Easton C. Mcallister
- Listed as
- architect, engineer
- Firm
- Bkf Engineers / Planners
- Based in
- Redwood City
- On San Francisco permits
- Sep 2005 to Jun 2014
6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 27, 2014 | Completed final sign-off Mar 2018 | 2051 03rd St | James E Roberts-Obayashi Corporation, Errc Systems Inc (Former Dishnet Direct), H C I Systems Inc | to erect 6 stories, 1 basement, 93 residential units, (r-2,b,s-2)commercial, mixed use building. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
to erect 6 stories, 1 basement, 93 residential units, (r-2,b,s-2)commercial, mixed use building. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $21,500,000 |
| Feb 25, 2014 | Completed final sign-off Nov 2015 | 540 Leavenworth St | Midstate Construction Corporation | remove interior non-structural wall. additon of new non-structural walls & ceiling. new kitchens & bathrooms in all units. new laundry machines in 10 units. infill 5 (e) vent shafts with new floor framing. mep on separate permit, no exterior work. compliance with ordinance #155-13 not requird.Details
remove interior non-structural wall. additon of new non-structural walls & ceiling. new kitchens & bathrooms in all units. new laundry machines in 10 units. infill 5 (e) vent shafts with new floor framing. mep on separate permit, no exterior work. compliance with ordinance #155-13 not requird. | $1,800,000 |
| Jun 15, 2012 | Completed final sign-off Jun 2013 | 48 Linda St | K. Brunner & Associates | ground floor interior remodel, new full bath, relocation of laundry room.Details
ground floor interior remodel, new full bath, relocation of laundry room. | $25,000 |
| Apr 18, 2011 | Completed final sign-off Jun 2011 | 16 Jessie St | Palisade Builders Inc | install a poured in place topping slab within a tenant improvement.Details
install a poured in place topping slab within a tenant improvement. | $7,000 |
| Jul 21, 2010 | Expired or cancelled expired Nov 2013 | 16 Jessie St | Palisade Builders Inc | temporary sales office of existing vacant space and use of 4th floor. pa# 2006.08.31.1168 s, s1, s2, s3 and s4 for reference. work to include interior remodelling ramp, doors, restroom. no changes to existing struc, walls, no changes to exterior envelope.Details
temporary sales office of existing vacant space and use of 4th floor. pa# 2006.08.31.1168 s, s1, s2, s3 and s4 for reference. work to include interior remodelling ramp, doors, restroom. no changes to existing struc, walls, no changes to exterior envelope. | $7,000 |
| Sep 6, 2005 | Completed final sign-off Jul 2008 | 2509 Filbert St | elevator addition,foundation upgarde,bathroom remodelingDetails
elevator addition,foundation upgarde,bathroom remodeling | $50,000 |