Howard Backen
- License
- C4978
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Backen Gillam Arch.
- Based in
- Sausalito
- On San Francisco permits
- Apr 2008 to Dec 2020
4 permits since 2000 (architect on 4 permits): 2 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Fisher Development Inc (2), O'neill Construction Inc, Robison Nieri White Construction
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 21, 2020 | Expired or cancelled cancelled Jul 2024 | 468 Jackson St | Fisher Development Inc | non-structural demo at interior of building for future t.i. ref pa# 202009154239.Details
non-structural demo at interior of building for future t.i. ref pa# 202009154239. | $50,000 |
| Sep 15, 2020 | Expired or cancelled withdrawn Aug 2024 | 468 Jackson St | Fisher Development Inc | tenant improvements at all floors to provide showroom, offices & staff amenities. upgrade ada bathrooms. replace stair to basement at #470 and one column at #472. seismic upgrade performed under separate permit. mep deferred.Details
tenant improvements at all floors to provide showroom, offices & staff amenities. upgrade ada bathrooms. replace stair to basement at #470 and one column at #472. seismic upgrade performed under separate permit. mep deferred. | $700,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 1090 Chestnut St | Robison Nieri White Construction | complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not reqDetails
complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not req | $100,000 |
| Apr 9, 2008 | Completed final sign-off Mar 2009 | 632 El Camino Del Mar | O'neill Construction Inc | enclosed courtyard and add glass atrum at (e) walled courtyard space that is located in the middle half of the (e) residenceDetails
enclosed courtyard and add glass atrum at (e) walled courtyard space that is located in the middle half of the (e) residence | $75,000 |