Eduardo Gonzalez
- Listed as
- authorized agent-others, contractor
- Firm
- Fortitude Construction Inc.
- Based in
- Campbell
- On San Francisco permits
- Feb 2014 to Dec 2018
23 permits since 2000 (contractor on 22 permits, authorized agent-others on 1 permit): 16 completed, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 6, 2018 | Completed final sign-off Feb 2021 | 510 Orizaba Av | Fortitude Construction Inc. | renewal of permit 201602129548Details
renewal of permit 201602129548 | |
| Mar 13, 2018 | Completed final sign-off May 2022 | 1033 Sanchez St | Z Construction Company Inc, Fortitude Construction Inc. | remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces.Details
remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces. | $35,000 |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 1033 Sanchez St | Fortitude Construction Inc. | revision to app#201707252937 for removal of 2 columns at bottom level and providing a new support beam for soft story retrofit. voluntary work not reimbursed by rent.Details
revision to app#201707252937 for removal of 2 columns at bottom level and providing a new support beam for soft story retrofit. voluntary work not reimbursed by rent. | $5,000 |
| Jul 25, 2017 | Completed final sign-off May 2022 | 1033 Sanchez St | Fortitude Construction Inc. | voluntary soft story seismic upgrade & lowering basement by 2'-6"Details
voluntary soft story seismic upgrade & lowering basement by 2'-6" | $70,000 |
| May 5, 2017 | Completed final sign-off Aug 2018 | 615 Broadway | Fortitude Construction Inc. | replace 14 windows and repair leak-dryrot in lightwell. windows located in lighwellDetails
replace 14 windows and repair leak-dryrot in lightwell. windows located in lighwell | $15,000 |
| May 5, 2017 | Completed final sign-off Nov 2017 | 1540 Hyde St | Fortitude Construction Inc. | perform siding & mold repairs. siding repair and to comply with complaint #201770451.Details
perform siding & mold repairs. siding repair and to comply with complaint #201770451. | $3,000 |
| Apr 17, 2017 | Completed final sign-off Feb 2018 | 3714 23rd St | Fortitude Construction Inc. | revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit.Details
revision to pa#201701268008, remodel 4 bathrooms, 1 kitchen on upper unit. | $20,000 |
| Feb 27, 2017 | Completed final sign-off Jul 2017 | 442 Vallejo St | Fortitude Construction Inc. | bathroom remodel replace in kind only, new tub, fixture and faucets, new tile floor, wall, replace existing water heater with new (tankless), gas direct vent, high efficiency. all lighting high efficacy, (n) exhaust fan connect to (e) exhaust duct.Details
bathroom remodel replace in kind only, new tub, fixture and faucets, new tile floor, wall, replace existing water heater with new (tankless), gas direct vent, high efficiency. all lighting high efficacy, (n) exhaust fan connect to (e) exhaust duct. | $5,000 |
| Jan 30, 2017 | Never finaled issued Jan 2017, no final | 1035 Sanchez St | street spaceDetails
street space | ||
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 3714 23rd St | Fortitude Construction Inc. | remove and replace dry rotted wood framing inkind as needed at 1st and 2nd floor. remove and relocate closet wall (partition walls). remove and replace old plmg lines as needed.Details
remove and replace dry rotted wood framing inkind as needed at 1st and 2nd floor. remove and relocate closet wall (partition walls). remove and replace old plmg lines as needed. | $8,000 |
| Oct 31, 2016 | Completed final sign-off Feb 2018 | 3714 23rd St | Fortitude Construction Inc. | to comply with complaint # 201633621, remove drywall plaster and walls, install new 5/8 drywall at walls & ceilings this owrk to be done at 2nd floor unitDetails
to comply with complaint # 201633621, remove drywall plaster and walls, install new 5/8 drywall at walls & ceilings this owrk to be done at 2nd floor unit | $18,000 |
| Apr 21, 2016 | Completed final sign-off May 2017 | 865 Portola Dr | Fortitude Construction Inc. | remove & replace all structural elements that are rotted at the front stiar and landing. rebuild the stairs in kindDetails
remove & replace all structural elements that are rotted at the front stiar and landing. rebuild the stairs in kind | $12,000 |
| Feb 17, 2016 | Expired or cancelled expired Dec 2023 | 2083 San Jose Av | Fortitude Construction Inc. | to comply with nov#201491816: fire damage repair. replace exterior siding affected. window on 2/f not street facing, 2/f kitchen; and master bedroom flooring.Details
to comply with nov#201491816: fire damage repair. replace exterior siding affected. window on 2/f not street facing, 2/f kitchen; and master bedroom flooring. | $35,000 |
| Feb 12, 2016 | Expired or cancelled expired Apr 2018 | 510 Orizaba Av | Fortitude Construction Inc. | replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry.Details
replace kitchen cabinet, drywall, counter tops. remodel master bathroom-replace tub tile flooring and install electrical heating floor system. 2nd floor bathroom remodel; replace new tile, drywall, shower pan and heated floor system. install recessed lighing at living room, family room and entry. | $15,000 |
| Dec 21, 2015 | Completed final sign-off Mar 2019 | 358 Ocean Av | Fortitude Construction Inc. | verification of occupant load. this permit to remove violation 201491812, 201491813, 201576631Details
verification of occupant load. this permit to remove violation 201491812, 201491813, 201576631 | |
| Dec 3, 2015 | Completed final sign-off Mar 2019 | 358 Ocean Av | Fortitude Construction Inc. | ti for 1st fl nightclub. upgrade bar, restrooms, path of travel, entry and egress. no exterior workDetails
ti for 1st fl nightclub. upgrade bar, restrooms, path of travel, entry and egress. no exterior work | $40,000 |
| Jun 30, 2015 | Expired or cancelled expired Dec 2023 | 2083 San Jose Av | Fortitude Construction Inc. | conduct all work for nov# 200881053 & bldg fire notice 201491816 8/26/14. work incl new exit stairs at rear yard &repair of all fire damage. work incl new construction at 2nd & 3rd fls to legalize horizontal addition. addition & demo work done w/o permit. front window replacement.Details
conduct all work for nov# 200881053 & bldg fire notice 201491816 8/26/14. work incl new exit stairs at rear yard &repair of all fire damage. work incl new construction at 2nd & 3rd fls to legalize horizontal addition. addition & demo work done w/o permit. front window replacement. | $105,000 |
| Feb 12, 2015 | Completed final sign-off Mar 2016 | 358 Ocean Av | Fortitude Construction Inc. | remove & replace (e) unsafe dry-rotted beams & columns in kind.Details
remove & replace (e) unsafe dry-rotted beams & columns in kind. | $15,000 |
| Dec 22, 2014 | Completed final sign-off Apr 2015 | 7 Cyrus Pl | Fortitude Construction Inc. | replace 2 windows at the front of the building. new windows to be aluminum. u-factor 0.32 or better.Details
replace 2 windows at the front of the building. new windows to be aluminum. u-factor 0.32 or better. | $1,000 |
| Oct 29, 2014 | Completed final sign-off Jan 2015 | 7 Cyrus Pl | Fortitude Construction Inc. | remove and replace dry rotted framing members in kind at the rear of bldg. revision appl. #2014.0829.5021. replace in kind.Details
remove and replace dry rotted framing members in kind at the rear of bldg. revision appl. #2014.0829.5021. replace in kind. | $8,000 |
| Oct 3, 2014 | Completed final sign-off Mar 2016 | 358 Ocean Av | Fortitude Construction Inc. | comply with 201491812. scope is limited to the in kind replacement of limited area of fire damaged exterior and interior walls and doors. work includes replacement in kind of toilet fixtures, kitchen fixutres, appliances. includes plumbing and elecDetails
comply with 201491812. scope is limited to the in kind replacement of limited area of fire damaged exterior and interior walls and doors. work includes replacement in kind of toilet fixtures, kitchen fixutres, appliances. includes plumbing and elec | $25,000 |
| Feb 27, 2014 | Never finaled issued Feb 2014, no final | 4048 22nd St | Fortitude Construction Inc. | relocating the waher & dryer from the hallway to the utility room on the 1st flr, & installing a laundry sink,vabity sink , paint and change floor from carpet to vynil.dryer comply iwth cmc 504.3Details
relocating the waher & dryer from the hallway to the utility room on the 1st flr, & installing a laundry sink,vabity sink , paint and change floor from carpet to vynil.dryer comply iwth cmc 504.3 | $4,500 |
| Feb 3, 2014 | Completed final sign-off Apr 2014 | 2510 39th Av | Fortitude Construction Inc. | main bathroom remodel, electrical and plumbing fixtures upgrade, new tile installation, sun touch heater flooring installation.Details
main bathroom remodel, electrical and plumbing fixtures upgrade, new tile installation, sun touch heater flooring installation. | $11,000 |