Permit GraphShortlistSan Francisco building permits since 2000

Spascond Eng. Consult.

License
C35919
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C35919 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Spascond Engineering Cons.
On San Francisco permits
Jan 2005 to Jan 2009

4 permits since 2000 (engineer on 3 permits, architect on 1 permit): 3 completed, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Law Construction, Ren Lei Construction Co
Architects
Tommy Kin Hong Lee
Engineers
Hawk Lee
Authorized agents
Ronald Yu (2)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 27, 2009Expired or cancelled
withdrawn May 2009
2514 23rd Avstructural work on 1st floor framing, new retaining wall(replace existing damaged wall in kind) to address complaint #200988255. shoring under separate permit prior to start construction. obtain cal/osha permit prior to excavation and construction.
Details
Permit
200901270870
Permit issued
Jan 29, 2009

structural work on 1st floor framing, new retaining wall(replace existing damaged wall in kind) to address complaint #200988255. shoring under separate permit prior to start construction. obtain cal/osha permit prior to excavation and construction.

Open the permit page

$25,000
Mar 26, 2007Completed
final sign-off Apr 2010
1827 14th AvRen Lei Construction Corear additoin of 2 floors, 11'6 as shown on plans, interior remodeling on 3 floors
Details
Permit
200703267268
Permit issued
Dec 22, 2008
Final sign-off
Apr 14, 2010

rear additoin of 2 floors, 11'6 as shown on plans, interior remodeling on 3 floors

Open the permit page

$150,000
Oct 16, 2006Completed
final sign-off Feb 2007
400 Spear St(unit 105) upgrade existing closet opening install new steel frame
Details
Permit
200610165057
Permit issued
Oct 16, 2006
Final sign-off
Feb 15, 2007

(unit 105) upgrade existing closet opening install new steel frame

Open the permit page

$3,500
Jan 19, 2005Completed
final sign-off Feb 2005
1274 Noe StLaw Constructionas built plans for app#200401224613.
Details
Permit
200501193553
Permit issued
Feb 2, 2005
Final sign-off
Feb 7, 2005

as built plans for app#200401224613.

Open the permit page