Permit GraphShortlistSan Francisco building permits since 2000

Block 3537, lot 065

58 Belcher St

The city’s assessor roll has no record for this parcel.

Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

11 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 30, 2015Completed
final sign-off Feb 2016
58 Belcher StEastwood Development Incorporatedto comply with physical inspection report #cc-7969.
Details
Permit
201512306203
Status
complete
Filed
Dec 30, 2015
Permit issued
Dec 30, 2015
Final sign-off
Feb 12, 2016
Declared cost
$1,000
Address
58 Belcher St

to comply with physical inspection report #cc-7969.

Open the permit page

$1,000
May 13, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedrevision to pa# 2013-0116-8086-legalize new garage door installed by previous owner at request of building inspector.
Details
Permit
201305136775
Status
complete
Filed
May 13, 2013
Permit issued
May 13, 2013
Final sign-off
May 15, 2013
Address
58 Belcher St

revision to pa# 2013-0116-8086-legalize new garage door installed by previous owner at request of building inspector.

Open the permit page

Feb 28, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedrevision to pa#2013-02-14-0203. install (n) 3 1/2 x 14 psl on top fl @ living room. strengthen roof framing w/ 4x4's @ roof above living room. (n) roof framing @ master bdrm installed by previous owner.
Details
Permit
201302281145
Status
complete
Filed
Feb 28, 2013
Permit issued
Feb 28, 2013
Final sign-off
May 15, 2013
Declared cost
$500
Address
58 Belcher St

revision to pa#2013-02-14-0203. install (n) 3 1/2 x 14 psl on top fl @ living room. strengthen roof framing w/ 4x4's @ roof above living room. (n) roof framing @ master bdrm installed by previous owner.

Open the permit page

$500
Feb 14, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedremodel ktichen & bathrooms @ 2nd floor.
Details
Permit
201302140203
Status
complete
Filed
Feb 14, 2013
Permit issued
Feb 14, 2013
Final sign-off
May 15, 2013
Declared cost
$30,000
Address
58 Belcher St

remodel ktichen & bathrooms @ 2nd floor.

Open the permit page

$30,000
Jan 16, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedremodel kitchen & baths, voluntary structural upgrades, add bedroom. relocate 1/2 bath convert to full bath. at master bath add bathtub.
Details
Permit
201301168086
Status
complete
Filed
Jan 16, 2013
Permit issued
Jan 18, 2013
Final sign-off
May 15, 2013
Declared cost
$20,000
Address
58 Belcher St

remodel kitchen & baths, voluntary structural upgrades, add bedroom. relocate 1/2 bath convert to full bath. at master bath add bathtub.

Open the permit page

$20,000
Jan 4, 2013Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporatedinfill light well at south elevation. add rear deck. remove spiral stair.
Details
Permit
201301047218
Status
complete
Filed
Jan 4, 2013
Permit issued
Jan 10, 2013
Final sign-off
May 15, 2013
Declared cost
$3,000
Address
58 Belcher St

infill light well at south elevation. add rear deck. remove spiral stair.

Open the permit page

$3,000
Dec 18, 2012Completed
final sign-off May 2013
58 Belcher StEastwood Development Incorporated1st floor: move existing wall to align with 2nd floor wall. infill light well at north elevation.
Details
Permit
201212186426
Status
complete
Filed
Dec 18, 2012
Permit issued
Dec 21, 2012
Final sign-off
May 15, 2013
Declared cost
$10,000
Address
58 Belcher St

1st floor: move existing wall to align with 2nd floor wall. infill light well at north elevation.

Open the permit page

$10,000
May 21, 2012Completed
final sign-off May 2013
58 Belcher Stto complete & finalize work approved under pa #201005182670.
Details
Permit
201205210910
Status
complete
Filed
May 21, 2012
Permit issued
May 21, 2012
Final sign-off
May 15, 2013
Declared cost
$85,000
Address
58 Belcher St

to complete & finalize work approved under pa #201005182670.

Open the permit page

$85,000
Jun 9, 2010Never finaled
issued Jun 2010, no final
58 Belcher Ststreet space permit
Details
Permit
M205646
Status
issued
Filed
Jun 9, 2010
Permit issued
Jun 9, 2010
Address
58 Belcher St

street space permit

Open the permit page

May 18, 2010Completed
final sign-off May 2013
58 Belcher St1st. flr. convert utility to living space. relocate (e) kit. & bath. add (n) 1/2 bath & laundry, move windows & 3-ext. doors @ side & rear. no visible from street. replace 2-(e) rear & side windows.
Details
Permit
201005182670
Status
complete
Filed
May 18, 2010
Permit issued
May 21, 2010
Final sign-off
May 15, 2013
Declared cost
$85,000
Address
58 Belcher St

1st. flr. convert utility to living space. relocate (e) kit. & bath. add (n) 1/2 bath & laundry, move windows & 3-ext. doors @ side & rear. no visible from street. replace 2-(e) rear & side windows.

Open the permit page

$85,000
Nov 5, 2007Never finaled
issued Nov 2007, no final
58 Belcher Ststreet space & sidewalk repair
Details
Permit
M94069
Status
issued
Filed
Nov 5, 2007
Permit issued
Nov 5, 2007
Address
58 Belcher St

street space & sidewalk repair

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Eastwood Development Incorporated (7)
Engineers
Christopher Durkin P.E. (2), Chris Durkin

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.