Bryan Bindrich
- License
- S6196
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6196 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Feb 2020 to Apr 2022
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Roly Construction, Skyline Construction
- Engineers
- Amit Wadhwa, Levi G. Abarte
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2022 | Completed final sign-off Mar 2023 | 50 Fremont St | Skyline Construction | roof: replacement of (e) 2040-ton capacity 3-cell & open draw through cooling tower at roof. structural details included.Details
roof: replacement of (e) 2040-ton capacity 3-cell & open draw through cooling tower at roof. structural details included. | $1,500,000 |
| Feb 7, 2020 | Completed final sign-off Mar 2021 | 841 Vallejo St | Roly Construction | relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes.Details
relocate kitchen to dining rm, convert the original kitchen to bath. remodel 1 e bath. construct new non structural partitions, 2 skylights, light fixtures, millworks, and finishes. | $60,000 |