Carlos Aguirre
- Listed as
- contractor, designer, subcontractor
- Firm
- All Bay Solar
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Aug 2026
117 permits since 2000 (contractor on 116 permits, designer on 1 permit, subcontractor on 1 permit): 102 completed, 7 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 117.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 1035 Baker St | All Bay Solar | solar permit: installing 8 solar pv modules, 440 watts per module, total no. of rating 3.52 kw. mounted: roof, ballasted: n | pv solar roof mount 8 panels 3.52 kw dcDetails
solar permit: installing 8 solar pv modules, 440 watts per module, total no. of rating 3.52 kw. mounted: roof, ballasted: n | pv solar roof mount 8 panels 3.52 kw dc | $5,000 |
| Jun 1, 2026 | Completed final sign-off Jun 2026 | 2008 15th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,500 |
| May 21, 2026 | In progress issued Aug 2026 | 63 Whitney St | All Bay Solar | solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | adding a 13.5kwh expansion pack to existing energy storage and solar system.Details
solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | adding a 13.5kwh expansion pack to existing energy storage and solar system. | |
| May 19, 2026 | Completed final sign-off Jun 2026 | 142 Chilton Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,900 |
| May 8, 2026 | Completed final sign-off Jun 2026 | 628 29th St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $3,641 |
| Apr 20, 2026 | In progress issued May 2026 | 10 Seacliff Av | All Bay Solar | solar permit: installing 29 solar pv modules, 415 watts per module, total no. of rating 12.035 kw. mounted: roof, ballasted: n, including 4 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | pv solar roof mount 29 panels 12.035Details
solar permit: installing 29 solar pv modules, 415 watts per module, total no. of rating 12.035 kw. mounted: roof, ballasted: n, including 4 energy storage unit, with 13.5 kwh each in capacity, ess units will be closer than 3 feet | pv solar roof mount 29 panels 12.035 | $35,000 |
| Feb 26, 2026 | Completed final sign-off Mar 2026 | 1850 39th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,900 |
| Feb 18, 2026 | In progress issued Mar 2026 | 643 43rd Av | All Bay Solar | solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | -install (1) automatic franklin transfer switch agate -install (1) franklin apower2 battery 15 kwh -instaDetails
solar permit: mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | -install (1) automatic franklin transfer switch agate -install (1) franklin apower2 battery 15 kwh -insta | $20,000 |
| Jan 30, 2026 | In progress issued Feb 2026 | 56 Conrad St | All Bay Solar | solar permit: installing 16 solar pv modules, 430 watts per module, total no. of rating 6.88 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | installing (16) 430w modDetails
solar permit: installing 16 solar pv modules, 430 watts per module, total no. of rating 6.88 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 15 kwh each in capacity, ess units will not be closer than 3 feet | installing (16) 430w mod | $26,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 5415 Anza St | All Bay Solar | solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | (1) ess 10 kwh batteryDetails
solar permit: ballasted: n, including 1 energy storage unit, of 240 vac, with 10 kwh each in capacity, ess units will not be closer than 3 feet | (1) ess 10 kwh battery | |
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 228 Ewing Tr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 787 46th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,800 |
| Sep 17, 2025 | Completed final sign-off Sep 2025 | 4826 Anza St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,600 |
| Aug 25, 2025 | Completed final sign-off Feb 2026 | 1587 11th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| Aug 18, 2025 | Completed final sign-off Feb 2026 | 136 Cambridge St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,990 |
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 4373 Cesar Chavez St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,400 |
| Aug 18, 2025 | Completed final sign-off Feb 2026 | 666 Cayuga Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,900 |
| Aug 13, 2025 | Completed final sign-off Aug 2025 | 582 30th St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,250 |
| Jun 16, 2025 | Completed final sign-off Feb 2026 | 163 Mendosa Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,500 |
| May 27, 2025 | In progress issued May 2025 | 582 30th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Mar 27, 2025 | Completed final sign-off Feb 2026 | 723 16th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,000 |
| Mar 27, 2025 | Completed final sign-off Apr 2025 | 839 Wisconsin St | All Bay Solar | re-roofing with hot works.Details
re-roofing with hot works. | $16,000 |
| Feb 18, 2025 | Completed final sign-off Jun 2025 | 222 Faxon Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $4,800 |
| Feb 12, 2025 | Completed final sign-off Apr 2025 | 3040 25th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,000 |
| Jan 28, 2025 | Completed final sign-off Feb 2026 | 326 Prague St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,900 |
| Jan 17, 2025 | Completed final sign-off Feb 2025 | 95 Beachmont Dr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $27,000 |
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 5747 Mission St | All Bay Solar | revision to 202411124832. replace a window in bathroom, like for like. window not visible from stDetails
revision to 202411124832. replace a window in bathroom, like for like. window not visible from st | $300 |
| Dec 20, 2024 | Completed final sign-off Jan 2025 | 5747 Mission St | All Bay Solar | roof/repair at the bottom of a 4'x4'lightwell as requested by dbi field inspector.Details
roof/repair at the bottom of a 4'x4'lightwell as requested by dbi field inspector. | $500 |
| Dec 18, 2024 | Completed final sign-off Jan 2025 | 201 Gellert Dr | All Bay Solar | revision to pa # 202408027803: installing a new roof mounted solar system 5.67kw (14) 405 w modules. revised application for changes made in the single line diagram.Details
revision to pa # 202408027803: installing a new roof mounted solar system 5.67kw (14) 405 w modules. revised application for changes made in the single line diagram. | |
| Dec 17, 2024 | Completed final sign-off May 2025 | 118 Saturn St | All Bay Solar | rev pa 202405152137: change single line to connect to 100a service and relocate the batteries. install 1 automatic franklin transfer switch agate. install 2 franklin apower 13.6kwh usable capacity, total capacity 27.2 kwh battery system. install 1 100a batteries subpanelDetails
rev pa 202405152137: change single line to connect to 100a service and relocate the batteries. install 1 automatic franklin transfer switch agate. install 2 franklin apower 13.6kwh usable capacity, total capacity 27.2 kwh battery system. install 1 100a batteries subpanel | |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 5747 Mission St | All Bay Solar | rennovate bathroom - like for like, no wall construction or demolition, no change in plumbing fixture count.Details
rennovate bathroom - like for like, no wall construction or demolition, no change in plumbing fixture count. | $10,000 |
| Nov 11, 2024 | Completed final sign-off Dec 2024 | 139 Prague St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,400 |
| Oct 22, 2024 | Completed final sign-off Nov 2024 | 554 35th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,300 |
| Sep 27, 2024 | Completed final sign-off Oct 2024 | 566 24th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,500 |
| Sep 9, 2024 | Completed final sign-off Sep 2024 | 985 Church St | All Bay Solar | reroofingDetails
reroofing | $17,000 |
| Aug 30, 2024 | Completed final sign-off Feb 2026 | 850 30th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,750 |
| Aug 15, 2024 | Expired or cancelled expired Feb 2026 | 1974 33rd Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| Aug 13, 2024 | Completed final sign-off Jan 2025 | 201 Gellert Dr | All Bay Solar | install new roof mounted solar system 5.67kw (14 panels) 405 watt modules. ref pa# 202202178257.Details
install new roof mounted solar system 5.67kw (14 panels) 405 watt modules. ref pa# 202202178257. | $15,000 |
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 450 Urbano Dr | All Bay Solar | reroofingDetails
reroofing | $12,500 |
| Jul 25, 2024 | Completed final sign-off Oct 2024 | 2118 Noriega St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| May 31, 2024 | Completed final sign-off Jun 2024 | 731 Avalon Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,500 |
| May 30, 2024 | Completed final sign-off May 2025 | 118 Saturn St | All Bay Solar | installation of 1-200a franklin agate transfer switch, 2-franklin apower 13.6kw battery (27.2kw total), 1-100a batteries sub panel.Details
installation of 1-200a franklin agate transfer switch, 2-franklin apower 13.6kw battery (27.2kw total), 1-100a batteries sub panel. | $20,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 438 44th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,900 |
| May 21, 2024 | Completed final sign-off Oct 2024 | 1534 39th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| May 14, 2024 | Completed final sign-off Sep 2024 | 192 Valley St | All Bay Solar | reroofingDetails
reroofing | $14,000 |
| May 14, 2024 | Completed final sign-off Aug 2024 | 110 Lundys Ln | All Bay Solar | reroofingDetails
reroofing | $10,000 |
| May 14, 2024 | Completed final sign-off May 2024 | 1431 Dolores St | All Bay Solar | reroofingDetails
reroofing | $11,000 |
| Apr 29, 2024 | Expired or cancelled withdrawn Jun 2024 | 745 Victoria St | All Bay Solar | installing 200a franklin agate/transfer switch.installing 2 franklin apower 13.6kw batteries (27.2 total).installing 10.625kw (25xqtr425) roof mounted pv system.Details
installing 200a franklin agate/transfer switch.installing 2 franklin apower 13.6kw batteries (27.2 total).installing 10.625kw (25xqtr425) roof mounted pv system. | $35,000 |
| Apr 2, 2024 | Completed final sign-off Feb 2026 | 643 43rd Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $29,000 |
| Apr 2, 2024 | Completed final sign-off May 2024 | 80 Burlwood Dr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,950 |
| Feb 21, 2024 | Completed final sign-off Oct 2024 | 71 Panorama Dr | All Bay Solar | adding a 13.5kw tesla powerwall to an (e) pv / 1 powerwall system. total ess 27kwh. add 1 gen subpanel. adding 100a disconnect.Details
adding a 13.5kw tesla powerwall to an (e) pv / 1 powerwall system. total ess 27kwh. add 1 gen subpanel. adding 100a disconnect. | $12,500 |
| Feb 21, 2024 | Completed final sign-off Jul 2024 | 1174 Munich St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Feb 21, 2024 | Completed final sign-off Aug 2024 | 3045 24th Av | All Bay Solar | installing (1) 125a back up loads panel. installing (2) franklin apower 15kw ess for whole home back up 30kw total(27.2kw useable) installing a roof mounted pv system 8.2kw (20)410w modules. installingDetails
installing (1) 125a back up loads panel. installing (2) franklin apower 15kw ess for whole home back up 30kw total(27.2kw useable) installing a roof mounted pv system 8.2kw (20)410w modules. installing | $55,000 |
| Feb 20, 2024 | Completed final sign-off Aug 2024 | 345 Ewing Tr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,950 |
| Feb 20, 2024 | Completed final sign-off Mar 2024 | 1150 Sloat Bl | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,000 |
| Feb 13, 2024 | Completed final sign-off Mar 2024 | 140 Palo Alto Av | All Bay Solar | reroofingDetails
reroofing | $27,000 |
| Jan 23, 2024 | Completed final sign-off May 2024 | 4516 20th St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,900 |
| Jan 19, 2024 | Completed final sign-off Aug 2024 | 3045 24th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $23,000 |
| Jan 19, 2024 | Completed final sign-off Jan 2024 | 336 Banks St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| Jan 19, 2024 | Completed final sign-off May 2024 | 1527 38th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $28,000 |
| Dec 18, 2023 | Completed final sign-off Mar 2024 | 3000 23rd Av | All Bay Solar | re-roofingDetails
re-roofing | $15,000 |
| Dec 18, 2023 | Completed final sign-off Dec 2023 | 1567 Union St | All Bay Solar | re-roofingDetails
re-roofing | $18,000 |
| Dec 18, 2023 | Completed final sign-off Dec 2023 | 950 Wisconsin St | All Bay Solar | re-roofingDetails
re-roofing | $18,000 |
| Nov 16, 2023 | Expired or cancelled cancelled Nov 2023 | 823 York St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,000 |
| Oct 27, 2023 | Completed final sign-off Apr 2024 | 823 York St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,000 |
| Oct 27, 2023 | Completed final sign-off Nov 2023 | 1 Melba Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,500 |
| Jul 19, 2023 | Completed final sign-off Jul 2023 | 35 Delano Av | All Bay Solar | reroofingDetails
reroofing | $21,000 |
| Jul 5, 2023 | Completed final sign-off Feb 2024 | 140 Palo Alto Av | All Bay Solar | installing a 20kwh of usable storage energy (21 kwhs total) to an existing solar system 2 enphase encharge 10 batterties (on building exterior), 1 enphase enpower iq controller, 1 200a backup loads subpanel.Details
installing a 20kwh of usable storage energy (21 kwhs total) to an existing solar system 2 enphase encharge 10 batterties (on building exterior), 1 enphase enpower iq controller, 1 200a backup loads subpanel. | $15,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2023 | 4331 19th St | All Bay Solar | reroofingDetails
reroofing | $19,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2023 | 1578 47th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| May 16, 2023 | Expired or cancelled cancelled Feb 2024 | 240 Palo Alto Av | All Bay Solar | reroofingDetails
reroofing | $27,000 |
| Apr 28, 2023 | Completed final sign-off May 2023 | 74 Rosenkranz St | All Bay Solar | reroofing: no change to sheathing , 1-layer of gta modified bitumenDetails
reroofing: no change to sheathing , 1-layer of gta modified bitumen | $24,000 |
| Mar 20, 2023 | Completed final sign-off Apr 2024 | 59 Saint Germain Av | All Bay Solar | installing a 20kw (2 ess units) enphase energy storage system in garage with heat alarms & bollards to an existing solar system that is on a different permit.Details
installing a 20kw (2 ess units) enphase energy storage system in garage with heat alarms & bollards to an existing solar system that is on a different permit. | $20,000 |
| Mar 17, 2023 | Completed final sign-off Jun 2023 | 2255 44th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Mar 17, 2023 | Completed final sign-off Oct 2023 | 88 Bernal Heights Bl | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,000 |
| Mar 17, 2023 | Completed final sign-off Aug 2024 | 10 Brewster St | Lee Family Corp, All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $9,000 |
| Feb 20, 2023 | Completed final sign-off Apr 2023 | 634 12th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Feb 20, 2023 | Completed final sign-off Jul 2023 | 1874 San Jose Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Feb 10, 2023 | Completed final sign-off Apr 2023 | 2619 Baker St | All Bay Solar | reroofingDetails
reroofing | $17,000 |
| Jan 30, 2023 | Completed final sign-off Feb 2023 | 4218 25th St | All Bay Solar | reroofingDetails
reroofing | $29,000 |
| Jan 30, 2023 | Completed final sign-off Feb 2023 | 207 Faxon Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Jan 6, 2023 | Never finaled issued Jan 2023, no final | 707 Faxon Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Jan 6, 2023 | Completed final sign-off Sep 2023 | 515 Los Palmos Dr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Nov 22, 2022 | Completed final sign-off Dec 2022 | 201 Berkeley Wy | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Nov 4, 2022 | Completed final sign-off Jun 2024 | 805 Clayton St | All Bay Solar | installing (2) encharge e10 (20kwh usable energy ess system) in garage - roof mounted 9.6kw (24) 400w with (24) iq8 plus microinverters installed under separate electrical permitDetails
installing (2) encharge e10 (20kwh usable energy ess system) in garage - roof mounted 9.6kw (24) 400w with (24) iq8 plus microinverters installed under separate electrical permit | $30,000 |
| Sep 20, 2022 | Completed final sign-off Apr 2023 | 546 Arlington St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $10,000 |
| Aug 15, 2022 | Completed final sign-off Aug 2022 | 146 07th Av | All Bay Solar | reroofingDetails
reroofing | $1,200 |
| Aug 15, 2022 | Completed final sign-off Oct 2022 | 25 Virginia Av | All Bay Solar | reroofingDetails
reroofing | $20,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 2087 46th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $11,000 |
| Jun 13, 2022 | Completed final sign-off Aug 2022 | 66 Crestlake Dr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| May 10, 2022 | Completed final sign-off Jul 2022 | 164 Midcrest Wy | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| May 9, 2022 | Never finaled filed May 2022, never issued | 23 Baker St | All Bay Solar | adding a 13 kw sunpower sun vault system to an (e) 13kw ess system. totaling to a 26 kw battery system.Details
adding a 13 kw sunpower sun vault system to an (e) 13kw ess system. totaling to a 26 kw battery system. | $10,000 |
| Apr 11, 2022 | Completed final sign-off Apr 2022 | 2708 36th Av | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Mar 14, 2022 | Completed final sign-off Apr 2022 | 2445 Yorba St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Jan 25, 2022 | Completed final sign-off Mar 2022 | 3884 17th St | All Bay Solar | reroofingDetails
reroofing | $19,000 |
| Dec 4, 2021 | Completed final sign-off Mar 2022 | 1825 Church St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| Nov 3, 2021 | Completed final sign-off Sep 2022 | 569 Oak Park Dr | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,000 |
| Nov 2, 2021 | Completed final sign-off Mar 2024 | 250 Kenwood Wy | Swell Services Inc Dba Swell Contractors | add tesla battery pack and advanced 13.5 kw tesla powerwall 2 in garage; ac battery system 5kw. total after addition: 27kwh (28 kwh total energy); add interconnected heat alarms (1) above ess & (1) inside dwelling unitDetails
add tesla battery pack and advanced 13.5 kw tesla powerwall 2 in garage; ac battery system 5kw. total after addition: 27kwh (28 kwh total energy); add interconnected heat alarms (1) above ess & (1) inside dwelling unit | $10,799 |
| Oct 27, 2021 | Never finaled filed Oct 2021, never issued | 331 Arlington St | All Bay Solar | installing 26kwh battery system. (2) sunpower sunvault 13kwh batteries inside of the garage.Details
installing 26kwh battery system. (2) sunpower sunvault 13kwh batteries inside of the garage. | $20,000 |
| Sep 14, 2021 | Completed final sign-off Sep 2023 | 2085 Ulloa St | All Bay Solar | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |