Dencio J. Vincent
- License
- C9229
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Nelson Architecture Inc.
- Based in
- Sanjose
- On San Francisco permits
- Jul 2019 to Apr 2022
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- G Swanson Constr. Inc., Gowan Construction, Peacock Construction
- Engineers
- James Meyer, Michael Kuykendall, Steven Crain
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 20, 2022 | Completed final sign-off Jun 2023 | 2 Embarcadero Center | Peacock Construction | ste 1200: interior t.i. - demo non-structural partitions, doors, millwork. construction of new walls, doors, millwork, power, finishes. new mech,elec, & plum.Details
ste 1200: interior t.i. - demo non-structural partitions, doors, millwork. construction of new walls, doors, millwork, power, finishes. new mech,elec, & plum. | $694,000 |
| Sep 9, 2019 | Never finaled issued Jan 2020, no final | 340 Bryant St | Gowan Construction | modification of existing tenant improvement including new full height & partial height walls. new interior chain-link fencing. lighting upgrades, new cabinets at existing break areas.Details
modification of existing tenant improvement including new full height & partial height walls. new interior chain-link fencing. lighting upgrades, new cabinets at existing break areas. | $150,000 |
| Jul 2, 2019 | Completed final sign-off Feb 2020 | 3250 Mission St | G Swanson Constr. Inc. | voluntary barrier removal upgrade per cbc 11b 202.4 at interior of bank. new tactile signs, remove and install new check desk, replqace entry door, new partial height and cntrtop. at exterior, modifications will be made to e accessible parking, located within property lineDetails
voluntary barrier removal upgrade per cbc 11b 202.4 at interior of bank. new tactile signs, remove and install new check desk, replqace entry door, new partial height and cntrtop. at exterior, modifications will be made to e accessible parking, located within property line | $115,000 |