David Huynh
- Listed as
- architect, engineer
- On San Francisco permits
- Aug 2015 to Sep 2019
6 permits since 2000 (architect on 3 permits, engineer on 3 permits): 2 completed, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2019 | Never finaled issued Feb 2020, no final | 3414 22nd St | Ping Hong Liang | ti of existing store into a beverage to-go store. remodel (e) unit into a beverage (fruit juice & soda) to-go store per plans. work onl only in the ground floor.Details
ti of existing store into a beverage to-go store. remodel (e) unit into a beverage (fruit juice & soda) to-go store per plans. work onl only in the ground floor. | $20,000 |
| Sep 15, 2016 | Never finaled issued Sep 2016, no final | 572 Ofarrell St | revision to pa #201409126222 - change occupancy from b to a-2 (assembly permit). no work at this permit. n/a maher ordinanceDetails
revision to pa #201409126222 - change occupancy from b to a-2 (assembly permit). no work at this permit. n/a maher ordinance | ||
| Mar 29, 2016 | Completed final sign-off Mar 2016 | 622 Green St | Lt Construction Inc | comply with nov #2015-57381. infill existing opening hole on the wall between (2) units 622 green street and 515 columbus ave.Details
comply with nov #2015-57381. infill existing opening hole on the wall between (2) units 622 green street and 515 columbus ave. | $2,200 |
| Mar 10, 2016 | Completed final sign-off Mar 2017 | 801 Kearny St | Lt Construction Inc | relocate (e) entry and replace front windows as per plan. the proposed door and windows will match the (e) storefront system. finish with matching materialsDetails
relocate (e) entry and replace front windows as per plan. the proposed door and windows will match the (e) storefront system. finish with matching materials | $11,000 |
| Nov 5, 2015 | Never finaled issued Mar 2016, no final | 572 Ofarrell St | Lt Construction Inc | install lift to comply with ada building code for (e) restaurant.Details
install lift to comply with ada building code for (e) restaurant. | $35,000 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 801 Kearny St | Seabee Construction | soft demo of an extg full restaurant to demolish non-bearing wall, counters, workout tables, and hood system per ab- 017. extg fire sprinkler system ceiling light fixtures plmg fixtures and hvac system to remain. n/a for maherDetails
soft demo of an extg full restaurant to demolish non-bearing wall, counters, workout tables, and hood system per ab- 017. extg fire sprinkler system ceiling light fixtures plmg fixtures and hvac system to remain. n/a for maher | $15,000 |