Uzziel Bahena
- Listed as
- authorized agent-others, contractor
- Firm
- Ubr Construction & Roofing Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Apr 2025
94 permits since 2000 (contractor on 94 permits, authorized agent-others on 3 permits): 91 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2025 | Completed final sign-off Dec 2025 | 198 Park St | Ubr Construction & Roofing Inc, Rapid Flow Plumbing & Rooter Inc | interior remodel of 1st floor adding a (n) bathroom , mudroom, to the garage entry and remodel the staircase. no change to the 2nd floor all interior scopeDetails
interior remodel of 1st floor adding a (n) bathroom , mudroom, to the garage entry and remodel the staircase. no change to the 2nd floor all interior scope | $80,000 |
| Apr 10, 2024 | Completed final sign-off Apr 2024 | 38 Pearl St | Ubr Construction & Roofing Inc | reroofing, tear off, flat modified bitumen roofDetails
reroofing, tear off, flat modified bitumen roof | $12,000 |
| Apr 8, 2024 | Completed final sign-off Apr 2024 | 640 04th Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $27,000 |
| Apr 4, 2024 | Completed final sign-off Aug 2024 | 25 Sierra St | Ubr Construction & Roofing Inc | 2nd level flex room expansion and adding a closet. all interior scope.Details
2nd level flex room expansion and adding a closet. all interior scope. | $25,000 |
| Mar 19, 2024 | Completed final sign-off Apr 2024 | 1144 Anza St | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $21,000 |
| Mar 13, 2024 | In progress filed Mar 2024, not yet issued | 186 Liberty St | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $26,000 |
| Feb 21, 2024 | Completed final sign-off Mar 2024 | 2659 39th Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $13,000 |
| Feb 6, 2024 | Completed final sign-off May 2024 | 89 Martha Av | Ubr Construction & Roofing Inc | remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for likeDetails
remodel of kitchen and 2 full bathrooms and 2 half bathrooms. like for like | $25,000 |
| Dec 6, 2023 | Completed final sign-off Feb 2024 | 2002 Quesada Av | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $27,500 |
| Dec 6, 2023 | Completed final sign-off Feb 2024 | 2820 Fulton St | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $16,500 |
| Dec 6, 2023 | Completed final sign-off Feb 2024 | 277 Stratford Dr | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $21,500 |
| Oct 24, 2023 | Completed final sign-off Nov 2023 | 2775 Golden Gate Av | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $15,600 |
| Oct 16, 2023 | Completed final sign-off Oct 2023 | 497 Belvedere St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $19,000 |
| Oct 3, 2023 | Completed final sign-off Oct 2023 | 482 Vienna St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Sep 7, 2023 | Completed final sign-off Sep 2023 | 258 Edinburgh St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $10,800 |
| Aug 29, 2023 | Completed final sign-off Sep 2023 | 1709 Ulloa St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $18,000 |
| Aug 3, 2023 | Completed final sign-off Feb 2024 | 353 Mangels Av | Level 21 Construction Company, Ubr Construction & Roofing Inc | interior renovation of 1st fl: adding a mudroom to entry. renovating the master bedroom & master bath. no changes to 2nd fl. all interior workDetails
interior renovation of 1st fl: adding a mudroom to entry. renovating the master bedroom & master bath. no changes to 2nd fl. all interior work | $40,000 |
| Aug 2, 2023 | Completed final sign-off Jan 2024 | 701 Congo St | Ubr Construction & Roofing Inc | reinforce existing retaining wall at backyard. (installation of new retaining wall parallel at existing retaining wall) all work in the back of building.Details
reinforce existing retaining wall at backyard. (installation of new retaining wall parallel at existing retaining wall) all work in the back of building. | $20,000 |
| Jul 18, 2023 | Completed final sign-off Aug 2023 | 1442 26th Av | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $15,000 |
| Jul 12, 2023 | Completed final sign-off Aug 2023 | 1101 Taraval St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $45,000 |
| May 30, 2023 | Completed final sign-off Jun 2023 | 742 Holloway Av | Ubr Construction & Roofing Inc | reroof. tear off modified bitumen roofDetails
reroof. tear off modified bitumen roof | $16,000 |
| May 24, 2023 | Completed final sign-off Jun 2023 | 60 Brentwood Av | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $19,000 |
| May 17, 2023 | Completed final sign-off Aug 2023 | 1533 Sutter St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $40,000 |
| May 17, 2023 | Completed final sign-off Jun 2023 | 4138 Geary Bl | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $16,000 |
| May 11, 2023 | Completed final sign-off Sep 2024 | 223 Laussat St | Ubr Construction & Roofing Inc | rear yard exterior deck to be replaced. rear yard exterior linear stair to be replaced with a u-turn stair. water feature to be added to the rear yard. proposed work to remove and replace posts and supporting beams along grid line 2. rear yard scope only. no changes to the interior.Details
rear yard exterior deck to be replaced. rear yard exterior linear stair to be replaced with a u-turn stair. water feature to be added to the rear yard. proposed work to remove and replace posts and supporting beams along grid line 2. rear yard scope only. no changes to the interior. | $25,000 |
| Apr 7, 2023 | Completed final sign-off May 2023 | 1145 Munich St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,500 |
| Feb 13, 2023 | Completed final sign-off Mar 2023 | 455 Bartlett St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $16,000 |
| Feb 2, 2023 | Completed final sign-off Apr 2024 | 223 Laussat St | Ubr Construction & Roofing Inc | interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level.Details
interior renovation of (e) kitchen and bathroom on main floor, bathroom addition on basement level. | $200,000 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 701 Congo St | Ubr Construction & Roofing Inc | revision to bpa#202207229102, remove hot tub from scope of workDetails
revision to bpa#202207229102, remove hot tub from scope of work | |
| Dec 15, 2022 | Completed final sign-off Dec 2022 | 145 Lower Tr | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $19,500 |
| Dec 6, 2022 | Completed final sign-off Dec 2022 | 191 Judson Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $13,000 |
| Nov 16, 2022 | Completed final sign-off Dec 2022 | 15 Mabrey Ct | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Nov 16, 2022 | Completed final sign-off Nov 2022 | 263 Edinburgh St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Oct 25, 2022 | Completed final sign-off Nov 2022 | 3171 Cesar Chavez St | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $16,000 |
| Oct 4, 2022 | Completed final sign-off Oct 2022 | 107 Delano Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $16,000 |
| Sep 20, 2022 | Completed final sign-off Jul 2023 | 2601 17th Av | Ubr Construction & Roofing Inc | correctin for noitce of 201494501. memoralize existing conditions. to comply w/his/nov 201494501. add 22 sf. legalize work preformed w/o permit: convert (e) social rm to family rm & bedroomDetails
correctin for noitce of 201494501. memoralize existing conditions. to comply w/his/nov 201494501. add 22 sf. legalize work preformed w/o permit: convert (e) social rm to family rm & bedroom | |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 800 Kirkham St | Ubr Construction & Roofing Inc | install copper gutter 150 sqft 3 sides- all within prop. linesDetails
install copper gutter 150 sqft 3 sides- all within prop. lines | $3,000 |
| Sep 12, 2022 | Completed final sign-off Oct 2022 | 800 Kirkham St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $22,000 |
| Aug 4, 2022 | Completed final sign-off Oct 2023 | 75 Park Hill Av | Ubr Construction & Roofing Inc | remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor.Details
remodel existing one bathroom, kitchen and laundry . add 1 new bathroom. all interior scope on second floor. | $100,000 |
| Aug 4, 2022 | Completed final sign-off Aug 2022 | 15 Woodland Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $30,000 |
| Jul 22, 2022 | Completed final sign-off Mar 2023 | 701 Congo St | Ubr Construction & Roofing Inc, Hcg Associates Inc | enlarge upper deck to fill space to neighbor. add a hot tub.Details
enlarge upper deck to fill space to neighbor. add a hot tub. | $20,000 |
| Jul 8, 2022 | Completed final sign-off Jul 2022 | 731 Commercial St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $38,000 |
| Jun 24, 2022 | Completed final sign-off Jun 2022 | 1390 Hampshire St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $14,000 |
| Jun 15, 2022 | Completed final sign-off Sep 2022 | 682 09th Av | Ubr Construction & Roofing Inc | kitchen remodeling, like for like. removal extg kitchen. installation on a new kitchen cabnets and appliances. upgrade electrical system by code and plumbing systemDetails
kitchen remodeling, like for like. removal extg kitchen. installation on a new kitchen cabnets and appliances. upgrade electrical system by code and plumbing system | $29,000 |
| Apr 11, 2022 | Completed final sign-off Jun 2022 | 135 Turquoise Wy | Ubr Construction & Roofing Inc | remodeling 3 bathroom, 2 bull bathroom, 1 half bath. replacement of plumbing & electrical fixtures at some areas. new tile.Details
remodeling 3 bathroom, 2 bull bathroom, 1 half bath. replacement of plumbing & electrical fixtures at some areas. new tile. | $33,000 |
| Feb 18, 2022 | Completed final sign-off Apr 2022 | 3042 Market St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $30,000 |
| Feb 11, 2022 | Completed final sign-off May 2022 | 61 Gates St | Ubr Construction & Roofing Inc | bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures)Details
bathroom fixtures replacing (remodeling) kitchen remodeling (replacement cabinet fixtures) | $35,000 |
| Jan 20, 2022 | Completed final sign-off Jun 2022 | 3466 17th St | Ubr Construction & Roofing Inc | all interior scope. master bedroom to be renovated. new closets and a master bathroom addition.Details
all interior scope. master bedroom to be renovated. new closets and a master bathroom addition. | $45,800 |
| Oct 25, 2021 | Completed final sign-off Nov 2021 | 216 Joost Av | Ubr Construction & Roofing Inc | kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984.Details
kitchen counter top, sink, and fixtures replacement. retile two bathrooms. replace two toilets & two sinks to comply with nov 202183477 & correct nov 202182984. | $2,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2021 | 442 Los Palmos Dr | Ubr Construction & Roofing Inc | one full bathroom remodeling. replacement of tile, tub, shower pan.Details
one full bathroom remodeling. replacement of tile, tub, shower pan. | $12,000 |
| Oct 7, 2021 | Completed final sign-off Oct 2021 | 65 Oneida Av | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $10,000 |
| Sep 9, 2021 | Completed final sign-off Sep 2021 | 1153 Capp St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $8,000 |
| May 26, 2021 | Completed final sign-off Jun 2021 | 37 Turquoise Wy | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $14,000 |
| May 12, 2021 | Completed final sign-off Aug 2021 | 35 Zampa Ln | Ubr Construction & Roofing Inc | replace k itchen cabinets, 1 kitchen. replace appliances. replace gfci outlets. 2 light fixtures. non structuralDetails
replace k itchen cabinets, 1 kitchen. replace appliances. replace gfci outlets. 2 light fixtures. non structural | $12,000 |
| May 7, 2021 | Completed final sign-off May 2021 | 33 Turquoise Wy | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $14,000 |
| Feb 22, 2021 | Completed final sign-off Mar 2021 | 18 Heyman Av | Ubr Construction & Roofing Inc | repair siding in kind.back yard.Details
repair siding in kind.back yard. | $1,000 |
| Feb 1, 2021 | Completed final sign-off Aug 2021 | 133 Baden St | Ubr Construction & Roofing Inc | add 1 bathroom in (e) storage space next to garage on 1st fl.Details
add 1 bathroom in (e) storage space next to garage on 1st fl. | $5,000 |
| Jan 19, 2021 | Completed final sign-off Jan 2021 | 172 Caine Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2021 | 2612 Folsom St | Ubr Construction & Roofing Inc | comply with complaint 202062931. replace dryrot t1-11 siding , vinyl siding, water deck 4x10. remove damaged sheetrock at unit 4. kitchen and back porchDetails
comply with complaint 202062931. replace dryrot t1-11 siding , vinyl siding, water deck 4x10. remove damaged sheetrock at unit 4. kitchen and back porch | $10,000 |
| Nov 10, 2020 | Expired or cancelled cancelled Jan 2026 | 38 Curtis St | Ubr Construction & Roofing Inc | reroofing: install shingle on top of 2-layer.Details
reroofing: install shingle on top of 2-layer. | $7,000 |
| Oct 30, 2020 | Completed final sign-off Nov 2020 | 1021 Florida St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $11,800 |
| Sep 28, 2020 | Completed final sign-off Oct 2020 | 1258 Vermont St | Ubr Construction & Roofing Inc | reroofing.Details
reroofing. | $11,000 |
| Aug 8, 2020 | Completed final sign-off Jan 2022 | 102 San Jose Av | Ubr Construction & Roofing Inc | revision to previously submitted permit #2017/0206/8659 to memoralize existing conditions & strenghten existing framing.Details
revision to previously submitted permit #2017/0206/8659 to memoralize existing conditions & strenghten existing framing. | $10,000 |
| Aug 7, 2020 | Completed final sign-off Dec 2020 | 439 Burnett Av | Ubr Construction & Roofing Inc | reroofing - tear off and install aluminum shingles. (permit excluding rough carpentry work)Details
reroofing - tear off and install aluminum shingles. (permit excluding rough carpentry work) | $35,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 198 Naples St | Ubr Construction & Roofing Inc | install scaffolds and repair the stucco on wall 25x25Details
install scaffolds and repair the stucco on wall 25x25 | $2,800 |
| Jun 10, 2020 | Completed final sign-off Jul 2020 | 2325 Pine St | Ubr Construction & Roofing Inc | reroofing in-kind, not visible from street.Details
reroofing in-kind, not visible from street. | $12,000 |
| Feb 10, 2020 | Completed final sign-off Feb 2020 | 469 Diamond St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $7,500 |
| Feb 10, 2020 | Completed final sign-off Feb 2020 | 465 Diamond St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $2,500 |
| Jan 31, 2020 | Completed final sign-off Feb 2020 | 160 Marview Wy | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $9,500 |
| Jan 21, 2020 | Completed final sign-off Feb 2020 | 9 Heyman Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $9,000 |
| Jan 14, 2020 | Completed final sign-off Jan 2020 | 371 Jules Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $10,000 |
| Jan 7, 2020 | Completed final sign-off Jan 2020 | 50 Clayton St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $11,500 |
| Jan 6, 2020 | Completed final sign-off Jan 2020 | 658 San Jose Av | Ubr Construction & Roofing Inc | reroofing.Details
reroofing. | $12,000 |
| Nov 8, 2019 | Completed final sign-off Nov 2019 | 812 34th Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $8,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 1317 Hyde St | Ubr Construction & Roofing Inc | apt 5: bathroom: remodeling of (e) shower & sink (replacement) installation new tile & shower pan. installationg new fan & ilght. same szie & same location.Details
apt 5: bathroom: remodeling of (e) shower & sink (replacement) installation new tile & shower pan. installationg new fan & ilght. same szie & same location. | $8,000 |
| Sep 5, 2019 | Completed final sign-off Sep 2019 | 10 Rio Verde St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $8,000 |
| Sep 5, 2019 | Completed final sign-off Oct 2019 | 62 Tioga Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $9,500 |
| Jul 10, 2019 | Completed final sign-off Sep 2019 | 4600 18th St | Ubr Construction & Roofing Inc | replace roof w/50-year shingles. no change to roofline, façade or appearance. no other work.Details
replace roof w/50-year shingles. no change to roofline, façade or appearance. no other work. | $23,000 |
| Jun 18, 2019 | Completed final sign-off Mar 2020 | 344 Ellis St | Ubr Construction & Roofing Inc | unit# 3: remodel bathroom: replace shower; sink; tile at same location. all work in unit # 3. to comply with complaint # 2019588111Details
unit# 3: remodel bathroom: replace shower; sink; tile at same location. all work in unit # 3. to comply with complaint # 2019588111 | $14,200 |
| Apr 23, 2019 | Completed final sign-off May 2019 | 246 Edinburgh St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Apr 3, 2019 | Completed final sign-off Apr 2019 | 2619 24th St | Ubr Construction & Roofing Inc | re-roofingDetails
re-roofing | $7,000 |
| Mar 29, 2019 | Completed final sign-off May 2019 | 1188 Valencia St | Ubr Construction & Roofing Inc | (e) tub replacement for shower unit.Details
(e) tub replacement for shower unit. | $4,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2019 | 72 Harrington St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $8,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1260 Clay St | Ubr Construction & Roofing Inc | full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work.Details
full bathroom remodeling. change all bathroom, fixtures & tile/replacement tub for shower all at same place. full kitchen remodeling. keep same location of all app. replacing in kind, no structural work. | $28,000 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 92 Winfield St | Ubr Construction & Roofing Inc | reroofing.Details
reroofing. | $7,000 |
| Oct 3, 2018 | Completed final sign-off Oct 2018 | 1947 Filbert St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2018 | 1793 Mcallister St | Ubr Construction & Roofing Inc | add washer and dryer in both unitsDetails
add washer and dryer in both units | $4,500 |
| Aug 8, 2018 | Completed final sign-off Oct 2018 | 2601 17th Av | Ubr Construction & Roofing Inc | remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures.Details
remodel bathroom and kitchen, replace kitchen cabinets and appliances, replace bathroom floor, tile, and fixtures. | $20,000 |
| Jul 10, 2018 | Completed final sign-off Jul 2018 | 1570 26th Av | Ubr Construction & Roofing Inc | Details
| $10,000 |
| Jul 3, 2018 | Completed final sign-off Aug 2018 | 2154 Market St | Ubr Construction & Roofing Inc | full bathroom remodeling: r/r all plumbing & electrical fixtures. installation of new plumbing & electrical fixtures.Details
full bathroom remodeling: r/r all plumbing & electrical fixtures. installation of new plumbing & electrical fixtures. | $14,500 |
| Jun 26, 2018 | Completed final sign-off Jul 2018 | 1939 Taraval St | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $12,000 |
| Jun 26, 2018 | Completed final sign-off Jul 2018 | 1342 28th Av | Ubr Construction & Roofing Inc | replace existing flat roof with new modified bitumen roofing. approved otc.Details
replace existing flat roof with new modified bitumen roofing. approved otc. | $10,000 |
| May 30, 2018 | Completed final sign-off Jun 2018 | 1243 09th Av | Ubr Construction & Roofing Inc | reroofingDetails
reroofing | $18,000 |
| Feb 6, 2017 | Completed final sign-off Jan 2022 | 102 San Jose Av | Ubr Construction & Roofing Inc | adu. rear building garage/shed located in rear yard to be turned into an adu single family dwelling per ordinance 162-16Details
adu. rear building garage/shed located in rear yard to be turned into an adu single family dwelling per ordinance 162-16 | $35,000 |