Permit GraphShortlistSan Francisco building permits since 2000

Maria Serova

License
1054696
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
Mars Construction
Based in
Walnut Creek
On San Francisco permits
Jun 2022 to Sep 2023

13 permits since 2000 (contractor on 12 permits, authorized agent-others on 2 permits): 9 completed, 2 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Pristine Construction, Stanley's Construction

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 27, 2023Completed
final sign-off Dec 2023
1001 Pine StMars Constructionunit 202: bathroom renovation in kind, bathtub into shower.
Details
Permit
202309277529
Permit issued
Sep 27, 2023
Final sign-off
Dec 12, 2023

unit 202: bathroom renovation in kind, bathtub into shower.

Open the permit page

$12,000
May 1, 2023Expired or cancelled
withdrawn Dec 2023
1717 Alabama StMars Construction(1) 21 sq ft powder room remodel on 1st floor in kind no structural no changes to walls or openings. all (n) fixtures and finishes. (n) toilet and vanity.
Details
Permit
202305016771

(1) 21 sq ft powder room remodel on 1st floor in kind no structural no changes to walls or openings. all (n) fixtures and finishes. (n) toilet and vanity.

Open the permit page

$29,000
Apr 24, 2023Expired or cancelled
withdrawn Dec 2023
1717 Alabama StMars Construction2 bathroom remodel bath (a) 46 sq ft primary 3/4 bath on 2nd ; (n) curbed shower toilet & vanity; bath (b) 62 sq ft full guest bath on 2nd fl; remove non-bearing wall separting toilet & shower; relocate door. (n) tub/shower, toilet & vanity
Details
Permit
202304246355

2 bathroom remodel bath (a) 46 sq ft primary 3/4 bath on 2nd ; (n) curbed shower toilet & vanity; bath (b) 62 sq ft full guest bath on 2nd fl; remove non-bearing wall separting toilet & shower; relocate door. (n) tub/shower, toilet & vanity

Open the permit page

$50,000
Mar 2, 2023Completed
final sign-off Aug 2023
1045 York StMars Constructionone 47 sq ft 3/4 bathroom remodel on 2nd floor in kind. no structural. no changes to walls or openings. replace extg with new curbed shower toilet and vanity. all new fixtures and finishes.
Details
Permit
202303022937
Permit issued
Mar 2, 2023
Final sign-off
Aug 24, 2023

one 47 sq ft 3/4 bathroom remodel on 2nd floor in kind. no structural. no changes to walls or openings. replace extg with new curbed shower toilet and vanity. all new fixtures and finishes.

Open the permit page

$29,000
Feb 14, 2023Completed
final sign-off Oct 2023
2369 Union StMars Construction#2: one 38 sq ft bathroom remodel on 2nd floor inkind. no structural. no changes to walls or openings. replace extg with new tub/shower, toilet, and vanity. all new fixtures and finishes.
Details
Permit
202302141992
Permit issued
Feb 21, 2023
Final sign-off
Oct 19, 2023

#2: one 38 sq ft bathroom remodel on 2nd floor inkind. no structural. no changes to walls or openings. replace extg with new tub/shower, toilet, and vanity. all new fixtures and finishes.

Open the permit page

$29,000
Feb 7, 2023Completed
final sign-off Aug 2023
378 29th AvMars Construction3/f: (1) full bathroom remodel (38 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & vanity, all new fixtures/finishes
Details
Permit
202302071537
Permit issued
Feb 7, 2023
Final sign-off
Aug 31, 2023

3/f: (1) full bathroom remodel (38 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & vanity, all new fixtures/finishes

Open the permit page

$29,000
Feb 7, 2023Completed
final sign-off Sep 2024
51 Prospect AvStanley's Construction2/f: (1) full bathroom remodel (60 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & double vanity, all new fixtures/finishes
Details
Permit
202302071538
Permit issued
Feb 7, 2023
Final sign-off
Sep 10, 2024

2/f: (1) full bathroom remodel (60 sq. ft.) in-kind. no structural/wall changes/openings. replace (e) w/new tub/shower, toilet & double vanity, all new fixtures/finishes

Open the permit page

$29,000
Jan 24, 2023Completed
final sign-off Apr 2023
123 Corwin StMars Constructionone 47 sq bath remodel on 2nd fl in kind. no structural no changes to walls or openings. replace e with n tub shower, toilet, and vanity. all new fixtures and finishes
Details
Permit
202301240612
Permit issued
Jan 24, 2023
Final sign-off
Apr 12, 2023

one 47 sq bath remodel on 2nd fl in kind. no structural no changes to walls or openings. replace e with n tub shower, toilet, and vanity. all new fixtures and finishes

Open the permit page

$14,500
Jan 19, 2023Never finaled
issued Jan 2023, no final
2360 Union StMars Constructionunit #6: one 38 sq ft 3/4 bathroom remodel on 4th floor. no structural. no changes to walls or openings. in kind replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.
Details
Permit
202301190360
Permit issued
Jan 19, 2023

unit #6: one 38 sq ft 3/4 bathroom remodel on 4th floor. no structural. no changes to walls or openings. in kind replace existing with (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.

Open the permit page

$12,000
Dec 19, 2022Completed
final sign-off Nov 2023
20 Josiah AvMars Construction(1) 42 sq ft bathroom remodel on 3rd floor in kind. no structural, no changes to walls or openings. replace existing with (n) curbed shower, toilet bidet, and vanity. all (n) fixtures and finishes.
Details
Permit
202212198597
Permit issued
Jan 19, 2023
Final sign-off
Nov 6, 2023

(1) 42 sq ft bathroom remodel on 3rd floor in kind. no structural, no changes to walls or openings. replace existing with (n) curbed shower, toilet bidet, and vanity. all (n) fixtures and finishes.

Open the permit page

$14,500
Dec 1, 2022Completed
final sign-off May 2023
5 Carpenter CtMars Construction2/f: (1) 58 sq. ft. primary bath remodel, no structural, no changes to walls or openings, replace (e) w/new curbed shower, toilet bidet, & double vanity. all new fixtures/finishes
Details
Permit
202212017444
Permit issued
Dec 1, 2022
Final sign-off
May 26, 2023

2/f: (1) 58 sq. ft. primary bath remodel, no structural, no changes to walls or openings, replace (e) w/new curbed shower, toilet bidet, & double vanity. all new fixtures/finishes

Open the permit page

$14,500
Oct 17, 2022Completed
final sign-off Jun 2023
6324 California StMars Construction, Pristine Construction2 bathroom remodels in kind. no structural/no change to walls or openings. bath a: 67 sq f master bath on 3rd floor. replace extg with new soaking tub curbed shower, toilet vanity. bath b: 43 sq ft guest bath on 3rd floor. replace extg with new curbed shower, vanity and toilet. all nw fixtures fnsh
Details
Permit
202210174489
Permit issued
Nov 7, 2022
Final sign-off
Jun 28, 2023

2 bathroom remodels in kind. no structural/no change to walls or openings. bath a: 67 sq f master bath on 3rd floor. replace extg with new soaking tub curbed shower, toilet vanity. bath b: 43 sq ft guest bath on 3rd floor. replace extg with new curbed shower, vanity and toilet. all nw fixtures fnsh

Open the permit page

$14,500
Jun 1, 2022Never finaled
issued Jun 2022, no final
50 Rockwood CtMars Constructionadding small window to the side of the house, 31.75in x 15.75. at the lowest level at the right side of the building. u-factor 0.3 maximum.
Details
Permit
202206015384
Permit issued
Jun 6, 2022

adding small window to the side of the house, 31.75in x 15.75. at the lowest level at the right side of the building. u-factor 0.3 maximum.

Open the permit page

$800