Gregorio S. Roja
- License
- C11476
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Greg Roja + Assoc.Inc
- Based in
- Tiburon
- On San Francisco permits
- Jun 2004 to Sep 2010
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bel Builders Inc
- Engineers
- John Yadegarb Assoc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2010 | Completed final sign-off Oct 2016 | 447 Sutter St | Bel Builders Inc | change in occupancy use of portions of (e) ground fl from group b to a-2 assembly use. change requires (n) 2nd exit at rear of space. work also includes improvement of rear exiting of stairs from 2nd fl by extending stair to join (n) exit. (n) exit is routed to the basement with 1 hr rated corridor.Details
change in occupancy use of portions of (e) ground fl from group b to a-2 assembly use. change requires (n) 2nd exit at rear of space. work also includes improvement of rear exiting of stairs from 2nd fl by extending stair to join (n) exit. (n) exit is routed to the basement with 1 hr rated corridor. | $200,000 |
| Jun 2, 2004 | Completed final sign-off Jan 2005 | 2325 03rd St | on 4th floor install batteries for radio equpment-related to pa 200308051302Details
on 4th floor install batteries for radio equpment-related to pa 200308051302 | $5,000 |