Bradford Tardy
- Listed as
- architect
- Firm
- Bradford C. Tardy Architect
- Based in
- Tiburon
- On San Francisco permits
- Jul 2005 to Sep 2025
21 permits since 2000 (architect on 21 permits): 16 completed, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Mar 2026 | 85 Burnett Av | Metro Construction Inc. | convert entire first floor into adu, remove internal circular stair from 1st flr to 2nd flr. infill flr/clg where stair removed. no other work is required to convert existing space into an adu. note: entire 1st flr was existing, unconditioned space prior to 2012. space was completely built out intoDetails
convert entire first floor into adu, remove internal circular stair from 1st flr to 2nd flr. infill flr/clg where stair removed. no other work is required to convert existing space into an adu. note: entire 1st flr was existing, unconditioned space prior to 2012. space was completely built out into | $7,500 |
| Sep 27, 2024 | Completed final sign-off Jan 2025 | 2750 Taylor St | Metro Construction Inc. | rev 20240346999- work performed to comply with abe program revise permit to exclude sidewalk work request unreasonable hardship. delete parking compliance work . abe 202401179293Details
rev 20240346999- work performed to comply with abe program revise permit to exclude sidewalk work request unreasonable hardship. delete parking compliance work . abe 202401179293 | |
| Mar 11, 2024 | Completed final sign-off Jan 2025 | 2750 Taylor St | Metro Construction Inc. | accessible business entrance program per ordinance 51-16; work performed to comply with abe program as follows repaint 4 (e) ada parking stalls remove and replace approx 54' of (e) sidewalk, curb and gutter to create level landing at (e) store front entry door abe permit number 202401179293Details
accessible business entrance program per ordinance 51-16; work performed to comply with abe program as follows repaint 4 (e) ada parking stalls remove and replace approx 54' of (e) sidewalk, curb and gutter to create level landing at (e) store front entry door abe permit number 202401179293 | $56,000 |
| Mar 4, 2024 | Completed final sign-off Sep 2024 | 2720 Taylor St | Metro Construction Inc. | work perfromed to comply w/abe program #201903295632-repaint 4 (e) ada parking spacesDetails
work perfromed to comply w/abe program #201903295632-repaint 4 (e) ada parking spaces | $3,000 |
| Jul 26, 2023 | Completed final sign-off Dec 2023 | 1572 08th Av | Metro Construction Inc. | remodel kitchen in smae location, close off doorway to kitchen; install new bathroom in existing room; install 1 new window in bathroom facing rear yard. no change to exterior (except rear yard window) or changes to foot print of house. no additional spaceDetails
remodel kitchen in smae location, close off doorway to kitchen; install new bathroom in existing room; install 1 new window in bathroom facing rear yard. no change to exterior (except rear yard window) or changes to foot print of house. no additional space | $45,000 |
| Mar 24, 2023 | Completed final sign-off Oct 2023 | 507 Clement St | Metro Construction Inc. | to comply with the accessible business entrance program per ordinance 51-16 work requied to comply with abe program repair eintry door automatci door operator, install sinage at entry door get pg&e to raise electric vault in sidewalk abe# 2018-1113-93Details
to comply with the accessible business entrance program per ordinance 51-16 work requied to comply with abe program repair eintry door automatci door operator, install sinage at entry door get pg&e to raise electric vault in sidewalk abe# 2018-1113-93 | $500 |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 519 Clement St | Metro Construction Inc. | accessible business entrance program per ordinance 51-16 work requied to comply with abe program: remove and replace concrete and tile on inside of entry door to correct slope, perminantly lock right hand door install accessibility signage abe# 2018-1113-2395Details
accessible business entrance program per ordinance 51-16 work requied to comply with abe program: remove and replace concrete and tile on inside of entry door to correct slope, perminantly lock right hand door install accessibility signage abe# 2018-1113-2395 | $5,000 |
| Mar 24, 2023 | Completed final sign-off Aug 2023 | 547 Clement St | Metro Construction Inc. | 547 clement: work required to comply with the abe program. install accessibility signage to direct disables compliant entryway/entry door abe 201811132397Details
547 clement: work required to comply with the abe program. install accessibility signage to direct disables compliant entryway/entry door abe 201811132397 | $250 |
| Mar 24, 2023 | Expired or cancelled cancelled Jan 2026 | 521 Clement St | comply with abe program: install automatic entry dbl door operator and switches,remove and replace concrete on sidewalk to create compliant slope at entry door.install accessibility signage abe 202212085369.pull sfdpw minor sidewalk encroachment permit mse on line.sfdpw street permit onlineDetails
comply with abe program: install automatic entry dbl door operator and switches,remove and replace concrete on sidewalk to create compliant slope at entry door.install accessibility signage abe 202212085369.pull sfdpw minor sidewalk encroachment permit mse on line.sfdpw street permit online | $9,250 | |
| Nov 9, 2022 | Completed final sign-off Oct 2024 | 1923 Pierce St | Archteype Design Builder | foundation replacement: replace all extg brick foundation with concrete structure. build out basement level with mud room, media room and bathroom. upstairs: install new header at kitchen to backyard doorway, reconfigure garage level secondary egress through side yard.Details
foundation replacement: replace all extg brick foundation with concrete structure. build out basement level with mud room, media room and bathroom. upstairs: install new header at kitchen to backyard doorway, reconfigure garage level secondary egress through side yard. | $375,000 |
| Apr 18, 2022 | Expired or cancelled cancelled Jan 2026 | 360 Post St | 4th & 5th fl: office tenant improvement. remodel portion of (e) office space. work includes: demo & construction of partitions, electrica, mechanical, plumbing, ceiling & finishes.Details
4th & 5th fl: office tenant improvement. remodel portion of (e) office space. work includes: demo & construction of partitions, electrica, mechanical, plumbing, ceiling & finishes. | $172,418 | |
| Aug 15, 2018 | Completed final sign-off Jan 2019 | 620 Laguna St | Hardesty And Associates | first time interior t.i. for hair beauty salon. no exterior or signage work. new buildingDetails
first time interior t.i. for hair beauty salon. no exterior or signage work. new building | $325,125 |
| Apr 4, 2016 | Completed final sign-off May 2016 | 350 Parnassus Av | Rcp Construction Inc | suite 201 revision to pa 2016-0121-7652, return restroom door & counter to original condition. install electric door operator and remove switches. do not cut down counterDetails
suite 201 revision to pa 2016-0121-7652, return restroom door & counter to original condition. install electric door operator and remove switches. do not cut down counter | |
| Mar 15, 2016 | Completed final sign-off Aug 2016 | 386 Oxford St | Columba Anthony Duffy | remodel kitchen, add a master bath, reconfigure bedroom walls, add skylights, master closet moves to new location. skylights less than 20% of roof area.Details
remodel kitchen, add a master bath, reconfigure bedroom walls, add skylights, master closet moves to new location. skylights less than 20% of roof area. | $100,000 |
| Oct 16, 2015 | Never finaled issued Oct 2015, no final | 1480 Haight St | Metro Construction Inc., Michael Heavey Construction | remove and replace concrete sidewalk squares req by sfdpw. remove steel sidewalk vault door and replace with structural slabDetails
remove and replace concrete sidewalk squares req by sfdpw. remove steel sidewalk vault door and replace with structural slab | $10,000 |
| Nov 4, 2013 | Expired or cancelled cancelled Jul 2016 | 123 Kearny St | Atkinson Building | revision to app#201308204748. revise plans as follows: add 3 exterior wall mounted lights.Details
revision to app#201308204748. revise plans as follows: add 3 exterior wall mounted lights. | $500 |
| Aug 20, 2013 | Completed final sign-off Nov 2013 | 123 Kearny St | Atkinson Building | 1st floor-new t.i remodel-add 2 ada toilet rooms, counter space, breakroom & office. demo pa# 2010-0108-4416 & ext storefront pa# 2012-0315-6123Details
1st floor-new t.i remodel-add 2 ada toilet rooms, counter space, breakroom & office. demo pa# 2010-0108-4416 & ext storefront pa# 2012-0315-6123 | $119,000 |
| Dec 3, 2012 | Completed final sign-off Nov 2013 | 2501 Bryant St | Metro Construction Inc. | install (n) stair case from bsmt to ground fl & mezzanie. install (n) ada toilet room& accessibility to space by altering sidewalk. upgrade egress enclosure from bsmt.Details
install (n) stair case from bsmt to ground fl & mezzanie. install (n) ada toilet room& accessibility to space by altering sidewalk. upgrade egress enclosure from bsmt. | $50,000 |
| Jun 29, 2010 | Completed final sign-off Apr 2012 | 2695 Sacramento St | Columba Anthony Duffy | add a full kitchen to family room on exist lower level. existing stair between floors shall remain. elec & plumb will be a part of this kitchen addition. change use from (e) commercial to 2nd residential space.Details
add a full kitchen to family room on exist lower level. existing stair between floors shall remain. elec & plumb will be a part of this kitchen addition. change use from (e) commercial to 2nd residential space. | $40,000 |
| Nov 21, 2005 | Expired or cancelled expired Apr 2011 | 1480 Haight St | Metro Construction Inc. | to comply w/ nov 200562834 dt 8/27/2005.Details
to comply w/ nov 200562834 dt 8/27/2005. | $7,000 |
| Jul 7, 2005 | Completed final sign-off Nov 2005 | 170 Sutter St | Metro Construction Inc. | interior fit out of an (e) space for a shoe store. all walls, storefront and restroom are (e).Details
interior fit out of an (e) space for a shoe store. all walls, storefront and restroom are (e). | $110,000 |