Edward Wright
- Listed as
- architect
- Firm
- Ed Wright Architects
- Based in
- Albany
- On San Francisco permits
- Jun 2007 to Aug 2009
2 permits since 2000 (architect on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2009 | Completed final sign-off Nov 2009 | 34 Valletta Ct | Hammerhouse Construction | demolish existing 3 level deck, install new concrete footings, build all 3 level deck on new concrete footings, install deck boards, railing to new deck, in-kind replacement, same location, same height, same size.Details
demolish existing 3 level deck, install new concrete footings, build all 3 level deck on new concrete footings, install deck boards, railing to new deck, in-kind replacement, same location, same height, same size. | $38,000 |
| Jun 15, 2007 | Completed final sign-off May 2009 | 14 Valencia St | E.J. Builders | establish mcd & comply w/ada, security requirement, and legalize (e) layout. new structural upgrades to entrance included new lighting, new entry door hardware, security gate, additional security cameras. new wall& hardware @ ada bathroom, new accessible bar, non-slip floor and interior signage.Details
establish mcd & comply w/ada, security requirement, and legalize (e) layout. new structural upgrades to entrance included new lighting, new entry door hardware, security gate, additional security cameras. new wall& hardware @ ada bathroom, new accessible bar, non-slip floor and interior signage. | $2,500 |