Fei Yang He
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Alex He General Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2017 to Sep 2026
37 permits since 2000 (contractor on 36 permits, designer on 2 permits, authorized agent-others on 1 permit): 33 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 1634 Oakdale Av | Alex He General Construction | compliance to complaint# 202286629. comply to all works with nov# 202185665. 2nd floor: remove illegal unit c (removing doorway) to remerge unit (2022-002593cua).Details
compliance to complaint# 202286629. comply to all works with nov# 202185665. 2nd floor: remove illegal unit c (removing doorway) to remerge unit (2022-002593cua). | $1,000 |
| Aug 4, 2025 | Completed final sign-off Jan 2026 | 720 26th Av | Alex He General Construction | remove and reinstall all drywalls and update electrical wiring for 2nd floor (approx 1000sf). r15 for exterior wall and r30 for attic. replace 8 vinyl windows not street facing. bathroom remodel, no layout changes. concrete shower pan.Details
remove and reinstall all drywalls and update electrical wiring for 2nd floor (approx 1000sf). r15 for exterior wall and r30 for attic. replace 8 vinyl windows not street facing. bathroom remodel, no layout changes. concrete shower pan. | $40,000 |
| Jul 8, 2025 | Completed final sign-off Sep 2025 | 720 26th Av | Alex He General Construction | replace 4 facade 2nd floor windows. fiberglass single hung, same size, same location. u=0.3Details
replace 4 facade 2nd floor windows. fiberglass single hung, same size, same location. u=0.3 | $8,000 |
| Jul 8, 2025 | Completed final sign-off Sep 2025 | 1863 42nd Av | Alex He General Construction | replace 2 facade 2nd floor windows. fiberglass sliding, same size, same location. u=0.3Details
replace 2 facade 2nd floor windows. fiberglass sliding, same size, same location. u=0.3 | $5,000 |
| Jun 17, 2025 | Completed final sign-off Jan 2026 | 720 26th Av | Alex He General Construction | remodel 2nd fl kitchen and enclose 2nd fl living room. remove and replace (1) kitchen window (non-street facing), like for like.Details
remodel 2nd fl kitchen and enclose 2nd fl living room. remove and replace (1) kitchen window (non-street facing), like for like. | $15,000 |
| Apr 24, 2025 | Completed final sign-off Nov 2025 | 1634 Oakdale Av | Alex He General Construction | revision to pa 2022-0719-8815 to maintain r-3 occupancy per ab 005, 2 unit plus (1) adu to remove fire sprinkler & fire alarm requirement per crc r313.2 exception 1; install (n) heat pump for adu; replace sliding door instead of windows @ rear bedroom; remove wall between garage & hallwayDetails
revision to pa 2022-0719-8815 to maintain r-3 occupancy per ab 005, 2 unit plus (1) adu to remove fire sprinkler & fire alarm requirement per crc r313.2 exception 1; install (n) heat pump for adu; replace sliding door instead of windows @ rear bedroom; remove wall between garage & hallway | |
| Mar 11, 2025 | Completed final sign-off Jun 2025 | 1212 24th Av | Alex He General Construction | remodel & enlarge 2nd fl bathroom, add insulation on exterior wall on 2nd fl bedroom adjacent to bathroom. concrete slab shower pan. readjust height on e) windowDetails
remodel & enlarge 2nd fl bathroom, add insulation on exterior wall on 2nd fl bedroom adjacent to bathroom. concrete slab shower pan. readjust height on e) window | $12,000 |
| Jun 11, 2024 | Completed final sign-off Nov 2024 | 517 Paris St | Alex He General Construction | convert storage into habitable space on ground floor to include 1 bedroom, 1 office, and 1 bath.Details
convert storage into habitable space on ground floor to include 1 bedroom, 1 office, and 1 bath. | $40,000 |
| Jan 11, 2024 | Completed final sign-off Apr 2024 | 2379 27th Av | Alex He General Construction | unit 1: bathroom remodel- no layout changes, cosmetic upgrade.Details
unit 1: bathroom remodel- no layout changes, cosmetic upgrade. | $12,000 |
| Sep 27, 2023 | Completed final sign-off Feb 2024 | 1300 Sacramento St | Alex He General Construction | unit# 106; kitchen and bathroom remodel in kind. no layout changes, cosmetic upgrades only. no structural work. no floor layout changes. no wall layout changes.Details
unit# 106; kitchen and bathroom remodel in kind. no layout changes, cosmetic upgrades only. no structural work. no floor layout changes. no wall layout changes. | $15,000 |
| Apr 27, 2023 | Completed final sign-off Jul 2023 | 618 Spruce St | Alex He General Construction | unit 2: kitchen remodel: no layouy changes, cosmetic upgrades onlyDetails
unit 2: kitchen remodel: no layouy changes, cosmetic upgrades only | $6,000 |
| Apr 18, 2023 | Completed final sign-off Sep 2023 | 618 Spruce St | Alex He General Construction | replace (12) front facing windows. all new windows will be fiberglass and .30 u factorDetails
replace (12) front facing windows. all new windows will be fiberglass and .30 u factor | $12,000 |
| Oct 20, 2022 | Expired or cancelled cancelled Jan 2026 | 218 Amber Dr | Alex He General Construction | reduction of scope of work 2 stories side additon (1) story additon with roof deckDetails
reduction of scope of work 2 stories side additon (1) story additon with roof deck | |
| Oct 20, 2022 | Completed final sign-off Dec 2022 | 218 Amber Dr | Alex He General Construction | replace siding on front fence and on utility closet and garage with new wood siding to match width of existing siding. replace garage door with new wood garage door with same size and location.Details
replace siding on front fence and on utility closet and garage with new wood siding to match width of existing siding. replace garage door with new wood garage door with same size and location. | $12,000 |
| Jul 19, 2022 | Completed final sign-off Nov 2025 | 1634 Oakdale Av | Alex He General Construction | convert (e) 1fl storage to adu.comply with nov 202185655.Details
convert (e) 1fl storage to adu.comply with nov 202185655. | $20,000 |
| May 11, 2022 | Completed final sign-off Jul 2022 | 1422 Powell St | Alex He General Construction | unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall.Details
unit 3: one partial bathroom remodel: new prefabricated shower pan and shower door. new stone in shower enclosure. replace old dry rotted wood studs on on sidee of a wall. | $6,000 |
| May 11, 2022 | Completed final sign-off Oct 2022 | 2379 27th Av | Alex He General Construction | unit 6: one kitchen and one bathroom remodel, no layout changes, cosmetic upgrade only. prefabricated shower panDetails
unit 6: one kitchen and one bathroom remodel, no layout changes, cosmetic upgrade only. prefabricated shower pan | $20,000 |
| Apr 14, 2022 | Completed final sign-off Oct 2022 | 2379 27th Av | Alex He General Construction | unit #3: kitchen (100 sf) and bathroom (40 sf) remodel: no layout changes, cosmetic upgrade only. replace (9) rear windows (vinyl) same size, non street facing.Details
unit #3: kitchen (100 sf) and bathroom (40 sf) remodel: no layout changes, cosmetic upgrade only. replace (9) rear windows (vinyl) same size, non street facing. | $20,000 |
| Jan 28, 2022 | Completed final sign-off Dec 2022 | 1634 Oakdale Av | Alex He General Construction | partially comply with nov 202185665. 3/f: kitchen & bath remodel. windows replace in kind @ 3rd fl. onlyDetails
partially comply with nov 202185665. 3/f: kitchen & bath remodel. windows replace in kind @ 3rd fl. only | $35,000 |
| Jan 18, 2022 | Completed final sign-off May 2022 | 1300 Sacramento St | Alex He General Construction | apartment #204 studio remodel: kitchen and bathroom remodel. no layout changes. no structural.Details
apartment #204 studio remodel: kitchen and bathroom remodel. no layout changes. no structural. | $15,000 |
| Nov 19, 2021 | Completed final sign-off Jun 2022 | 39 Chicago Wy | Alex He General Construction | 1/f: remodel, reduce extg garage area to provide new office and bath.Details
1/f: remodel, reduce extg garage area to provide new office and bath. | $60,000 |
| Nov 12, 2021 | Completed final sign-off Jun 2022 | 690 Panorama Dr | Alex He General Construction | replace (wood clad like for like window) 2 windows. replace red wood siding exterior siding (only damaged ones)u<0.30Details
replace (wood clad like for like window) 2 windows. replace red wood siding exterior siding (only damaged ones)u<0.30 | $8,000 |
| Apr 19, 2021 | Completed final sign-off May 2021 | 1300 Sacramento St | Alex He General Construction | apartment unit 101 remodel kitchen and bathroom remodel. no layout changes or removal of walls. change light fixtures, outlet and covers, faucets. cosmetic upgrades, paintingDetails
apartment unit 101 remodel kitchen and bathroom remodel. no layout changes or removal of walls. change light fixtures, outlet and covers, faucets. cosmetic upgrades, painting | $10,000 |
| Apr 19, 2021 | Completed final sign-off Dec 2021 | 530 36th Av | Alex He General Construction | bathroom remodel. no layout changes or removal of walls. change light fixtures,outlet and covers. facucets, painting cosmetic upgradesDetails
bathroom remodel. no layout changes or removal of walls. change light fixtures,outlet and covers. facucets, painting cosmetic upgrades | $5,000 |
| Jan 19, 2021 | Completed final sign-off Oct 2021 | 2108 Sutter St | Alex He General Construction | interior base bldg/shell improvement of (e) vacant ground fl tenant space. ada improvements including (n) interior level landing at (e) entry. (n) ada unisex restroom.Details
interior base bldg/shell improvement of (e) vacant ground fl tenant space. ada improvements including (n) interior level landing at (e) entry. (n) ada unisex restroom. | $36,000 |
| Jan 19, 2021 | Completed final sign-off Feb 2021 | 1322 20th Av | Alex He General Construction | remodel bathroom - new tiles/ floors, new shower door & new prefabricated shower panDetails
remodel bathroom - new tiles/ floors, new shower door & new prefabricated shower pan | $3,000 |
| Dec 4, 2020 | Completed final sign-off Feb 2021 | 1300 Sacramento St | Alex He General Construction | unit#201: apartment unit 201 remodel: kitchen and bathroom remodel. no fixture or strctural changes. all remodel work in-kind. no removal of walls.Details
unit#201: apartment unit 201 remodel: kitchen and bathroom remodel. no fixture or strctural changes. all remodel work in-kind. no removal of walls. | $10,000 |
| Aug 31, 2020 | Completed final sign-off Jan 2022 | 2559 26th Av | Alex He General Construction | add 1 bedroom, 1 playroom and full bath & laundry, storage area at the (e) ground floor.Details
add 1 bedroom, 1 playroom and full bath & laundry, storage area at the (e) ground floor. | $50,000 |
| Jun 4, 2020 | Completed final sign-off Jul 2020 | 1300 Sacramento St | Alex He General Construction | unit#305: apartment remodel, kitchen and bathroom remodel. no fixture or structural changes. all remodel work in-kind.Details
unit#305: apartment remodel, kitchen and bathroom remodel. no fixture or structural changes. all remodel work in-kind. | $10,000 |
| Jan 10, 2020 | Completed final sign-off Mar 2020 | 1300 Sacramento St | Alex He General Construction | unit # 306: apartment studio remodel: kitchen and bathroom remodel. no fixture change. no structural work under this permit.Details
unit # 306: apartment studio remodel: kitchen and bathroom remodel. no fixture change. no structural work under this permit. | $4,000 |
| Dec 20, 2019 | Never finaled issued Dec 2019, no final | 1425 Clay St | street spaceDetails
street space | ||
| Dec 20, 2019 | Completed final sign-off Jun 2020 | 1425 Clay St | Alex He General Construction | unit #a: whole apartment remodeling. kitchen and bathroom remodel. new dry wall and insulation. change outlets. new heating system. no layout changes.Details
unit #a: whole apartment remodeling. kitchen and bathroom remodel. new dry wall and insulation. change outlets. new heating system. no layout changes. | $30,000 |
| Jul 22, 2019 | Completed final sign-off Nov 2019 | 441 Green St | Alex He General Construction | rebuild rear yard stairsDetails
rebuild rear yard stairs | $4,000 |
| Sep 11, 2018 | Expired or cancelled cancelled Mar 2025 | 218 Amber Dr | Alex He General Construction | (2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair.Details
(2) stories side addition, (1) story rear addition w/ roof deck. replace vertical wood siding on front fence to match existing. less than 50% repair. | $300,000 |
| Dec 5, 2017 | Completed final sign-off Feb 2020 | 2589 San Bruno Av | Alex He General Construction | legalize unit on ground floor of property w/ (4) bedrooms, kitchen, living room & (3) full bathroom per plan ord #43-14Details
legalize unit on ground floor of property w/ (4) bedrooms, kitchen, living room & (3) full bathroom per plan ord #43-14 | $18,000 |
| Dec 1, 2017 | Completed final sign-off Apr 2018 | 2593 San Bruno Av | Alex He General Construction | revision to 201709289831 work at rear unit- relocate kitchen location per plan & turn kitchen area into bedroom per plan. maher naDetails
revision to 201709289831 work at rear unit- relocate kitchen location per plan & turn kitchen area into bedroom per plan. maher na | |
| Sep 28, 2017 | Completed final sign-off Apr 2018 | 2593 San Bruno Av | Alex He General Construction | reconfigure interior layout on 2/f per plans. maher n/aDetails
reconfigure interior layout on 2/f per plans. maher n/a | $30,000 |