Thomas Wilson
- License
- C24971
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Twa Arch,Inc
- Based in
- Benicia
- On San Francisco permits
- Oct 2004 to Oct 2014
5 permits since 2000 (architect on 5 permits): 4 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- U.S. Samson Construction, West Coast Canopies Inc/Paradiso Const.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 5 have no building type on record and are shown as other.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2014 | Completed final sign-off Jan 2015 | 1503 Sloat Bl | rev. pa#201404082712 modify sizework to relocate delivery ramp. n/a ordinance #155-13.Details
rev. pa#201404082712 modify sizework to relocate delivery ramp. n/a ordinance #155-13. | ||
| Apr 8, 2014 | Completed final sign-off Jan 2015 | 1503 Sloat Bl | U.S. Samson Construction | t.i. to (e) space. add (2) restrooms & office. replace (e) entry door w/automatic sliding doors. remove (e) storefront & replace w/pairs of doors to match storefront add (n) concrete loading ramp. compliance with ordinance no.155-13 not required.Details
t.i. to (e) space. add (2) restrooms & office. replace (e) entry door w/automatic sliding doors. remove (e) storefront & replace w/pairs of doors to match storefront add (n) concrete loading ramp. compliance with ordinance no.155-13 not required. | $100,000 |
| Mar 10, 2005 | Completed final sign-off Nov 2005 | 1611 Oak St | ada upgrade- restroom, ramp, accessible parking. guardrail around deck, wheelchair liftDetails
ada upgrade- restroom, ramp, accessible parking. guardrail around deck, wheelchair lift | $50,000 | |
| Dec 30, 2004 | Completed final sign-off Sep 2005 | 1 Market St | remodel (e) retail space on 1st floor to include new partition, lighting, electrical, counter, fixtrDetails
remodel (e) retail space on 1st floor to include new partition, lighting, electrical, counter, fixtr | $75,000 | |
| Oct 18, 2004 | Never finaled filed Oct 2004, never issued | 551 03rd St | West Coast Canopies Inc/Paradiso Const. | add led internaly illuminated ligtbar & replace existing red striped vinyl on gas station canopy**Details
add led internaly illuminated ligtbar & replace existing red striped vinyl on gas station canopy** |