Jaimi Baer
- License
- C25731
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C25731 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Nov 2004 to Dec 2021
4 permits since 2000 (architect on 3 permits, engineer on 1 permit): 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mascheroni Construction (2), Mai Construction Inc.
- Architects
- Martin Gicklhorn
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2021 | Completed final sign-off Jun 2022 | 455 Mission Bay Blvd South | Mai Construction Inc. | ti of (e) labs on 4th floor including demo and installation of walls and doors, ceilings, lab furniture and equipment to build new tc labs. includes mep modifications. fire alarm/sprinkler deferred.Details
ti of (e) labs on 4th floor including demo and installation of walls and doors, ceilings, lab furniture and equipment to build new tc labs. includes mep modifications. fire alarm/sprinkler deferred. | $1,022,340 |
| Feb 8, 2016 | Completed final sign-off Jan 2017 | 1259 Stanyan St | Mascheroni Construction | renovate (e) kitchen at 2/f master bath at 3rd level & dining rm wall repair water damage @ wall & roofDetails
renovate (e) kitchen at 2/f master bath at 3rd level & dining rm wall repair water damage @ wall & roof | $80,000 |
| Oct 20, 2014 | Completed final sign-off Mar 2015 | 1255 Stanyan St | Mascheroni Construction | remodel bathroom, replace fixtures in kind, new electrical led fixtures in living room & dining roomDetails
remodel bathroom, replace fixtures in kind, new electrical led fixtures in living room & dining room | $25,000 |
| Nov 19, 2004 | Expired or cancelled expired Jan 2007 | 2002 Baker St | add closet. relocate walls. new plumbing fixtures @ 2nd floor of unit # 2002.Details
add closet. relocate walls. new plumbing fixtures @ 2nd floor of unit # 2002. | $20,000 |