Cesar Sifuentes
- Listed as
- architect, engineer
- Firm
- Cesar Sifuentes, S.E.
- Based in
- Concord
- On San Francisco permits
- Mar 2006 to Mar 2024
12 permits since 2000 (engineer on 11 permits, architect on 1 permit): 8 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 15, 2024 | Completed final sign-off Oct 2024 | 286 Upper Tr | revision 202308164514- to include new landing, and stairs with guardrails located at the rear of property.Details
revision 202308164514- to include new landing, and stairs with guardrails located at the rear of property. | $20,000 | |
| Jul 8, 2022 | Completed final sign-off Dec 2022 | 25 Elsie St | external staircase re-build in-kind.no change to (e) size and envelope. to comply w/ complaint 202292460.Details
external staircase re-build in-kind.no change to (e) size and envelope. to comply w/ complaint 202292460. | $10,000 | |
| Jan 19, 2021 | Never finaled issued Jun 2021, no final | 12 Longview Ct | Southface Construction Inc, I Pulido Construction | 3rd floor: (n) 385 sq ft wd deck over roof w/ new multi panel glazed doors & glass railing. abandon (e) gas fireplace flue. remodel kitchen & 2 bathrooms. construct (n) closets. (n) windows & doors at 3rd floor. (n) 163 sq ft family room, washer/dryer, & sink on 1st floor. install (n) natural gasDetails
3rd floor: (n) 385 sq ft wd deck over roof w/ new multi panel glazed doors & glass railing. abandon (e) gas fireplace flue. remodel kitchen & 2 bathrooms. construct (n) closets. (n) windows & doors at 3rd floor. (n) 163 sq ft family room, washer/dryer, & sink on 1st floor. install (n) natural gas | $287,000 |
| Oct 23, 2020 | Never finaled filed Oct 2020, never issued | 1 Longview Ct | construct (n) 392 sq ft studio w/workspace, laundry, bath, office & storage in (e) basement. construct (n) 232 sq ft deck at 2/f w/egress stair to rear yard. install 2 new windows & relocate door. reconfigure 2/f bath, install (n) counter at (e) kitchen, install g.w.b & (e) shelving at garage, (n)..Details
construct (n) 392 sq ft studio w/workspace, laundry, bath, office & storage in (e) basement. construct (n) 232 sq ft deck at 2/f w/egress stair to rear yard. install 2 new windows & relocate door. reconfigure 2/f bath, install (n) counter at (e) kitchen, install g.w.b & (e) shelving at garage, (n).. | $87,800 | |
| Apr 13, 2015 | Completed final sign-off Sep 2015 | 4100 20th St | Urban Builder General Contracting Inc | remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck.Details
remodel (e) kitchen, remodel (e) bathrom, add bathroom, replace (e) deck. | $150,000 |
| Sep 27, 2013 | Expired or cancelled cancelled Jan 2026 | 2685 30th Av | Advance Builders | (e) eprow to be winden from 12' to 16', new concrete surface to match existing approx. 200 sq.ft., new ac pavement to match existing approx. 150 sq.ft., modify sidewalk.Details
(e) eprow to be winden from 12' to 16', new concrete surface to match existing approx. 200 sq.ft., new ac pavement to match existing approx. 150 sq.ft., modify sidewalk. | $12,000 |
| Aug 17, 2012 | Completed final sign-off Aug 2012 | 6 Longview Ct | to comply w/complaint #201239461- construction of deck 4'x 14'-2" off bedroom, with sliding glass door for access.it has been inspected and approved by a licensed structural engineerDetails
to comply w/complaint #201239461- construction of deck 4'x 14'-2" off bedroom, with sliding glass door for access.it has been inspected and approved by a licensed structural engineer | $12,200 | |
| Aug 16, 2012 | Completed final sign-off Sep 2015 | 371 Coleridge St | construct (n) enclosed stair to connect all levels of this house, basement, 1st & 2nd fl. remove non-compliant circular stair & frame-in floor @ that location. construct half-bath, closets & connect stair to 2nd fl bedroom.Details
construct (n) enclosed stair to connect all levels of this house, basement, 1st & 2nd fl. remove non-compliant circular stair & frame-in floor @ that location. construct half-bath, closets & connect stair to 2nd fl bedroom. | $61,000 | |
| Oct 28, 2010 | Completed final sign-off Feb 2011 | 178 Holladay Av | Michael Connors | revision to pa# 2009.12.24.3864 for structural changes due to changes on site conditions shown as delta 5 , 10/8/2010Details
revision to pa# 2009.12.24.3864 for structural changes due to changes on site conditions shown as delta 5 , 10/8/2010 | $650 |
| Dec 24, 2009 | Completed final sign-off Feb 2011 | 178 Holladay Av | construct new 262 sq ft bedroom addition above e flat roof family room, reconfigure interior spaces including kitchen, replace e wd entry stair, replace windows and doors, enclose porch, new siding, interior stair, bathroom at 2nd fl, and rear stairDetails
construct new 262 sq ft bedroom addition above e flat roof family room, reconfigure interior spaces including kitchen, replace e wd entry stair, replace windows and doors, enclose porch, new siding, interior stair, bathroom at 2nd fl, and rear stair | $78,600 | |
| Dec 10, 2007 | Completed final sign-off Sep 2008 | 171 San Marcos Av | Allegrotti Construction Inc | remodel middle floor bathrooms, relocate basement bathroom, add rear deck and stairs and enhance foundation by installing helical piers. remodel basement family room, wet bar and laundry room.(*new deck is approx 52" above grade - less than 10'0".)Details
remodel middle floor bathrooms, relocate basement bathroom, add rear deck and stairs and enhance foundation by installing helical piers. remodel basement family room, wet bar and laundry room.(*new deck is approx 52" above grade - less than 10'0".) | $123,750 |
| Mar 23, 2006 | Never finaled issued Jun 2007, no final | 583 Lisbon St | horizontal addition to rear of home.Details
horizontal addition to rear of home. | $40,000 |