8 permits since 2000 (architect on 8 permits): 4 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 1499 Webster St | 2/f t.i of existing outpatient licensed dialysis clinic facility includes new partitions, ceilingsm floors. applicable mechanical and electric (2) dialysis stations being removed. mep included.Details
2/f t.i of existing outpatient licensed dialysis clinic facility includes new partitions, ceilingsm floors. applicable mechanical and electric (2) dialysis stations being removed. mep included. | $420,500 | |
| Mar 23, 2023 | Expired or cancelled withdrawn Apr 2023 | 2765 16th St | demo work only to includeremoval of non-structural concrete slab for future plumvbing. t.i.i under pa 202109289367. no exteior work or structurual work to be provided.Details
demo work only to includeremoval of non-structural concrete slab for future plumvbing. t.i.i under pa 202109289367. no exteior work or structurual work to be provided. | $10,000 | |
| Sep 28, 2021 | Completed final sign-off Aug 2024 | 2765 16th St | Tri-Quest Builders & Developers Inc | g/f change of occupancy -ti for outpatient licensed dialysis clinic facilityin compliance w/ ca bldg code as amended by state office health &planning.work includes new walls, ceiling, flooring, any applicable mechnal and electrical components. total of 24 dialysis stationsDetails
g/f change of occupancy -ti for outpatient licensed dialysis clinic facilityin compliance w/ ca bldg code as amended by state office health &planning.work includes new walls, ceiling, flooring, any applicable mechnal and electrical components. total of 24 dialysis stations | $170,000 |
| Dec 6, 2018 | Never finaled issued Oct 2022, no final | 2700 Geary Bl | On Top Construction, Inc. | new security gate at main entry.Details
new security gate at main entry. | $5,000 |
| Oct 23, 2015 | Never finaled issued Nov 2015, no final | 2333 Buchanan St | Jury Construction Co Inc | upgrade door hardware at treatment floor entry doors.Details
upgrade door hardware at treatment floor entry doors. | $10,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2015 | 2700 Geary Bl | Gotham Bay Construction | change of use from senior daycare to dialysis clinic (f-3 to i-2.1). ti for outpatient licensed dialysis clinic on gr fl. work includes (n) walls, ceiling, flooring, mep ac units, exhaust fans on roof, 24 dialysis stations. no visible exterior work. fire protection under separate permitDetails
change of use from senior daycare to dialysis clinic (f-3 to i-2.1). ti for outpatient licensed dialysis clinic on gr fl. work includes (n) walls, ceiling, flooring, mep ac units, exhaust fans on roof, 24 dialysis stations. no visible exterior work. fire protection under separate permit | $750,000 |
| Apr 19, 2012 | Completed final sign-off Sep 2012 | 1493 Webster St | Gotham Bay Construction | ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind.Details
ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind. | $500,000 |
| Jul 3, 2007 | Completed final sign-off Sep 2007 | 1499 Webster St | Envision Construction & Design | 2nd floor-upgarde existing exam room. remove non-bearing partitions, cabinetry,doors. install new cabinetry, flooring, plumbing fixtures, and relocate mechanical.Details
2nd floor-upgarde existing exam room. remove non-bearing partitions, cabinetry,doors. install new cabinetry, flooring, plumbing fixtures, and relocate mechanical. | $40,000 |