Dmitriy Lashkevich
- Listed as
- engineer
- Firm
- Zenith Engineers
- Based in
- Hayward
- On San Francisco permits
- May 2019 to Jun 2023
6 permits since 2000 (engineer on 6 permits): 3 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 22, 2023 | Never finaled issued Aug 2023, no final | 845 26th Av | install new beams on 2/f living room, reconnect ceiling joistsDetails
install new beams on 2/f living room, reconnect ceiling joists | $15,000 | |
| Mar 14, 2022 | Completed final sign-off Jul 2022 | 2121 15th Av | Cornerstone Dba Ag Construction | rebuild of (e) yard masonary walls. voluntary seismic retrofit of crawl space & cripple walls.Details
rebuild of (e) yard masonary walls. voluntary seismic retrofit of crawl space & cripple walls. | $50,000 |
| Sep 9, 2020 | Completed final sign-off Nov 2022 | 2975 Cesar Chavez St | Fortunate Construction Llc | convert existing uncoditioned gr level into new 2 br/1 ba additional dwelling (adu). interior remodel of e single family residence. expansion of e deck and addition of new dedk on e roof. replacing all doors and windows with new energy compliant windows doors. no work proposed on facade.Details
convert existing uncoditioned gr level into new 2 br/1 ba additional dwelling (adu). interior remodel of e single family residence. expansion of e deck and addition of new dedk on e roof. replacing all doors and windows with new energy compliant windows doors. no work proposed on facade. | $175,000 |
| Feb 21, 2020 | Expired or cancelled withdrawn Nov 2020 | 2506 28th Av | add a deck to the rear of the building 2nd floor with stair to gain access to the rear yard. adu under pa# 202001272826.Details
add a deck to the rear of the building 2nd floor with stair to gain access to the rear yard. adu under pa# 202001272826. | $20,000 | |
| Jan 27, 2020 | Expired or cancelled withdrawn Nov 2020 | 2506 28th Av | add adu per ord# 95-17. convert the 1st floor to a 2 bedroom, 1 bathroom and 1 kitchen/dining room. lower the floor to gain the required ceiling height.Details
add adu per ord# 95-17. convert the 1st floor to a 2 bedroom, 1 bathroom and 1 kitchen/dining room. lower the floor to gain the required ceiling height. | $80,000 | |
| May 22, 2019 | Completed final sign-off Sep 2020 | 260 Clara St | Axis Construction | voluntary shear wall repairs and upgrade according to engineer plans. work not visible from the street. interior shear walls and rear exterior shear wall.Details
voluntary shear wall repairs and upgrade according to engineer plans. work not visible from the street. interior shear walls and rear exterior shear wall. | $185,750 |