Huberty Tang
- Listed as
- contractor, designer
- Firm
- Plus One Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Feb 2022 to Aug 2026
15 permits since 2000 (contractor on 15 permits, designer on 2 permits): 8 completed, 5 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Aug 2026 | 1380 Greenwich St | Plus One Construction Inc | unit #205: demo existing toilet; bathtub: tiles; vanity; install new toilet and vanity; build new shower with glass door; full bathroom repaint, replace exhaust fan. (all in 2nd floor) (40sf)Details
unit #205: demo existing toilet; bathtub: tiles; vanity; install new toilet and vanity; build new shower with glass door; full bathroom repaint, replace exhaust fan. (all in 2nd floor) (40sf) | $20,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 715 Ulloa St | Plus One Construction Inc | construct new bathroom, remodel (e) bathroom at 3/f. remodel (e) kitchen, (e) bathroom at 2/f. remove walls between kitchen, nook, & bedroom closet @ 2/f. replace (e) window at nook due to dryrot at 2/f. install (n) heat pump furnace. install (n) tankless gas water heater.Details
construct new bathroom, remodel (e) bathroom at 3/f. remodel (e) kitchen, (e) bathroom at 2/f. remove walls between kitchen, nook, & bedroom closet @ 2/f. replace (e) window at nook due to dryrot at 2/f. install (n) heat pump furnace. install (n) tankless gas water heater. | $120,000 |
| Mar 30, 2026 | Completed final sign-off Aug 2026 | 304 Walnut St | Plus One Construction Inc | unit 2: replace recess electric wall heater and remove old baseboard heater. repair drywall (approx 10 sq ft). repair baseboards and floor. paint wall and baseboards. all work is in kind. use 5/8" type x sheet rock.Details
unit 2: replace recess electric wall heater and remove old baseboard heater. repair drywall (approx 10 sq ft). repair baseboards and floor. paint wall and baseboards. all work is in kind. use 5/8" type x sheet rock. | $1,200 |
| Feb 10, 2026 | Completed final sign-off Apr 2026 | 1309 09th Av | Plus One Construction Inc | repaint dining area wall and ceiling. replace dining floor tiles. (no plumbing and electrical).Details
repaint dining area wall and ceiling. replace dining floor tiles. (no plumbing and electrical). | $20,000 |
| Jan 30, 2026 | In progress filed Jan 2026, not yet issued | 1309 09th Av | Plus One Construction Inc | restaurant dining area wall & ceiling repaint, replace dining floor tiles, install wall panels in dining, 3 ft - 4 ft formica laminated, (no plumbing & electrical)Details
restaurant dining area wall & ceiling repaint, replace dining floor tiles, install wall panels in dining, 3 ft - 4 ft formica laminated, (no plumbing & electrical) | $20,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 1622 30th Av | Plus One Construction Inc | gut out full bath. relocate sink location, new plumbing fixture (showers, drain, vanity, replace exhaust fan & new light, provide gfci per code, no remove wall, new tiles & shower pan.Details
gut out full bath. relocate sink location, new plumbing fixture (showers, drain, vanity, replace exhaust fan & new light, provide gfci per code, no remove wall, new tiles & shower pan. | $20,000 |
| Jul 15, 2025 | Completed final sign-off Sep 2025 | 2634 39th Av | Plus One Construction Inc | convert e) shower into closet, replace shower fixture, drain, shower pan (new) toilet, new tiles, replace recess lights & fan at upper levelDetails
convert e) shower into closet, replace shower fixture, drain, shower pan (new) toilet, new tiles, replace recess lights & fan at upper level | $18,000 |
| Apr 10, 2025 | Completed final sign-off Aug 2026 | 175 Rey St | Plus One Construction Inc | remodel of kitchen and bathroom. addition of one bathroom. upgrade of all electrical wires at second floor.Details
remodel of kitchen and bathroom. addition of one bathroom. upgrade of all electrical wires at second floor. | $50,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 2038 Powell St | Plus One Construction Inc, Bingo Builders | renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathroomsDetails
renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathrooms | $100,000 |
| Oct 30, 2023 | Completed final sign-off Jan 2024 | 757 Panorama Dr | Plus One Construction Inc | remove non-structural wall between kitchen and dining, replace rear yard window in-kind, demo kitchen & install new cabinets and wall covers, install new light in kitchen and bedroom 1 & 2 (top flr), replace tub to shower.Details
remove non-structural wall between kitchen and dining, replace rear yard window in-kind, demo kitchen & install new cabinets and wall covers, install new light in kitchen and bedroom 1 & 2 (top flr), replace tub to shower. | $45,000 |
| Oct 11, 2023 | In progress filed Oct 2023, not yet issued | 200 Brannan St | Plus One Construction Inc | unit #107: bathroom remodel - convert tub into shower, install new fixtures. no location change. install new tiles and paint. kitchen remodel - install new kitchen cabinet with same layout. install new plumbing fixtures and upgrade countertop. electrical by code.Details
unit #107: bathroom remodel - convert tub into shower, install new fixtures. no location change. install new tiles and paint. kitchen remodel - install new kitchen cabinet with same layout. install new plumbing fixtures and upgrade countertop. electrical by code. | $25,000 |
| Oct 12, 2022 | Never finaled issued Apr 2023, no final | 2823 Laguna St | Plus One Construction Inc, Gil Construction & Assoc Inc. | 3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf.Details
3rd fl: convert (e) living room and (e) bathroom to (n) primary bedroom and bathroom. remove (e) bedroom for (n) office 52 sf. | $15,000 |
| Jun 15, 2022 | Completed final sign-off Aug 2022 | 44 Lagunitas Dr | Plus One Construction Inc | renovation of 2/f bathroom and closet. addition of new bathroom, sinks and toilet, new closets in primary bedroom. (n) window at second bathroom, reduce window size in primary bathroom. windows not visible from street.Details
renovation of 2/f bathroom and closet. addition of new bathroom, sinks and toilet, new closets in primary bedroom. (n) window at second bathroom, reduce window size in primary bathroom. windows not visible from street. | $80,000 |
| Apr 15, 2022 | Never finaled issued Aug 2022, no final | 1650 Noriega St | Plus One Construction Inc | remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only.Details
remodel extg dental office, no change of use, no fixture count change. relocate ada bathroom per plan, repair dryrot less than 50% work only to be performed on dental office only. | $50,000 |
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 751 38th Av | Plus One Construction Inc, Z M General Contractor Inc | 1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood).Details
1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood). | $70,000 |