Dan Dyckman
- Listed as
- engineer
- Firm
- Geoforensic
- Based in
- Foster City
- On San Francisco permits
- Apr 2008 to Mar 2022
3 permits since 2000 (engineer on 3 permits): 3 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 29, 2022 | Completed final sign-off Sep 2022 | 178 Alpine Tr | Artcore Construction | replace concrete retaining wall with new segmental black wallDetails
replace concrete retaining wall with new segmental black wall | $30,000 |
| Nov 29, 2012 | Completed final sign-off Dec 2012 | 135 04th St | S Visions Construction | installation of a new 278 sq ft information kiosk. the new kiosk is fabricated elsewaher and is delivered on site where it is assenbled and connected to the malls extg floor receptacles.Details
installation of a new 278 sq ft information kiosk. the new kiosk is fabricated elsewaher and is delivered on site where it is assenbled and connected to the malls extg floor receptacles. | $40,000 |
| Apr 28, 2008 | Completed final sign-off Jun 2008 | 333 Santa Ana Av | Dobel Construction | drainage system at exterior left side. pump pit & pump. discharge water to sanitarg sewer.Details
drainage system at exterior left side. pump pit & pump. discharge water to sanitarg sewer. | $10,000 |