Bill Daley
- License
- SE3526
- Professional engineer; the board does not list SE as a license type, so the discipline cannot be read from the number
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up SE3526 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Hohbach-Lewin, Inc
- On San Francisco permits
- Mar 2013 to Dec 2017
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Anderson - Niswander Seismic Retrofit In, Nieto Valle Construction, Scott Anderson Gen.Engr.Contr(Sage), Seismic Retrofitters Inc.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2017 | Completed final sign-off Jul 2019 | 2 Castro St | Nieto Valle Construction | to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4Details
to comply with nov 201719241 seismic retrofit. 2016 cebc appendix a-4 | $40,000 |
| Sep 15, 2016 | Expired or cancelled cancelled Feb 2019 | 611 Guerrero St | Seismic Retrofitters Inc., Scott Anderson Gen.Engr.Contr(Sage) | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $45,000 |
| Mar 11, 2013 | Completed final sign-off Apr 2013 | 2 Castro St | Anderson - Niswander Seismic Retrofit In | add 1st floor shear wall in fast-west direction.Details
add 1st floor shear wall in fast-west direction. | $14,500 |