Gary M. Jereczek
- Listed as
- architect
- Firm
- Ratcliff Architects
- Based in
- Emeryville
- On San Francisco permits
- Jul 2018 to Mar 2025
6 permits since 2000 (architect on 6 permits): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | Completed final sign-off Aug 2025 | 601 Van Ness Av | Kaiser Foundation Health Plan Inc | 2/fl-suite 2002-remove the (e)ductwork will be leased separtely. a (n)air intake and exterior louver will be installed in teh area of an (e)window. this scope will be accomodated in an expanded mech room. the project will also be adding a closet in the unoccupied space. fsd's not to be touched.Details
2/fl-suite 2002-remove the (e)ductwork will be leased separtely. a (n)air intake and exterior louver will be installed in teh area of an (e)window. this scope will be accomodated in an expanded mech room. the project will also be adding a closet in the unoccupied space. fsd's not to be touched. | $180,000 |
| Dec 4, 2023 | Completed final sign-off Jul 2024 | 2645 Ocean Av | Rudolph And Sletten Inc | 3/f: commercial interior tenant improvement to convert 2 exam rooms into 1 ultrasound room with 1 probe processing room.Details
3/f: commercial interior tenant improvement to convert 2 exam rooms into 1 ultrasound room with 1 probe processing room. | $115,209 |
| Aug 19, 2019 | Completed final sign-off Dec 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | interior remodel of the 3rd flr accessibility upgrades to the stairwell, handrail, lighting & exit signage and updating a curb ramp at (e) rear exit door. mep/fire/life safety under permitDetails
interior remodel of the 3rd flr accessibility upgrades to the stairwell, handrail, lighting & exit signage and updating a curb ramp at (e) rear exit door. mep/fire/life safety under permit | $165,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 2645 Ocean Av | Jva Management Corp | commercial ti (interior only) on 2nd fl suite 202 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred.Details
commercial ti (interior only) on 2nd fl suite 202 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred. | $300,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 2645 Ocean Av | Jva Management Corp | ste 205-commercial ti (interior only) on 2nd fl suite 205 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred.Details
ste 205-commercial ti (interior only) on 2nd fl suite 205 - new medical clinic in existing medical office building. business use/low-rise. no change of use. no change to occupant load. no new fire/smoke dampers. work in b occupancy area only. no work in m & s-2 areas. sprinkler/fire alarm deferred. | $250,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2019 | 595 Buckingham Wy | Jva Management Corp | ste 538-540 commercial ti (interior onl) to 5th fl for dental suite including demo of interior walls, construction fo new walls, finishes, sinks, mechanica hvac systemDetails
ste 538-540 commercial ti (interior onl) to 5th fl for dental suite including demo of interior walls, construction fo new walls, finishes, sinks, mechanica hvac system | $450,000 |