Gregg Grubin
- License
- S4312
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S4312 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Csw/Stuber Stroett
- Based in
- Novato
- On San Francisco permits
- Oct 2004 to Aug 2006
3 permits since 2000 (architect on 2 permits, engineer on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Mayta & Jensen, Pablo Collazo General Con, Robison Nieri White Construction
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2006 | Completed final sign-off Oct 2006 | 125 Montalvo Av | Robison Nieri White Construction | remove and replace approx 131 ft of wood decayed fencing. max. height including 2' open trellis, not to exceed 9'6".Details
remove and replace approx 131 ft of wood decayed fencing. max. height including 2' open trellis, not to exceed 9'6". | $7,000 |
| Feb 3, 2005 | Completed final sign-off Jul 2005 | 438 Steiner St | Pablo Collazo General Con | replacement of (e) deck and egress stairs.Details
replacement of (e) deck and egress stairs. | $15,000 |
| Oct 28, 2004 | Completed final sign-off Mar 2005 | 2961 Vallejo St | Mayta & Jensen | enlarge opening in (e) wall plus removal of non bearing partition wall at 1st floor.Details
enlarge opening in (e) wall plus removal of non bearing partition wall at 1st floor. | $6,000 |