Homecrafts Builders
- Based in
- Fremont
- On San Francisco permits
- Mar 2025 to Mar 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | Completed final sign-off Aug 2026 | 739 De Haro St | revision to pa 202503142280 to demolish existing illegally built bathroom & propose new powder roomDetails
revision to pa 202503142280 to demolish existing illegally built bathroom & propose new powder room | $10,000 |
| Feb 2, 2026 | Completed final sign-off Jun 2026 | 739 De Haro St | revision to pa #2025-0314-2280: elimate proposed new columns in highlighted areas, eliminate proposed sink at kitchen island, eliminate proposed built in cabinets near stairs, eliminate 1 proposed skylight in master bath.Details
revision to pa #2025-0314-2280: elimate proposed new columns in highlighted areas, eliminate proposed sink at kitchen island, eliminate proposed built in cabinets near stairs, eliminate 1 proposed skylight in master bath. | |
| Nov 25, 2025 | Completed final sign-off Aug 2026 | 739 De Haro St | expand the scope of work for pa#2025-0314-2280 to include the replacement of the existing, exterior cedar siding at the entire front and rear facades, and replacement of the existing gas furnace with a new gas furnace.Details
expand the scope of work for pa#2025-0314-2280 to include the replacement of the existing, exterior cedar siding at the entire front and rear facades, and replacement of the existing gas furnace with a new gas furnace. | $5,000 |
| Mar 14, 2025 | Completed final sign-off Aug 2026 | 739 De Haro St | demo of (e) plumbing fixtures, stairs, few windows, portion of walls, lighting, finishes and misc items. construction of (n) 2nd bathroom on level 1. new interior stairs that leads to lower level. new windows, new interior finishes & kitchen cabinets. repair ceiling. new plumbing & light fixturesDetails
demo of (e) plumbing fixtures, stairs, few windows, portion of walls, lighting, finishes and misc items. construction of (n) 2nd bathroom on level 1. new interior stairs that leads to lower level. new windows, new interior finishes & kitchen cabinets. repair ceiling. new plumbing & light fixtures | $150,000 |