Kevin Lesley Whitlock
- Listed as
- authorized agent-others, contractor
- Firm
- Mckinley Construction Partners Llc
- Based in
- Woodland
- On San Francisco permits
- Jul 2022 to Dec 2022
4 permits since 2000 (contractor on 4 permits, authorized agent-others on 1 permit): 2 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Velex Inc (3)
- Engineers
- Sigmund Reboquio (4)
- Subcontractors
- Steven Torres
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2022 | In progress issued Aug 2024 | 1465 25th St | Mckinley Construction Partners Llc | removal of all old & unused (e) telecom equipment. after this removal, patch / restore to pre-project conditions.Details
removal of all old & unused (e) telecom equipment. after this removal, patch / restore to pre-project conditions. | $4,000 |
| Aug 26, 2022 | Never finaled issued May 2023, no final | 1135 Evans Av | Mckinley Construction Partners Llc, Velex Inc | sprint has contracted velex to remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site.Details
sprint has contracted velex to remove existing equipment, including electrical connections, off of the existing rooftop telecommunications site. | $12,000 |
| Jul 15, 2022 | Completed final sign-off May 2024 | 4377 Mission St | Mckinley Construction Partners Llc, Velex Inc | t-mobile has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site.Details
t-mobile has contracted velex to remove existing equipment, including electrical connections, off of the exiting rooftop telecommunications site. | $12,000 |
| Jul 7, 2022 | Completed final sign-off May 2024 | 1334 Van Ness Av | Mckinley Construction Partners Llc, Velex Inc | remove existing equipment,including electrical connections,off of the existing rooftop telecommunications site.Details
remove existing equipment,including electrical connections,off of the existing rooftop telecommunications site. | $12,000 |