D C Kim
- License
- 24140
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- Firm
- Legacy Partners
- On San Francisco permits
- Oct 2006 to Apr 2008
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Legacy Partners C D S Inc (2), L.G. Construction Co.,Inc
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2008 | Completed final sign-off Jul 2008 | 160 Spear St | Legacy Partners C D S Inc | install under grid partitions, new sidelights, base cabinets & sink. mep & life safety to be submitted under seperate permitDetails
install under grid partitions, new sidelights, base cabinets & sink. mep & life safety to be submitted under seperate permit | $85,000 |
| Dec 27, 2007 | Completed final sign-off Apr 2008 | 160 Spear St | Legacy Partners C D S Inc | removal of one hour partition. removal & installation of under grid partitions. installation of new doors, sidelights and glazing, and one hour partition. mep under separate permit. replace 2 drinking fountains in corridors with accessible fixtures.Details
removal of one hour partition. removal & installation of under grid partitions. installation of new doors, sidelights and glazing, and one hour partition. mep under separate permit. replace 2 drinking fountains in corridors with accessible fixtures. | $90,000 |
| Oct 18, 2006 | Completed final sign-off Dec 2010 | 530 Crestlake Dr | L.G. Construction Co.,Inc | adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior.Details
adding 2nd flor master bed room & bbaths , 2 bed room and bath, remodel kitchen & exterior. | $20,000 |