Bob Tedrick
- Listed as
- authorized agent-others, contractor
- Firm
- B T C Bob Tedrick Construction Inc
- Based in
- Livermore
- On San Francisco permits
- Aug 2022 to Aug 2026
7 permits since 2000 (contractor on 7 permits, authorized agent-others on 2 permits): 5 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 790 07th Av | B T C Bob Tedrick Construction Inc | unit #101: revision to #202601224272. framing repairs on one side elevation of buildingDetails
unit #101: revision to #202601224272. framing repairs on one side elevation of building | $75,000 |
| Jan 22, 2026 | In progress issued Jan 2026 | 790 07th Av | B T C Bob Tedrick Construction Inc | remove/replace 1174 sf stucco, remove/replace 8) 5030 & 2) 5040 windows, exterior stair landing membrane. windows are all in kind.Details
remove/replace 1174 sf stucco, remove/replace 8) 5030 & 2) 5040 windows, exterior stair landing membrane. windows are all in kind. | $93,000 |
| Dec 11, 2024 | Completed final sign-off May 2025 | 7 Burnett Ave North Av | B T C Bob Tedrick Construction Inc | unit 2- repair (e) roof deck , replace damaged parts ion kind and remove and resinstall (e) guardrail in kindDetails
unit 2- repair (e) roof deck , replace damaged parts ion kind and remove and resinstall (e) guardrail in kind | $10,000 |
| Jan 9, 2024 | Completed final sign-off Mar 2025 | 1327 07th Av | B T C Bob Tedrick Construction Inc | unit #9: partial and limited elevated deck framing repairDetails
unit #9: partial and limited elevated deck framing repair | $8,500 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 3 Burnett Ave North Av | B T C Bob Tedrick Construction Inc | unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weightDetails
unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weight | $16,000 |
| May 10, 2023 | Completed final sign-off Oct 2023 | 3 Burnett Ave North Av | B T C Bob Tedrick Construction Inc | unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight.Details
unit 3: repair e deck walking surface only, like for like and correct waterproofing damage. no change made to structural system. orig plan 7912459. repairs do not alter orig building or seismic force resisting system or improse any additional weight. | $16,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 5 Burnett Ave North Av | B T C Bob Tedrick Construction Inc | unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes.Details
unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes. | $12,000 |