Dean H. Iwasa
- License
- GE2285
- Geotechnical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up GE2285 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Haley & Aldrich
- On San Francisco permits
- May 2012 to Jan 2014
4 permits since 2000 (engineer on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Haley & Aldrich Inc (4), Haley & Aldrich Construction Services
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 13, 2014 | Completed final sign-off May 2014 | 135 Alhambra St | Haley & Aldrich Construction Services, Haley & Aldrich Inc | demolish (e) rear hardscape/landscape features. excavate & backfill sequenced slot trenches. drill & install soldier pile & lagging. excavate max 4 ft gsg installing shoring boards, backfill to previous existing grade. compliance with ordinance #155-13 is exempt.Details
demolish (e) rear hardscape/landscape features. excavate & backfill sequenced slot trenches. drill & install soldier pile & lagging. excavate max 4 ft gsg installing shoring boards, backfill to previous existing grade. compliance with ordinance #155-13 is exempt. | $150,000 |
| Jul 30, 2012 | Completed final sign-off Oct 2012 | 1545 Beach St | Haley & Aldrich Inc | revision to appl #2012.0531.1635 - modified the planned excavation alignment.Details
revision to appl #2012.0531.1635 - modified the planned excavation alignment. | $5,000 |
| May 11, 2012 | Completed final sign-off Aug 2013 | 134 Alhambra St | Haley & Aldrich Inc | break out existing walkways & hardslape; install shoring; excavate 3 ft bgs; partial backfill; excavate 2nd area using sloping to total depth of 5 ft bgs; backfill to initial conditions.Details
break out existing walkways & hardslape; install shoring; excavate 3 ft bgs; partial backfill; excavate 2nd area using sloping to total depth of 5 ft bgs; backfill to initial conditions. | $50,000 |
| May 11, 2012 | Completed final sign-off Aug 2012 | 74 Mallorca Wy | Haley & Aldrich Inc | break out the existing concrete walkways along sides of backyard and pattio; hand excavate 45 cubicyds of and dispose at landfill; backfill and grade to initial conditions; pour concrete walkways and pad.Details
break out the existing concrete walkways along sides of backyard and pattio; hand excavate 45 cubicyds of and dispose at landfill; backfill and grade to initial conditions; pour concrete walkways and pad. | $50,000 |