Charlie Stott
- Listed as
- architect
- Firm
- Stott Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Aug 2025
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2025 | Completed final sign-off Aug 2026 | 540 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openingsDetails
addition of showers at (e) accessible bathrooms located floors 2-5 at se corner of building. floors 3-5 showers will be made accessible. scope includes structrual adjustments to (e) wood shear walls to accommodate (n) shower entries/openings | $225,000 |
| Dec 22, 2021 | Completed final sign-off Jan 2022 | 540 Mission Bay Blvd North Bl | as built revision to pa 2019-1209-8992 for egress doors to comply with cbc section 1010.1.4.2 power operated doors. no change to cost of jobDetails
as built revision to pa 2019-1209-8992 for egress doors to comply with cbc section 1010.1.4.2 power operated doors. no change to cost of job | ||
| Dec 9, 2019 | Completed final sign-off Jan 2022 | 540 Mission Bay Blvd North Bl | addition of auto sliding door and floor finish upgrades at 1st fl. main entry of (e) building constructed in 2015Details
addition of auto sliding door and floor finish upgrades at 1st fl. main entry of (e) building constructed in 2015 | $9,500 | |
| Apr 4, 2018 | Completed final sign-off Sep 2018 | 32 Page St | Rcgc | remodel (e) 2nd floor break room kitchen with addition of electrical stove and mechanical exhaust to roofDetails
remodel (e) 2nd floor break room kitchen with addition of electrical stove and mechanical exhaust to roof | $31,000 |