Harrison French Iii
- License
- C25001
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hfa Arch Engineers Int.
- On San Francisco permits
- Mar 2011 to Jul 2019
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gar-Cal Corporation, M P S, Smith Development & Construction Comp
- Engineers
- Robert Hatch
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2019 | Completed final sign-off Feb 2020 | 362 Kearny St | Gar-Cal Corporation | tenant improvement of existing retail space to limited restaurant space(insomnia cookies) w/associated mechanical, electrical and plumbing. no exterior workDetails
tenant improvement of existing retail space to limited restaurant space(insomnia cookies) w/associated mechanical, electrical and plumbing. no exterior work | $62,000 |
| Feb 10, 2014 | Completed final sign-off Jul 2014 | 195 Pine St | Smith Development & Construction Comp | revision to appl #2013.05.07.6313: revised floor plan for value engineering, reduce scope of work -electrical fixtures, equipment & plumbing. compliance with ordinance 155-13 not required. structural supports for two ahu, 1 cu, and 1 ef.Details
revision to appl #2013.05.07.6313: revised floor plan for value engineering, reduce scope of work -electrical fixtures, equipment & plumbing. compliance with ordinance 155-13 not required. structural supports for two ahu, 1 cu, and 1 ef. | |
| Mar 3, 2011 | Completed final sign-off Dec 2011 | 531 Sutter St | M P S | tenant improvement to existing retail space for 7-11 convenience store. hfa, new mech, elec, plumbing. new storefront, remove demising wall, new restrooms, sinks, counters, storage, officeDetails
tenant improvement to existing retail space for 7-11 convenience store. hfa, new mech, elec, plumbing. new storefront, remove demising wall, new restrooms, sinks, counters, storage, office | $205,000 |