Dominic Chu
- Listed as
- architect, engineer
- Firm
- Dominic Chu, Consulting Se
- Based in
- San Mateo
- On San Francisco permits
- Apr 2007 to Dec 2025
15 permits since 2000 (engineer on 13 permits, architect on 2 permits): 7 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | Completed final sign-off Jun 2026 | 571 Monterey Bl | Peace Of Mind Structural Inc | voluntary improvment per engineer plans. revision due to changes onsite new footing required. revision to bpa#: 202511109263Details
voluntary improvment per engineer plans. revision due to changes onsite new footing required. revision to bpa#: 202511109263 | $500 |
| Nov 10, 2025 | Completed final sign-off Jun 2026 | 571 Monterey Bl | Peace Of Mind Structural Inc | voluntary improvement per engineer plansDetails
voluntary improvement per engineer plans | $15,275 |
| Oct 10, 2025 | Completed final sign-off Mar 2026 | 11 Imperial Al | Altamira Construction Co | engineered voluntary structural strengthening and partial foundation replacementDetails
engineered voluntary structural strengthening and partial foundation replacement | $59,270 |
| Jan 30, 2025 | In progress issued Jan 2025 | 643 Spruce St | Huey Const Mngmt Co Inc - Dba M H Const. | repair (e) foundation wall & shear wall & footingDetails
repair (e) foundation wall & shear wall & footing | $30,000 |
| Jan 30, 2025 | In progress issued Jun 2025 | 643 Spruce St | Huey Const Mngmt Co Inc - Dba M H Const. | replacement of (e) rear yard stairs (exposed)Details
replacement of (e) rear yard stairs (exposed) | $45,000 |
| Aug 7, 2024 | Completed final sign-off Dec 2024 | 160 Saint Germain Av | Warner Custom Homes Inc. | voluntary structural strengthening per engineer plans.Details
voluntary structural strengthening per engineer plans. | $7,000 |
| Jun 28, 2024 | Completed final sign-off Oct 2024 | 1419 20th St | Peace Of Mind Structural Inc | voluntary seismic upgrade per engineered plans in accordance to ca chapter a3. add plywood, clips, bolts & sill plate connector to cripple studs of crawlspace.Details
voluntary seismic upgrade per engineered plans in accordance to ca chapter a3. add plywood, clips, bolts & sill plate connector to cripple studs of crawlspace. | $11,950 |
| Apr 3, 2024 | In progress issued Apr 2024 | 179 Brompton Av | Peace Of Mind Structural Inc | voluntary seismic retrofitDetails
voluntary seismic retrofit | $10,450 |
| Feb 21, 2024 | In progress issued Feb 2024 | 316 Moraga St | K O D Construction | voluntary lateral strenghening. calculations not submitted and not reviewed. this permit application does not qualify for a seismic retrofit.Details
voluntary lateral strenghening. calculations not submitted and not reviewed. this permit application does not qualify for a seismic retrofit. | $35,000 |
| Dec 13, 2023 | Expired or cancelled withdrawn Feb 2024 | 57 Gladys St | Monroy Construction | remodel of (e) kitchen, (e) bathroom, and (e) powder room. addition of 68 sf for (n) office and (n) hallwayDetails
remodel of (e) kitchen, (e) bathroom, and (e) powder room. addition of 68 sf for (n) office and (n) hallway | $80,000 |
| Dec 30, 2022 | Never finaled filed Dec 2022, never issued | 1128 Lake St | redevelopment of 2-unit r3 building into 3-unit r2 building (add accessory dwelling unit). horizontal and vertical additions. relocate front facade towards street. install fire sprinklers. ref. planning file 2019-006995prj.Details
redevelopment of 2-unit r3 building into 3-unit r2 building (add accessory dwelling unit). horizontal and vertical additions. relocate front facade towards street. install fire sprinklers. ref. planning file 2019-006995prj. | $1,700,000 | |
| Jan 14, 2021 | Never finaled issued Apr 2022, no final | 437 Gold Mine Dr | Skyland Construction Inc. | remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind.Details
remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind. | $115,000 |
| Jul 10, 2008 | Completed final sign-off Jul 2008 | 124 Downey St | H M W Development Inc | rear window moved approx. 3' from south edge of wall to north side of wall. single swinging door at rear of building changed to double french doors, previous pa# 200712271393.Details
rear window moved approx. 3' from south edge of wall to north side of wall. single swinging door at rear of building changed to double french doors, previous pa# 200712271393. | $150 |
| May 27, 2008 | Expired or cancelled expired Dec 2008 | 318 Avila St | revision to 200708301360s: revise foundation detail, change to floor framing at bay, elimination of e projecting bay, replace with new windowDetails
revision to 200708301360s: revise foundation detail, change to floor framing at bay, elimination of e projecting bay, replace with new window | ||
| Apr 23, 2007 | Completed final sign-off Aug 2007 | 412 Pacheco St | Essex General Contractors Inc | add steel channel to header beam, remove shower stall wall per domini chu, structural engineer. re-locate door to bathroom, revision to pa 200703287489.Details
add steel channel to header beam, remove shower stall wall per domini chu, structural engineer. re-locate door to bathroom, revision to pa 200703287489. | $5,000 |