St | improve laundry & storage area, add private storage bins. remove (e) restroom with (n) wall @ garages #9 & 10 including (n) storage #1 & 2. retain min. of 18'6" clear in garages 9 & 10. 2 hr. seperation required for s-1 storage or 1 hr. plus automatic sprinklers.Details
improve laundry & storage area, add private storage bins. remove (e) restroom with (n) wall @ garages #9 & 10 including (n) storage #1 & 2. retain min. of 18'6" clear in garages 9 & 10. 2 hr. seperation required for s-1 storage or 1 hr. plus automatic sprinklers. | $8,000 |