Dale Anderson
- Listed as
- architect, authorized agent-others
- Firm
- Dale Anderson Architect
- Based in
- San Mateo
- On San Francisco permits
- Dec 2003 to Aug 2026
23 permits since 2000 (architect on 22 permits, authorized agent-others on 1 permit): 19 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 2243 Steiner St | Cody Design Build Inc | remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den.Details
remodel kitchen and (3) (e) bathrooms. relocate laundry to 2/f. add wall to close off (e) den. | $208,177 |
| Mar 2, 2026 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | Damar Construction And Remodeling Inc | revision to permit 2023-0404-5036-s1. change in deck guardrail from previously approved cable rail system to a glass balustrade system with a top rail. from cable guardrail to glass guardrail systemDetails
revision to permit 2023-0404-5036-s1. change in deck guardrail from previously approved cable rail system to a glass balustrade system with a top rail. from cable guardrail to glass guardrail system | $100 |
| Jan 8, 2026 | Completed final sign-off Aug 2026 | 1020 Union St | Better Built Contractor Inc | remodel (e) bathroom. replace fixtures, tile, lighting. open door that was closed off. no structural work. relocate washer and dryer to garage from home office.Details
remodel (e) bathroom. replace fixtures, tile, lighting. open door that was closed off. no structural work. relocate washer and dryer to garage from home office. | $20,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2026 | 15 Gladeview Wy | Damar Construction And Remodeling Inc | 205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard.Details
205 sf addition to rear of house w/roof deck above (212 sf). new 75 sf deck off of upper level with stairs to yard. new 511 sf deck at yard. | $95,000 |
| Oct 2, 2020 | Completed final sign-off Dec 2020 | 2722 15th Av | J R M Construction | remodel master bathroom onlyDetails
remodel master bathroom only | $20,776 |
| Sep 30, 2020 | Completed final sign-off Sep 2023 | 945 Green St | Burke Construction, Danziger Builders | unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room.Details
unit 10: work to (e) full floor on 11/f: remodel (e) kitchen, master suite, 3 bedrooms, and laundry room. | $194,589 |
| Feb 26, 2020 | Completed final sign-off Oct 2020 | 1 Hawthorne St | Burke Construction | minor remodel of kitchen in existing condo, remove existing closet (non bearing wall) in den & provide new cabinet, redo existing laundry closetDetails
minor remodel of kitchen in existing condo, remove existing closet (non bearing wall) in den & provide new cabinet, redo existing laundry closet | $20,000 |
| Oct 28, 2019 | Completed final sign-off Jun 2020 | 143 Hamerton Av | J R M Construction | kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house)Details
kitchen and bath remodel - raise ceiling in kitchen bath and study up to existing floor joists of level above replace existing kitchen window with new small window. (kitchen window is at the rear or the house) | $48,307 |
| Apr 30, 2018 | Completed final sign-off Nov 2018 | 1020 Union St | Burke Construction | unit #3 - remodel kitchen with new cabinets & appliances. remodel bathroom, build new closet in bedroomDetails
unit #3 - remodel kitchen with new cabinets & appliances. remodel bathroom, build new closet in bedroom | $75,000 |
| Sep 6, 2017 | Completed final sign-off Feb 2019 | 2961 Sacramento St | S F Garage Company Inc. | excavate 46.66 cubic yards fo basement vrawl space to allow for new garage. tie new portion of basement into existing basement. provide ramp (driveway) from sidewalk to new garage. provide new handrail @ exisitng entry steps.Details
excavate 46.66 cubic yards fo basement vrawl space to allow for new garage. tie new portion of basement into existing basement. provide ramp (driveway) from sidewalk to new garage. provide new handrail @ exisitng entry steps. | $80,000 |
| Apr 26, 2016 | Completed final sign-off Jun 2016 | 998 Geneva Av | J R M Construction | change of use from kickbox to barber school. tenant improvement of (e) space, new accessible toilet room.Details
change of use from kickbox to barber school. tenant improvement of (e) space, new accessible toilet room. | $10,700 |
| Jun 25, 2015 | Completed final sign-off Mar 2016 | 331 Panorama Dr | Walsh Construction | revision to appl #2014.0220.8935 - new stairway to rear yard, new retaining walls & one hour walls in rear yard, new garage door, new windows @ front elevation.Details
revision to appl #2014.0220.8935 - new stairway to rear yard, new retaining walls & one hour walls in rear yard, new garage door, new windows @ front elevation. | $10,000 |
| Jun 22, 2015 | Completed final sign-off Sep 2016 | 15 Gladeview Wy | Walsh Construction | remove non-bearing wall @ entry, add new skylight, replace enty door, build out exisitng lower level with new family room, laundry room & bath. replace (e) door to rear yard with new french door. replace (e) rear yard window with sliding french door.Details
remove non-bearing wall @ entry, add new skylight, replace enty door, build out exisitng lower level with new family room, laundry room & bath. replace (e) door to rear yard with new french door. replace (e) rear yard window with sliding french door. | $57,400 |
| Feb 12, 2015 | Completed final sign-off Mar 2016 | 225 Frederick St | Burke Construction | change of use from grocery to fitness studio. provide new 1-hr hall & exit so that back of bldg is 75 ft from exit. provide new accessible toilet facilities & shower facility. level existing entrance. provide new stairway to basement storage room. remov e(e) columns at basement & main floor.Details
change of use from grocery to fitness studio. provide new 1-hr hall & exit so that back of bldg is 75 ft from exit. provide new accessible toilet facilities & shower facility. level existing entrance. provide new stairway to basement storage room. remov e(e) columns at basement & main floor. | $150,000 |
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 1160 Mission St | Walsh Construction | #908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13Details
#908- remodel (e) kitchen & bath. add peninsula, new sink, wine refrig, relocate dishwasher, replace toilet, new window into shower, new shower valve,cabinets,new vanity faucet, new storage cabients, new glass tub enclosure,redo & add lighting, elect thruout unit. n/a compliance w/ordinance #155-13 | $55,000 |
| Feb 22, 2012 | Completed final sign-off Dec 2013 | 868 Head St | 279 sqft. single level addition to (e) main level of residence. remodel (e) kitchen. add new master bedroom & master bath & sun room. relocate (e) bathroom. add new skylight in (e) kitchen.Details
279 sqft. single level addition to (e) main level of residence. remodel (e) kitchen. add new master bedroom & master bath & sun room. relocate (e) bathroom. add new skylight in (e) kitchen. | $100,000 | |
| Dec 10, 2010 | Never finaled issued Jun 2011, no final | 79 Norton St | new 1,281 sqft. two story addition over artists studio at rear of property. lower level. artists studio. main level -bedroom and family room addition. upper level. master bedroom and bathroom additon.Details
new 1,281 sqft. two story addition over artists studio at rear of property. lower level. artists studio. main level -bedroom and family room addition. upper level. master bedroom and bathroom additon. | $230,131 | |
| Sep 3, 2010 | Completed final sign-off Jun 2012 | 5561 Diamond Heights Bl | 32 sq ft single level addition to existin main level of residence, remodel existing kitchen, add two bay windows under existing over hang of second level.Details
32 sq ft single level addition to existin main level of residence, remodel existing kitchen, add two bay windows under existing over hang of second level. | $90,000 | |
| Jun 10, 2009 | Completed final sign-off Oct 2009 | 15 Gladeview Wy | Walsh Construction | remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den.Details
remodel bathroom on 2nd floor- work includes removal non-bearing wall & const new walls for bathroom. reconfigure closets & opening into existing den. | $30,000 |
| May 8, 2008 | Completed final sign-off Aug 2008 | 2112 California St | Dlh Construction | master bath remodel, gut bath wall and ceiling to the e substructure. e window to remain. upgrade plumbing/elec. move an unstructural wall, new shower with shower pan and shower valve, relocate toilet and sink, insulate walls and ceiling. sheetrock, tape, texture, tile bath. repair hardwood floor.Details
master bath remodel, gut bath wall and ceiling to the e substructure. e window to remain. upgrade plumbing/elec. move an unstructural wall, new shower with shower pan and shower valve, relocate toilet and sink, insulate walls and ceiling. sheetrock, tape, texture, tile bath. repair hardwood floor. | $75,000 |
| Jan 12, 2007 | Expired or cancelled expired May 2009 | 3018 California St | horizontal enlargement at side and rear. remodel master bedroom, deck, kitchen and 2 baths.Details
horizontal enlargement at side and rear. remodel master bedroom, deck, kitchen and 2 baths. | $20,000 | |
| Apr 21, 2006 | Expired or cancelled expired Dec 2010 | 661 Spruce St | Perfect Bldr. Inc/Dba: Bldg. Solutions | reduce scope- change approved appl#200505202995 for construction already in progress. modify 2 story deck addition to not go from property line to property line, instead, bring in on both sides from property line 3'Details
reduce scope- change approved appl#200505202995 for construction already in progress. modify 2 story deck addition to not go from property line to property line, instead, bring in on both sides from property line 3' | |
| Dec 11, 2003 | Completed final sign-off Apr 2005 | 742 04th Av | horizontal addition: garage addition w/ deck aboveDetails
horizontal addition: garage addition w/ deck above | $50,000 |