Farheen Sultana
- Listed as
- authorized agent-others, engineer
- Firm
- Unitech Engineering Services
- Based in
- Fremont
- On San Francisco permits
- Jun 2011 to Feb 2026
7 permits since 2000 (engineer on 6 permits, authorized agent-others on 1 permit): 5 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2026 | Completed final sign-off Jun 2026 | 739 De Haro St | Homecrafts Builders | revision to pa #2025-0314-2280: elimate proposed new columns in highlighted areas, eliminate proposed sink at kitchen island, eliminate proposed built in cabinets near stairs, eliminate 1 proposed skylight in master bath.Details
revision to pa #2025-0314-2280: elimate proposed new columns in highlighted areas, eliminate proposed sink at kitchen island, eliminate proposed built in cabinets near stairs, eliminate 1 proposed skylight in master bath. | |
| Mar 14, 2025 | Completed final sign-off Aug 2026 | 739 De Haro St | Homecrafts Builders | demo of (e) plumbing fixtures, stairs, few windows, portion of walls, lighting, finishes and misc items. construction of (n) 2nd bathroom on level 1. new interior stairs that leads to lower level. new windows, new interior finishes & kitchen cabinets. repair ceiling. new plumbing & light fixturesDetails
demo of (e) plumbing fixtures, stairs, few windows, portion of walls, lighting, finishes and misc items. construction of (n) 2nd bathroom on level 1. new interior stairs that leads to lower level. new windows, new interior finishes & kitchen cabinets. repair ceiling. new plumbing & light fixtures | $150,000 |
| Aug 22, 2014 | Expired or cancelled cancelled Mar 2020 | 376 San Carlos St | Superior Structures | revision to appl #2014.0429.4422 - framing plan only, frame according to structural drawing. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to appl #2014.0429.4422 - framing plan only, frame according to structural drawing. ** maher: compliance with ordinance no# 155-13 not required ** | |
| Jul 30, 2014 | Completed final sign-off Oct 2015 | 2331 Bryant St | Envisage Construction | structural footings, foundations, concrete works voluntary structural work per plan.Details
structural footings, foundations, concrete works voluntary structural work per plan. | $70,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2015 | 2331 Bryant St | Envisage Construction | convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permitDetails
convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permit | $300,000 |
| Jun 24, 2014 | Expired or cancelled cancelled Sep 2016 | 621 Alvarado St | Superior Structures, D Squared Construction | add exterior staircase.Details
add exterior staircase. | $3,000 |
| Jun 15, 2011 | Completed final sign-off Sep 2011 | 425 02nd St | Clear Channel Outdoor | obtain a building permit for sign located at 425 2nd st. clear channel outdoor inc. will legalize this sign as a 14' x 48' wall sign voluntarily in order to comply with n.o.v dated may 17,2011 and n.o.v case number :11266.Details
obtain a building permit for sign located at 425 2nd st. clear channel outdoor inc. will legalize this sign as a 14' x 48' wall sign voluntarily in order to comply with n.o.v dated may 17,2011 and n.o.v case number :11266. | $500 |