Firas Jandali
- Listed as
- engineer, pmt consultant/expediter
- Firm
- Jedco Consulting Engineer
- Based in
- Berkeley
- On San Francisco permits
- Jun 2005 to Oct 2022
6 permits since 2000 (engineer on 5 permits, pmt consultant/expediter on 1 permit): 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 26, 2022 | Completed final sign-off May 2023 | 226 Monterey Bl | Proficient Termite And Construction Co | voluntary foundation strengthening to perimeter footing at rear portion of structure. underpining approx 18 foot of footing (not on property line)Details
voluntary foundation strengthening to perimeter footing at rear portion of structure. underpining approx 18 foot of footing (not on property line) | |
| Aug 11, 2022 | Completed final sign-off Oct 2023 | 2409 29th Av | Nazir Hijaz A & Ning To Growstar | revision to pa# 202202188348. new second floor 6' opening. add drawing and calculation as per inspector request.Details
revision to pa# 202202188348. new second floor 6' opening. add drawing and calculation as per inspector request. | |
| Jun 8, 2022 | Never finaled issued Jun 2022, no final | 1901 Franklin St | Northgate Development | rebuilding porch floor. porch is inclused removing the non-bearing wall to original. install guardrail. removing and installing 2 patio doors.Details
rebuilding porch floor. porch is inclused removing the non-bearing wall to original. install guardrail. removing and installing 2 patio doors. | $20,000 |
| Mar 29, 2022 | In progress issued Nov 2024 | 2119 29th Av | Nazir Hijaz A & Ning To Growstar | 1- remodeling the existing dwelling and addition of 428 sq ft floor area as a new m. bedroom & m. bathroom at the garage level. 2- adding new junior adu (493 sq ft) to basement level (1 bedroom, 1 bathroom, living area, laundry and kitchen.Details
1- remodeling the existing dwelling and addition of 428 sq ft floor area as a new m. bedroom & m. bathroom at the garage level. 2- adding new junior adu (493 sq ft) to basement level (1 bedroom, 1 bathroom, living area, laundry and kitchen. | $180,000 |
| Mar 22, 2022 | Completed final sign-off Jul 2023 | 740 Grand View Av | Partners Construction Inc | guardrail replaceDetails
guardrail replace | $8,800 |
| Jun 21, 2005 | Expired or cancelled expired Feb 2007 | 1303 Polk St | building working and a storage area.serving counter,building a hood system.Details
building working and a storage area.serving counter,building a hood system. | $30,000 |