Justin Kenneth Krum
- Listed as
- authorized agent-others, contractor
- Firm
- 1st Light Energy Inc.
- Based in
- Manteca
- On San Francisco permits
- Jun 2019 to Oct 2023
4 permits since 2000 (contractor on 4 permits, authorized agent-others on 1 permit): 1 completed, 1 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Engineers
- Baljit S. Chopra (3), Manouchehr Hakhamaneshi
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 23, 2023 | In progress issued Aug 2025 | 2690 Geary Bl | 1st Light Energy Inc. | provide and install a utility interactive roof mounted photovoltaic systemDetails
provide and install a utility interactive roof mounted photovoltaic system | $12,800 |
| Jan 6, 2023 | Completed final sign-off Jan 2024 | 190 10th St | 1st Light Energy Inc. | provide and install a utility interactive roof mounted photovoltaic system 33.60kw dcDetails
provide and install a utility interactive roof mounted photovoltaic system 33.60kw dc | $36,390 |
| Nov 8, 2022 | Never finaled issued Oct 2023, no final | 611 02nd St | 1st Light Energy Inc. | provide & install a utility ineractive roof mounted photovoltaic system 47.58kw dc/41.67kw acDetails
provide & install a utility ineractive roof mounted photovoltaic system 47.58kw dc/41.67kw ac | $52,338 |
| Jun 12, 2019 | Never finaled issued Jan 2022, no final | 2501 Cesar Chavez St | 1st Light Energy Inc. | installation of a 100.9kw roof mounted solar pv system.Details
installation of a 100.9kw roof mounted solar pv system. | $115,000 |