James R. Rowland
- Listed as
- engineer
- Firm
- Critical Engineering
- Based in
- Lafayette
- On San Francisco permits
- Jun 2009 to Feb 2019
2 permits since 2000 (engineer on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2019 | Completed final sign-off Oct 2021 | 20 Heron St | Tot'l Environm'l /Pwer Sym Inc Dba:Teps | verizon modification: install 2 (n) equipment room partitions; remove 1 (e) partition; extend 1 (e) equipment room ceiling; install 2 (n) battery racks; 3 (n) air cooling units; 1 (n) power dist. panel; 9 (n) rrus; other small equip; remove all unused equip.Details
verizon modification: install 2 (n) equipment room partitions; remove 1 (e) partition; extend 1 (e) equipment room ceiling; install 2 (n) battery racks; 3 (n) air cooling units; 1 (n) power dist. panel; 9 (n) rrus; other small equip; remove all unused equip. | $60,000 |
| Jun 3, 2009 | Completed final sign-off May 2010 | 951 Howard St | Roebbelen Contracting Inc | replace with identical units hvac rtu for telecommunications equipment processes. remove ceiling in power room & leave open.Details
replace with identical units hvac rtu for telecommunications equipment processes. remove ceiling in power room & leave open. | $600,000 |