James Dunn
- License
- 5704
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- authorized agent-others, engineer
- Firm
- Pes Environmental, Inc.
- On San Francisco permits
- Sep 2009 to Feb 2016
2 permits since 2000 (authorized agent-others on 1 permit, engineer on 1 permit): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Balfour Beatty Construction Llc, Herrero Builders Incorporated
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2016 | Completed final sign-off Dec 2020 | 500 Folsom St | Balfour Beatty Construction Llc | soil removal for new construction (site migitation plan). ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph **Details
soil removal for new construction (site migitation plan). ref pa# 2015/03/11/0506-s. ** maher: exempted; see attached approval letter from dph ** | $1,000 |
| Sep 22, 2009 | Completed final sign-off Jul 2011 | 2901 California St | Herrero Builders Incorporated | cantilever soldier beam & wood lagging for temporary support of excavation as required by construction authorized under bpn#2009/0702/1862-s.Details
cantilever soldier beam & wood lagging for temporary support of excavation as required by construction authorized under bpn#2009/0702/1862-s. | $110,000 |