Dennis Gillespie
- Listed as
- architect, engineer
- Firm
- Dennis J Gillespie
- Based in
- San Rafael
- On San Francisco permits
- Nov 2010 to Jun 2026
29 permits since 2000 (engineer on 25 permits, architect on 4 permits): 21 completed, 4 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jul 2026 | 459 17th Av | Murphy Construction Llc | convert 630 sq ft of garage space to living space w/bedroom and bath. add laundry room.Details
convert 630 sq ft of garage space to living space w/bedroom and bath. add laundry room. | $100,000 |
| May 22, 2026 | In progress filed May 2026, not yet issued | 855 40th Av | concrete footing revision to bpa: 202406063842 for cast in hold with rod.Details
concrete footing revision to bpa: 202406063842 for cast in hold with rod. | $750 | |
| Sep 26, 2025 | In progress issued Oct 2025 | 127 21st Av | Murphy Construction Llc | revision to pa# 202506037816: convert (e) garage space on 1/f to living space with a new laundry, bath, family room and storage. relocate kitchen on 2/f. add windows to rear elevation.Details
revision to pa# 202506037816: convert (e) garage space on 1/f to living space with a new laundry, bath, family room and storage. relocate kitchen on 2/f. add windows to rear elevation. | $85,000 |
| Sep 22, 2025 | Completed final sign-off Dec 2025 | 367 Church St | Continuum Construction | unit 6- add (n) wall mount lavatory sink in (e) water closet. recess sink in non load bearing wall.Details
unit 6- add (n) wall mount lavatory sink in (e) water closet. recess sink in non load bearing wall. | $4,000 |
| Feb 27, 2025 | Completed final sign-off Jun 2025 | 2 Corwin St | Continuum Construction | revision to pa# 202409251589: eliminate a post and beam as part of a kitchen remodel. creaste a storage room.Details
revision to pa# 202409251589: eliminate a post and beam as part of a kitchen remodel. creaste a storage room. | $5,000 |
| Sep 17, 2024 | Completed final sign-off Jan 2025 | 492 Bartlett St | Continuum Construction | revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft.Details
revision to 202206176631 (2nd floor) and 202206136184 [which revised 201807114267](1st floor) including new configuration of existing interior partition walls and new bath and kitchen fixtures at existing locations. no exterior work, no additional sqft. | $100,000 |
| Aug 30, 2024 | Completed final sign-off Jan 2025 | 492 Bartlett St | Continuum Construction | install metal rail at interior second floor stair. guardrail to be 42" tallDetails
install metal rail at interior second floor stair. guardrail to be 42" tall | $6,000 |
| Aug 26, 2024 | In progress issued Jan 2025 | 150 Stanford Heights Av | Fay Construction & Restoration Inc | horizontal addition at first floor with roof deck at rear of (e) house. new space will ontain an expansion to bedroom and garage. windows and siding at rear on 2nd flr replace. replace furnace. no work visible from public way.Details
horizontal addition at first floor with roof deck at rear of (e) house. new space will ontain an expansion to bedroom and garage. windows and siding at rear on 2nd flr replace. replace furnace. no work visible from public way. | $57,300 |
| Jan 23, 2024 | Completed final sign-off Jul 2024 | 705 Broderick St | Continuum Construction | partial foundation replacement. shearwall retrofitting (voluntary)Details
partial foundation replacement. shearwall retrofitting (voluntary) | $25,000 |
| Aug 14, 2023 | Completed final sign-off Feb 2024 | 2510 Bush St | G B U Construction Development, Nolan Construction Inc | repair e site retaining wall (rear) with new drilled pier retaining wall. comply withy nov 202301867Details
repair e site retaining wall (rear) with new drilled pier retaining wall. comply withy nov 202301867 | $25,000 |
| Nov 9, 2022 | Completed final sign-off Aug 2024 | 1484 16th Av | Ebuild | new 138 sf upper deck & stair @ rear. new sliding door for new deck. remodel ground floor rooms.Details
new 138 sf upper deck & stair @ rear. new sliding door for new deck. remodel ground floor rooms. | $5,600 |
| May 17, 2022 | Completed final sign-off Aug 2026 | 261 Chattanooga St | Tech Home Inc, Levi's Construction Co | per unit legalization ordinance# 43-14, legalize unpermitted adu existing prior to 2013. no related pass-through credits/allowences for added seismic retro-fit work.Details
per unit legalization ordinance# 43-14, legalize unpermitted adu existing prior to 2013. no related pass-through credits/allowences for added seismic retro-fit work. | $8,950 |
| May 6, 2022 | Expired or cancelled expired Oct 2025 | 140 Jasper Pl | 2nd fl seismic upgrade of existing building. siding to be replaced as required at dry rot type.Details
2nd fl seismic upgrade of existing building. siding to be replaced as required at dry rot type. | $65,000 | |
| Apr 8, 2022 | Expired or cancelled expired Oct 2025 | 140 Jasper Pl | remodel of (e) brick footings. excavation of ~7" of soil. (n) concrete foundations. (n) plywood shearwall sheathing & anchor bolting. voluntery strengthening.Details
remodel of (e) brick footings. excavation of ~7" of soil. (n) concrete foundations. (n) plywood shearwall sheathing & anchor bolting. voluntery strengthening. | $68,000 | |
| Mar 17, 2022 | Completed final sign-off May 2023 | 2554 14th Av | Maximo Construction | legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f.Details
legalize unpermitted work to lower level. bedroom, family room, 2 baths, remodel (e) kitchen on 2/f. | $175,000 |
| Jun 16, 2021 | Never finaled issued Jun 2021, no final | 5636 California St | Great Metal Design | replace all concrete damaged steps, rebuild new landing re-install(e) railingsDetails
replace all concrete damaged steps, rebuild new landing re-install(e) railings | $85,000 |
| Nov 30, 2020 | Completed final sign-off Dec 2021 | 3645 Santiago St | O'conaire Construction | reconfigure interior walls. remodel kitchen & bathroom. add half bath. add 2 windows. reconfigure (e) exterior stairs. upgrade electrical.Details
reconfigure interior walls. remodel kitchen & bathroom. add half bath. add 2 windows. reconfigure (e) exterior stairs. upgrade electrical. | $150,000 |
| Jan 31, 2020 | Completed final sign-off Nov 2020 | 185 16th Av | Williams Construction | revision to pa 2019-1016-4600 (common area) stair structural repair of (e) exterior stairs) in kindDetails
revision to pa 2019-1016-4600 (common area) stair structural repair of (e) exterior stairs) in kind | $4,000 |
| Feb 7, 2017 | Completed final sign-off Sep 2022 | 3063 Laguna St | Bbc Construction Inc. | revision to 201612144995 relocate bathroom to s. corner, remove wall to enlarge kitchen, replace bathroom wiring with new romex, replace subpanel, replace 20(e) windows - all in kind, max u-factor 0.32, replace fireplace with new gas insert fireplaceDetails
revision to 201612144995 relocate bathroom to s. corner, remove wall to enlarge kitchen, replace bathroom wiring with new romex, replace subpanel, replace 20(e) windows - all in kind, max u-factor 0.32, replace fireplace with new gas insert fireplace | $20,000 |
| May 4, 2015 | Completed final sign-off Mar 2016 | 2925 Larkin St | removal and replacement of a +/-48ft of foundation, damaged during house releveling. revision to app#201503261937.Details
removal and replacement of a +/-48ft of foundation, damaged during house releveling. revision to app#201503261937. | $3,000 | |
| Apr 10, 2015 | Completed final sign-off Mar 2016 | 2925 Larkin St | North Pacific Builders | remove kitchen @ lower floor (basement), remodel one (e) bathroom, build three addt'l baths within (e) footprint of house, remodel, replace heating system w/61,000 btu central heating unit, relocate water heater.Details
remove kitchen @ lower floor (basement), remodel one (e) bathroom, build three addt'l baths within (e) footprint of house, remodel, replace heating system w/61,000 btu central heating unit, relocate water heater. | $110,000 |
| Mar 26, 2015 | Completed final sign-off Mar 2016 | 2925 Larkin St | relevel extg 2nd floor. new footing, anchor bolts and lower slab. new floor beams. cripple and shear wall sheathing.Details
relevel extg 2nd floor. new footing, anchor bolts and lower slab. new floor beams. cripple and shear wall sheathing. | $20,000 | |
| Jan 23, 2015 | Completed final sign-off Jul 2015 | 2028 Scott St | Everbuilt Construction, Inc. | soft story retrofit per sfbc chapter 34b. 2012 iebc apendix a-4.Details
soft story retrofit per sfbc chapter 34b. 2012 iebc apendix a-4. | $40,000 |
| Sep 4, 2014 | Expired or cancelled expired May 2019 | 3506 24th St | new concrete foundation removal of e brick foundation. excavation of e crawl/storage. new plywoood. sheathing shearwalls, dryrot repair for 1st and 2nd rear aerasDetails
new concrete foundation removal of e brick foundation. excavation of e crawl/storage. new plywoood. sheathing shearwalls, dryrot repair for 1st and 2nd rear aeras | $40,000 | |
| Sep 17, 2013 | Completed final sign-off Feb 2014 | 925 Larkin St | S4s Construction Inc | revision to app#201307192270. floor strengthening under equipment.Details
revision to app#201307192270. floor strengthening under equipment. | $5,000 |
| Aug 6, 2012 | Completed final sign-off May 2013 | 132 Hawthorne St | revision to pa# 201201242804, tenant improvement for office, change include: location of restrooms, conference rooms and kitchen. relocation of roof mech unit involving framing alterations; construct temp platform over (e) loading dock parking.Details
revision to pa# 201201242804, tenant improvement for office, change include: location of restrooms, conference rooms and kitchen. relocation of roof mech unit involving framing alterations; construct temp platform over (e) loading dock parking. | ||
| Apr 30, 2012 | Completed final sign-off Sep 2012 | 132 Hawthorne St | revision to permit pa #201203226658, revision to wall anchors.Details
revision to permit pa #201203226658, revision to wall anchors. | ||
| Mar 9, 2011 | Completed final sign-off Nov 2011 | 211 Belgrave Av | Everbuilt Construction, Inc. | remodel existing storage spaces @ 1st floor into new bedroom & bathroom, remodel existing bathroom, new durnace to serve 1st floor & existing furnace to serve on 2nd floor. interior alterations only, no work at exterior.Details
remodel existing storage spaces @ 1st floor into new bedroom & bathroom, remodel existing bathroom, new durnace to serve 1st floor & existing furnace to serve on 2nd floor. interior alterations only, no work at exterior. | $48,000 |
| Nov 5, 2010 | Completed final sign-off Apr 2011 | 2042 47th Av | Quality Construction By V M | kitchen remodeling: cabinets, granite, appliances. demo interior wall between kitchen and living rm, recess lights and electrical updateDetails
kitchen remodeling: cabinets, granite, appliances. demo interior wall between kitchen and living rm, recess lights and electrical update | $36,000 |