Daryoush Darius Abolhassani
- Listed as
- engineer
- Firm
- Darius Abolhassani Consult
- On San Francisco permits
- May 2015 to Nov 2025
3 permits since 2000 (engineer on 3 permits): 1 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2025 | In progress filed Nov 2025, not yet issued | 425 Upper Tr | unit 4- relocat of entry door, kitchen and bathroom. expansion of master suite and relocate of common stair . no change to building envelopeDetails
unit 4- relocat of entry door, kitchen and bathroom. expansion of master suite and relocate of common stair . no change to building envelope | $190,000 | |
| Jul 26, 2022 | Completed final sign-off Aug 2023 | 1990 Green St | Brendan Lalor Construction | unit 105: kitchen, main bath, and guest bath remodel.Details
unit 105: kitchen, main bath, and guest bath remodel. | $200,000 |
| May 27, 2015 | Expired or cancelled cancelled Nov 2017 | 79 Cragmont Av | hor. addtn,2/f vert.addtn. a volun. seismic safety upgrade, shear wall & foundations, replace existing fireplace, (n) radiant heat system, electrical upgrade, eliminate (1) powder room. (n) garage door, (n) windows, (n) retaining wall. 2nd flr vertical addition to include 3 bedroom & 2 bathrooms.Details
hor. addtn,2/f vert.addtn. a volun. seismic safety upgrade, shear wall & foundations, replace existing fireplace, (n) radiant heat system, electrical upgrade, eliminate (1) powder room. (n) garage door, (n) windows, (n) retaining wall. 2nd flr vertical addition to include 3 bedroom & 2 bathrooms. | $80,000 |