Permit GraphShortlistSan Francisco building permits since 2000

Christopher Durkin P.E.

License
C71064
Civil engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up C71064 at the Board for Professional Engineers
Listed as
engineer
On San Francisco permits
Oct 2010 to May 2016

12 permits since 2000 (engineer on 12 permits): 12 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Eastwood Development Incorporated (5), Aaron Gordon Construction Inc, Axis Construction, Durkin Inc., J C Woodworks & Design, Kerley Construction Inc, Kohlmyer

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 18, 2016Completed
final sign-off Nov 2017
4261 23rd StDurkin Inc.remove and replace (e) slab on grade and wall footings
Details
Permit
201605187712
Permit issued
May 18, 2016
Final sign-off
Nov 2, 2017

remove and replace (e) slab on grade and wall footings

Open the permit page

$15,000
Jul 31, 2014Completed
final sign-off Jan 2015
4194 17th StKohlmyerrevision to permit appn. 201403241549, additional 1st floor framing @ rear of buuilding to support floor framing, new 1st flr framing (joists) @ rear of bldg, new 2x6 stud wall @ rear of bldg, new 2x4 stud walls @ 1st and 2nd flr; revision to simpson hangers specified.
Details
Permit
201407312626
Permit issued
Aug 6, 2014
Final sign-off
Jan 15, 2015

revision to permit appn. 201403241549, additional 1st floor framing @ rear of buuilding to support floor framing, new 1st flr framing (joists) @ rear of bldg, new 2x6 stud wall @ rear of bldg, new 2x4 stud walls @ 1st and 2nd flr; revision to simpson hangers specified.

Open the permit page

$5,000
Mar 31, 2014Completed
final sign-off Jul 2014
455 Vallejo StAxis Constructionrevision to appl #2013.0619.9976 - revise footing, new concrete footing 2' wide by 10' long.
Details
Permit
201403312015
Permit issued
Apr 4, 2014
Final sign-off
Jul 22, 2014

revision to appl #2013.0619.9976 - revise footing, new concrete footing 2' wide by 10' long.

Open the permit page

Dec 12, 2013Completed
final sign-off Mar 2014
53 Alvarado StAaron Gordon Construction Incremoval of wall & installation of (n) beam at kitchen at 2nd floor.
Details
Permit
201312124047
Permit issued
Jan 27, 2014
Final sign-off
Mar 31, 2014

removal of wall & installation of (n) beam at kitchen at 2nd floor.

Open the permit page

$5,000
Feb 14, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedremodel ktichen & bathrooms @ 2nd floor.
Details
Permit
201302140203
Permit issued
Feb 14, 2013
Final sign-off
May 15, 2013

remodel ktichen & bathrooms @ 2nd floor.

Open the permit page

$30,000
Jan 16, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedremodel kitchen & baths, voluntary structural upgrades, add bedroom. relocate 1/2 bath convert to full bath. at master bath add bathtub.
Details
Permit
201301168086
Permit issued
Jan 18, 2013
Final sign-off
May 15, 2013

remodel kitchen & baths, voluntary structural upgrades, add bedroom. relocate 1/2 bath convert to full bath. at master bath add bathtub.

Open the permit page

$20,000
Feb 17, 2012Completed
final sign-off Apr 2012
9 Douglass StJ C Woodworks & Designrevision to appl #2011.09.07.3971 - omission of posts & footings on ground level to be replaced with (1) lvl & (1) 4 x 12 df on 1st level.
Details
Permit
201202174395
Permit issued
Mar 28, 2012
Final sign-off
Apr 19, 2012

revision to appl #2011.09.07.3971 - omission of posts & footings on ground level to be replaced with (1) lvl & (1) 4 x 12 df on 1st level.

Open the permit page

Feb 15, 2012Completed
final sign-off Jun 2012
936 Clayton StEastwood Development Incorporatedgarage:install new retaining wall and slab on grade.1st floor: remodel kitchen, demo urm chimney, new gas fireplace. 2nd floor:remodel master bath. 3rd floor: repair damaged wall framing, new sliding glass door, repair windows and extg siding, new roof deck, new bath.
Details
Permit
201202154198
Permit issued
Feb 16, 2012
Final sign-off
Jun 29, 2012

garage:install new retaining wall and slab on grade.1st floor: remodel kitchen, demo urm chimney, new gas fireplace. 2nd floor:remodel master bath. 3rd floor: repair damaged wall framing, new sliding glass door, repair windows and extg siding, new roof deck, new bath.

Open the permit page

$40,000
May 16, 2011Completed
final sign-off Jun 2011
522 07th AvEastwood Development Incorporatedremove/repair/replacement of rear stairs to comply with nov# 201033062
Details
Permit
201105166137
Permit issued
May 16, 2011
Final sign-off
Jun 7, 2011

remove/repair/replacement of rear stairs to comply with nov# 201033062

Open the permit page

$8,000
May 13, 2011Completed
final sign-off Oct 2011
724 Tennessee Streplacement of existing rear deck and stairs, in kind
Details
Permit
201105136009
Permit issued
Jun 14, 2011
Final sign-off
Oct 6, 2011

replacement of existing rear deck and stairs, in kind

Open the permit page

$8,000
Mar 9, 2011Completed
final sign-off Jul 2014
277 32nd AvKerley Construction Incadd garage to existing crawl space that is to be excavated to create the parking garage. the garage will be cntained wihtin the existing footprint. add curb cut. shoring under a separate permit.
Details
Permit
201103091688
Permit issued
Aug 21, 2013
Final sign-off
Jul 28, 2014

add garage to existing crawl space that is to be excavated to create the parking garage. the garage will be cntained wihtin the existing footprint. add curb cut. shoring under a separate permit.

Open the permit page

$40,000
Oct 12, 2010Completed
final sign-off Nov 2010
1665 17th AvEastwood Development Incorporatedreconstruct exterior rear deck. new siding. new deck 21x8, stairs 3'6" wide
Details
Permit
201010122672
Permit issued
Oct 13, 2010
Final sign-off
Nov 15, 2010

reconstruct exterior rear deck. new siding. new deck 21x8, stairs 3'6" wide

Open the permit page

$10,000