Double D
- License
- 6900
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Jun 2016 to Mar 2023
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C L O Construction, Kilrea Construction Inc.
- Architects
- Brooks Mcdonald (2), Barbara Shands
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 30, 2023 | Completed final sign-off Aug 2025 | 210 11th Av | Kilrea Construction Inc. | horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10"Details
horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10" | $184,567 |
| Dec 5, 2022 | Never finaled filed Dec 2022, never issued | 2358 North Point St | remodel at all floors, 4th floor vertival addition over 3-story 3-unit building, horizontal addition to rear, and new roof decks.Details
remodel at all floors, 4th floor vertival addition over 3-story 3-unit building, horizontal addition to rear, and new roof decks. | $776,110 | |
| Jun 28, 2016 | Completed final sign-off Nov 2019 | 1675 33rd Av | C L O Construction | horizontal addition of sunroom with deck above @ rear of home.Details
horizontal addition of sunroom with deck above @ rear of home. | $100,000 |