Douglas Dahlin
- License
- C8788
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jan 2017 to Feb 2018
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Narrowback Construction Co. (3)
- Engineers
- Meng Hsiu Chen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 101 Townsend St | Narrowback Construction Co. | create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsendDetails
create (3) communicating opening on a shared wall between 101 & 111 townsend st at 1st, 2nd & 3rd foors. add 1 gender neutral bathroom @ 101 townsend | $60,000 |
| Feb 9, 2018 | Completed final sign-off Nov 2018 | 111 Townsend St | Narrowback Construction Co. | create 3 communicating opening on a shared wall between 101 & 111 at 1st, 2nd and 3rd floors. townsend. add 1 new ramp @ 111 townsendDetails
create 3 communicating opening on a shared wall between 101 & 111 at 1st, 2nd and 3rd floors. townsend. add 1 new ramp @ 111 townsend | $30,000 |
| Jan 13, 2017 | Completed final sign-off Jan 2018 | 101 Townsend St | Narrowback Construction Co. | t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a **Details
t.i for change to cafe use. hvac works inclued tied into (e) building system. new commercial cafe t.i. to include new air handler, new restroom, electrical & plumbing. cabinets & kitchen equipment. ** maher: n/a ** | $175,000 |